Tailwater and Control Tower paving, sealing, and striping for Nolin River Lake
| Agency: |
DEPT OF DEFENSE |
| State: |
Kentucky |
| Type of Government: |
Federal |
| FSC Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| NAICS Category: |
- 237310 - Highway, Street, and Bridge Construction
|
| Posted Date: |
Sep 3, 2026 |
| Due Date: |
Sep 10, 2026 |
| Solicitation No: |
W912QR26QA079 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Description
Tailwater and Control Tower paving, sealing, and striping for Nolin River Lake
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION GREAT LAKES AND OHIO
Sub Command 2
ENDIST LOUISVILLE
Office
W072 ENDIST LOUISVILLE
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Sep 03, 2026 01:58 pm EDT
-
Original Published Date: Aug 17, 2026 01:25 pm EDT
-
Updated Date Offers Due: Sep 10, 2026 01:00 pm EDT
-
Original Date Offers Due: Sep 01, 2026 01:00 pm EDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Sep 03, 2027
-
Original Inactive Date:
Aug 17, 2027
-
Initiative:
Classification
Description View Changes
**** Amendment 0001 has been posted replacing the SOW and PBS in their entirety, the Quote due date has been extended to 10 September 2026 by 12:00pm ET****Tailwater and Control Tower paving, sealing, and striping for Nolin River Lake The contractor������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will shall begin within 10 calendar days of Notice to Proceed and must conclude 90 calendar days after Notice to Proceed.Location:United States Corps of EngineersNolin River Lake2150 Nolin Dam RoadMammoth Cave, KY 42259This procurement is 100% set-aside for Small Business, NAICS 237310, Size Standard $45M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. please reach out to Kerry Sanders at 270- 286-6613 to schedule a site visit.Quotes are due 1 September 2026, 12:00PM Eastern Time.
Attachments/Links
Contact Information
Contracting Office Address
-
KO CONTRACTING DIVISION 220 W MAIN STREET 3RD FLOOR
-
LOUISVILLE , KY 40202-2230
-
USA
Secondary Point of Contact
History
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
General Information Document ID RFB-785-2700000171-2 Status Amended Description RFB-102-27 CHFS OAK Replace HVAC
State Government of Kentucky
Due by 11/10/2026
General Information Document ID RFB-785-2700000199-1 Status Open Description RFB-111-27 DMA -Roof Repair Bluegrass
State Government of Kentucky
Due by 11/24/2026
Follow The Mission and Installation Contracting Command (MICC), Fort Campbell, KY, is issuing
DEPT OF DEFENSE
Due by 9/16/2027
Follow The Mission and Installation Contracting Command (MICC), Fort Campbell, KY, is issuing
DEPT OF DEFENSE
Due by 9/16/2027
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.