35% DESIGN CRITERIA
RALEIGH-DURHAM INTERNATIONAL AIRPORT
TERMINAL 1 LOBBY EXPANSION AND RESTROOM ADDITION
1600 John Brantley Boulevard
Morrisville North Carlonia
Project No. P2403.00
Architect: Andre L. Johnson Architects, PLLC
3109 Poplarwood Court, Suite 302
Raleigh, North Carolina 27604
919-815-8753
Specifications Consultant: Rosa D. Cheney AIA, PLLC
4075 Wilson Boulevard, 8th Floor
Arlington, Virginia 22203
703-650-7442
Structural Engineer: NV5 Global, Inc.
1101 Haynes Street, Suite 207
Raleigh, North Carlonia 27604
919-821-7146
Mechanical, Plumbing, Loring Consulting Engineers, Inc.
Electrical Engineers: 1007 Slater Road, Suite 120
Durham, North Carlonia 27703
919-355-5521
Civil Engineer: NV5 Global, Inc.
1101 Haynes Street, Suite 207
Raleigh, North Carlonia 27604
919-821-7146
Issued: September 19, 2025
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria
September 19, 2025
DOCUMENT 000111
TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
000101 Title Page
000111 Table of Contents
DIVISION 01 GENERAL REQUIREMENTS
Not Applicable
DIVISION 02 EXISTING CONDITIONS
024119 Selective Demolition
DIVISION 03 CONCRETE
031000 Concrete Forming and Accessories
032000 Concrete Reinforcing
033000 Cast-In-Place Concrete
DIVISION 04 MASONRY
042000 Unit Masonry
DIVISION 05 METALS
051200 Structural Steel Framing
052100 Steel Joist Framing
053100 Steel Decking
054000 Cold-Formed Metal Framing
055000 Metal Fabrications
055213 Pipe and Tube Railings
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry
064100 Architectural Wood Casework
DIVISION 07 THERMAL AND MOISTURE PROTECTION
072100 Thermal Insulation
072619 Below-Slab Vapor Retarder
072726 Fluid-Applied Membrane Air Barriers
074213.19 Insulated Metal Wall Panels
075400 Thermoplastic Membrane Roofing
076200 Sheet Metal Flashing and Trim
077100 Roof Specialties
077129 Manufactured Roof Expansion Joints
077200 Roof Accessories
078100 Applied Fire Protection
TABLE OF CONTENTS 000110 - 1
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria
September 19, 2025
078413 Penetration Firestopping
078443 Joint Firestopping
079200 Joint Sealants
079513 Expansion Joint Cover Assemblies
DIVISION 08 OPENINGS
081113 Hollow Metal Doors and Frames
081119 Stainless-Steel Doors and Frames
083113 Access Doors and Frames
084313 Aluminum-Framed Storefronts
087100 Door Hardware
088000 Glazing
DIVISION 09 FINISHES
092216 Non-Structural Metal Framing
092900 Gypsum Board
093000 Tiling
095113 Acoustical Panel Ceilings
096100 Flooring Treatment
096623 Resinous Matrix Terrazzo Flooring
096813 Tile Carpeting
097813 Metal Interior Wall Paneling
099000 Painting and Coatings
DIVISION 10 SPECIALTIES
101400 Signage
102113.14 Stainless-Steel Toilet Compartments
102600 Wall and Door Protection
102800 Toilet, Bath, and Laundry Accessories
DIVISION 11 EQUIPMENT
Not Applicable
DIVISION 12 FURNISHINGS
123661.16 Solid Surfacing Countertops
123661.19 Quartz Agglomerate Countertops
DIVISION 13 SPECIAL CONSTRUCTION
Not Applicable
DIVISION 14 CONVEYING EQUIPMENT
Not Applicable
DIVISION 21 FIRE SUPPRESSION
210500 General Fire Suppression Requirements
211200 Fire-Suppression Standpipes
211313 Wet-Pipe Sprinkler Systems
TABLE OF CONTENTS 000110 - 2
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria
September 19, 2025
DIVISION 22 PLUMBING
220500 General Plumbing Requirements
220503 Pipes and Tubes for Plumbing Piping and Equipment
220516 Expansion Fittings and Loops for Plumbing Piping
220523 General-Duty Valves for Plumbing Piping
220529 Hangers and Supports for Plumbing Piping and Equipment
220553 Identification for Plumbing Piping and Equipment
220700 Plumbing Insulation
221100 Facility Water Distribution
221300 Facility Sanitary Sewerage
221400 Facility Storm Drainage
224000 Plumbing Fixtures
DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING
230500 General Mechanical Requirements
230501 Scope of HVAC Work
230503 Pipes and Tubes for HVAC Piping and Equipment
230513 Common Motor Requirements for HVAC Equipment
230514 Motor Controls
230523 General-Duty Valves for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment
230548 Noise and Vibration Controls for HVAC Piping and Equipment
230553 Identification for HVAC Piping and Equipment
230593 Testing, Adjusting, and Balancing for HVAC
230700 HVAC Insulation
230900 Instrumentation and Control for HVAC
230923 Direct-Digital Control System for HVAC
230993 Sequence of Operations for HVAC Controls
232116 Hydronic Piping Specialties
233100 HVAC Ducts and Casings
233300 Air Duct Accessories
233400 HVAC Fans
233600 Air Terminal Units
233700 Air Outlets and Inlets
237300 Central-Station Air-Handling Units
DIVISION 25 INTEGRATED AUTOMATION
Not Applicable
DIVISION 26 ELECTRICAL
260500 General Electrical Requirements
250502 Inspections and Tests
260519 Low-Voltage Electrical Power Conductors and Cables
260526 Grounding and Bonding for Electrical Systems
260529 Hangers and Supports for Electrical Systems
260533 Raceways and Boxes for Electrical Systems
260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling
260553 Identification for Electrical Systems
260923 Lighting Control Devices
262416 Panelboards
TABLE OF CONTENTS 000110 - 3
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria
September 19, 2025
262726 Wiring Devices
262813 Fuses
262819 Enclosed Switches
264113 Lightning Protection for Structures
265100 Interior Lighting
265213 Emergency and Exit Lighting
DIVISION 27 COMMUNICATIONS
Not Applicable
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
283100 Fire Alarm System
DIVISION 31 EARTHWORK
312000 Earth Moving
312500 Erosion & Sediment Controls
DIVISION 32 EXTERIOR IMPROVEMENTS
321313 Concrete Paving
DIVISION 33 UTILITIES
330500 Common Work Results for Utilities
331000 Site Water Utilities
334000 Site Storm Drainage Utilities
DIVISION 34 TRANSPORTATION
Not Applicable
DIVISION 35 WATERWAY AND MARINE
Not Applicable
DIVISION 40 PROCESS INTERCONNECTIONS
Not Applicable
DIVISION 41 MATERIAL PROCESSING AND HANDLING EQUIPMENT
Not Applicable
DIVISION 42 PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
Not Applicable
DIVISION 43 PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE
EQUIPMENT
Not Applicable
TABLE OF CONTENTS 000110 - 4
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria
September 19, 2025
DIVISION 44 POLLUTION AND WASTE CONTROL EQUIPMENT
Not Applicable
DIVISION 45 SPECIFIC MANUFACTURING EQUIPMENT
Not Applicable
DIVISION 46 WATER AND WASTEWATER EQUIPMENT
Not Applicable
DIVISION 48 ELECTRICAL POWER GENERATION
Not Applicable
END OF DOCUMENT
TABLE OF CONTENTS 000110 - 5
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria Package
September 19, 2025
SECTION 024119
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
B. See Division 01 Section "Construction Waste Management and Disposal" for disposal of
demolished materials.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless
indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Owner.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and
reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not
otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition
and removal work, with starting and ending dates for each activity, interruption of utility services,
use of elevator and stairs, and locations of temporary partitions and means of egress.
B. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility
licensed to accept hazardous wastes.
1. Comply with submittal requirements in Division 01 Section "Construction Waste
Management and Disposal."
1.4 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work
similar in material and extent to that indicated for this Project.
SELECTIVE DEMOLITION 024119 - 1
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria Package
September 19, 2025
B. EPA notification regulations before beginning selective demolition. Comply with hauling and
disposal regulations of authorities having jurisdiction.
C. Standards: Comply with ANSI A10.6 and NFPA 241.
D. Predemolition Conference: Conduct conference at Project site.
1.5 PROJECT CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far
as practical.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding
with selective demolition.
D. Hazardous Materials: It is unknown whether hazardous materials will be encountered in the
Work.
1. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Architect and Owner. Owner will remove hazardous materials under a
separate contract.
E. Storage or sale of removed items or materials on-site is not permitted.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against
damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.6 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or
damaged during selective demolition, by methods and with materials so as not to void existing
warranties.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of
selective demolition required.
SELECTIVE DEMOLITION 024119 - 2
Raleigh-Durham International Airport
Terminal 1 Lobby Expansion and Restroom Addition
35% Design Criteria Package
September 19, 2025
C. Inventory and record the condition of items to be removed and reinstalled and items to be
removed and salvaged.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended
function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to Architect.
E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition
activities.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them
against damage during selective demolition operations.
B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility
services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off indicated utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, before
proceeding with selective demolition provide temporary services/systems that bypass
area of selective demolition and that maintain continuity of services/systems to other
parts of building.
3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal
remaining portion of pipe or conduit after bypassing.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal
operations to ensure minimum interference with roads, streets, walks, walkways, and other
adjacent occupied and used facilities.
1. Comply with requirements for access and protection specified in Division 01 Section
"Temporary Facilities and Controls."
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent
injury to people and damage to adjacent buildings and facilities to remain.
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required
to preserve stability and prevent movement, settlement, or collapse of construction and finishes
to remain, and to prevent unexpected or uncontrolled movement or collapse of construction
being demolished.
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new
construction and as indicated. Use methods required to complete the Work within limitations of
governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use
cutting methods least likely to damage construction to remain or adjoining construction.
SELECTIVE DEMOLITION 024119 - 3
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Solicitation Number: 678-WCRWD-08052026 Project Title: Winkler Creek Raw Water Intake Dredging Description: The
State Government of North Carolina
Bid Due: 8/05/2026
Follow Construct 145th Security Forces Building Active Contract Opportunity Notice ID W50S87-26-B-A002 Related
DEPT OF DEFENSE
Bid Due: 8/14/2026
Solicitation Number: 115C-PCC-014 Project Title: Pitt CC Main Campus Water Line Improvements Description:
State Government of North Carolina
Bid Due: 8/20/2026
Follow Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC | Active Contract Opportunity
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/07/2026