T1 Lobby Expansion & Restroom Addition (Design/Build) Addendum 1

Agency: Raleigh-Durham Airport Authority
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Mar 30, 2026
Due Date: Apr 14, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • T1 Lobby Expansion & Restroom Addition (Design/Build)
  • Attachment Preview

    35% DESIGN CRITERIA
    RALEIGH-DURHAM INTERNATIONAL AIRPORT
    TERMINAL 1 LOBBY EXPANSION AND RESTROOM ADDITION
    1600 John Brantley Boulevard
    Morrisville North Carlonia
    Project No. P2403.00
    Architect: Andre L. Johnson Architects, PLLC
    3109 Poplarwood Court, Suite 302
    Raleigh, North Carolina 27604
    919-815-8753
    Specifications Consultant: Rosa D. Cheney AIA, PLLC
    4075 Wilson Boulevard, 8th Floor
    Arlington, Virginia 22203
    703-650-7442
    Structural Engineer: NV5 Global, Inc.
    1101 Haynes Street, Suite 207
    Raleigh, North Carlonia 27604
    919-821-7146
    Mechanical, Plumbing, Loring Consulting Engineers, Inc.
    Electrical Engineers: 1007 Slater Road, Suite 120
    Durham, North Carlonia 27703
    919-355-5521
    Civil Engineer: NV5 Global, Inc.
    1101 Haynes Street, Suite 207
    Raleigh, North Carlonia 27604
    919-821-7146
    Issued: September 19, 2025

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria
    September 19, 2025
    DOCUMENT 000111
    TABLE OF CONTENTS
    DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
    000101 Title Page
    000111 Table of Contents
    DIVISION 01 GENERAL REQUIREMENTS
    Not Applicable
    DIVISION 02 EXISTING CONDITIONS
    024119 Selective Demolition
    DIVISION 03 CONCRETE
    031000 Concrete Forming and Accessories
    032000 Concrete Reinforcing
    033000 Cast-In-Place Concrete
    DIVISION 04 MASONRY
    042000 Unit Masonry
    DIVISION 05 METALS
    051200 Structural Steel Framing
    052100 Steel Joist Framing
    053100 Steel Decking
    054000 Cold-Formed Metal Framing
    055000 Metal Fabrications
    055213 Pipe and Tube Railings
    DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
    061000 Rough Carpentry
    064100 Architectural Wood Casework
    DIVISION 07 THERMAL AND MOISTURE PROTECTION
    072100 Thermal Insulation
    072619 Below-Slab Vapor Retarder
    072726 Fluid-Applied Membrane Air Barriers
    074213.19 Insulated Metal Wall Panels
    075400 Thermoplastic Membrane Roofing
    076200 Sheet Metal Flashing and Trim
    077100 Roof Specialties
    077129 Manufactured Roof Expansion Joints
    077200 Roof Accessories
    078100 Applied Fire Protection
    TABLE OF CONTENTS 000110 - 1

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria
    September 19, 2025
    078413 Penetration Firestopping
    078443 Joint Firestopping
    079200 Joint Sealants
    079513 Expansion Joint Cover Assemblies
    DIVISION 08 OPENINGS
    081113 Hollow Metal Doors and Frames
    081119 Stainless-Steel Doors and Frames
    083113 Access Doors and Frames
    084313 Aluminum-Framed Storefronts
    087100 Door Hardware
    088000 Glazing
    DIVISION 09 FINISHES
    092216 Non-Structural Metal Framing
    092900 Gypsum Board
    093000 Tiling
    095113 Acoustical Panel Ceilings
    096100 Flooring Treatment
    096623 Resinous Matrix Terrazzo Flooring
    096813 Tile Carpeting
    097813 Metal Interior Wall Paneling
    099000 Painting and Coatings
    DIVISION 10 SPECIALTIES
    101400 Signage
    102113.14 Stainless-Steel Toilet Compartments
    102600 Wall and Door Protection
    102800 Toilet, Bath, and Laundry Accessories
    DIVISION 11 EQUIPMENT
    Not Applicable
    DIVISION 12 FURNISHINGS
    123661.16 Solid Surfacing Countertops
    123661.19 Quartz Agglomerate Countertops
    DIVISION 13 SPECIAL CONSTRUCTION
    Not Applicable
    DIVISION 14 CONVEYING EQUIPMENT
    Not Applicable
    DIVISION 21 FIRE SUPPRESSION
    210500 General Fire Suppression Requirements
    211200 Fire-Suppression Standpipes
    211313 Wet-Pipe Sprinkler Systems
    TABLE OF CONTENTS 000110 - 2

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria
    September 19, 2025
    DIVISION 22 PLUMBING
    220500 General Plumbing Requirements
    220503 Pipes and Tubes for Plumbing Piping and Equipment
    220516 Expansion Fittings and Loops for Plumbing Piping
    220523 General-Duty Valves for Plumbing Piping
    220529 Hangers and Supports for Plumbing Piping and Equipment
    220553 Identification for Plumbing Piping and Equipment
    220700 Plumbing Insulation
    221100 Facility Water Distribution
    221300 Facility Sanitary Sewerage
    221400 Facility Storm Drainage
    224000 Plumbing Fixtures
    DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING
    230500 General Mechanical Requirements
    230501 Scope of HVAC Work
    230503 Pipes and Tubes for HVAC Piping and Equipment
    230513 Common Motor Requirements for HVAC Equipment
    230514 Motor Controls
    230523 General-Duty Valves for HVAC Piping
    230529 Hangers and Supports for HVAC Piping and Equipment
    230548 Noise and Vibration Controls for HVAC Piping and Equipment
    230553 Identification for HVAC Piping and Equipment
    230593 Testing, Adjusting, and Balancing for HVAC
    230700 HVAC Insulation
    230900 Instrumentation and Control for HVAC
    230923 Direct-Digital Control System for HVAC
    230993 Sequence of Operations for HVAC Controls
    232116 Hydronic Piping Specialties
    233100 HVAC Ducts and Casings
    233300 Air Duct Accessories
    233400 HVAC Fans
    233600 Air Terminal Units
    233700 Air Outlets and Inlets
    237300 Central-Station Air-Handling Units
    DIVISION 25 INTEGRATED AUTOMATION
    Not Applicable
    DIVISION 26 ELECTRICAL
    260500 General Electrical Requirements
    250502 Inspections and Tests
    260519 Low-Voltage Electrical Power Conductors and Cables
    260526 Grounding and Bonding for Electrical Systems
    260529 Hangers and Supports for Electrical Systems
    260533 Raceways and Boxes for Electrical Systems
    260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling
    260553 Identification for Electrical Systems
    260923 Lighting Control Devices
    262416 Panelboards
    TABLE OF CONTENTS 000110 - 3

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria
    September 19, 2025
    262726 Wiring Devices
    262813 Fuses
    262819 Enclosed Switches
    264113 Lightning Protection for Structures
    265100 Interior Lighting
    265213 Emergency and Exit Lighting
    DIVISION 27 COMMUNICATIONS
    Not Applicable
    DIVISION 28 ELECTRONIC SAFETY AND SECURITY
    283100 Fire Alarm System
    DIVISION 31 EARTHWORK
    312000 Earth Moving
    312500 Erosion & Sediment Controls
    DIVISION 32 EXTERIOR IMPROVEMENTS
    321313 Concrete Paving
    DIVISION 33 UTILITIES
    330500 Common Work Results for Utilities
    331000 Site Water Utilities
    334000 Site Storm Drainage Utilities
    DIVISION 34 TRANSPORTATION
    Not Applicable
    DIVISION 35 WATERWAY AND MARINE
    Not Applicable
    DIVISION 40 PROCESS INTERCONNECTIONS
    Not Applicable
    DIVISION 41 MATERIAL PROCESSING AND HANDLING EQUIPMENT
    Not Applicable
    DIVISION 42 PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
    Not Applicable
    DIVISION 43 PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE
    EQUIPMENT
    Not Applicable
    TABLE OF CONTENTS 000110 - 4

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria
    September 19, 2025
    DIVISION 44 POLLUTION AND WASTE CONTROL EQUIPMENT
    Not Applicable
    DIVISION 45 SPECIFIC MANUFACTURING EQUIPMENT
    Not Applicable
    DIVISION 46 WATER AND WASTEWATER EQUIPMENT
    Not Applicable
    DIVISION 48 ELECTRICAL POWER GENERATION
    Not Applicable
    END OF DOCUMENT
    TABLE OF CONTENTS 000110 - 5

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria Package
    September 19, 2025
    SECTION 024119
    SELECTIVE DEMOLITION
    PART 1 - GENERAL
    1.1 SUMMARY
    A. This Section includes the following:
    1. Demolition and removal of selected portions of building or structure.
    2. Demolition and removal of selected site elements.
    3. Salvage of existing items to be reused or recycled.
    B. See Division 01 Section "Construction Waste Management and Disposal" for disposal of
    demolished materials.
    1.2 DEFINITIONS
    A. Remove: Detach items from existing construction and legally dispose of them off-site, unless
    indicated to be removed and salvaged or removed and reinstalled.
    B. Remove and Salvage: Detach items from existing construction and deliver them to Owner.
    C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and
    reinstall them where indicated.
    D. Existing to Remain: Existing items of construction that are not to be removed and that are not
    otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
    1.3 SUBMITTALS
    A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition
    and removal work, with starting and ending dates for each activity, interruption of utility services,
    use of elevator and stairs, and locations of temporary partitions and means of egress.
    B. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility
    licensed to accept hazardous wastes.
    1. Comply with submittal requirements in Division 01 Section "Construction Waste
    Management and Disposal."
    1.4 QUALITY ASSURANCE
    A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work
    similar in material and extent to that indicated for this Project.
    SELECTIVE DEMOLITION 024119 - 1

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria Package
    September 19, 2025
    B. EPA notification regulations before beginning selective demolition. Comply with hauling and
    disposal regulations of authorities having jurisdiction.
    C. Standards: Comply with ANSI A10.6 and NFPA 241.
    D. Predemolition Conference: Conduct conference at Project site.
    1.5 PROJECT CONDITIONS
    A. Owner will occupy portions of building immediately adjacent to selective demolition area.
    Conduct selective demolition so Owner's operations will not be disrupted.
    B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far
    as practical.
    C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding
    with selective demolition.
    D. Hazardous Materials: It is unknown whether hazardous materials will be encountered in the
    Work.
    1. If materials suspected of containing hazardous materials are encountered, do not disturb;
    immediately notify Architect and Owner. Owner will remove hazardous materials under a
    separate contract.
    E. Storage or sale of removed items or materials on-site is not permitted.
    F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against
    damage during selective demolition operations.
    1. Maintain fire-protection facilities in service during selective demolition operations.
    1.6 WARRANTY
    A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or
    damaged during selective demolition, by methods and with materials so as not to void existing
    warranties.
    PART 2 - PRODUCTS (Not Used)
    PART 3 - EXECUTION
    3.1 EXAMINATION
    A. Verify that utilities have been disconnected and capped.
    B. Survey existing conditions and correlate with requirements indicated to determine extent of
    selective demolition required.
    SELECTIVE DEMOLITION 024119 - 2

    Raleigh-Durham International Airport
    Terminal 1 Lobby Expansion and Restroom Addition
    35% Design Criteria Package
    September 19, 2025
    C. Inventory and record the condition of items to be removed and reinstalled and items to be
    removed and salvaged.
    D. When unanticipated mechanical, electrical, or structural elements that conflict with intended
    function or design are encountered, investigate and measure the nature and extent of conflict.
    Promptly submit a written report to Architect.
    E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition
    activities.
    3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
    A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them
    against damage during selective demolition operations.
    B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility
    services and mechanical/electrical systems serving areas to be selectively demolished.
    1. Arrange to shut off indicated utilities with utility companies.
    2. If services/systems are required to be removed, relocated, or abandoned, before
    proceeding with selective demolition provide temporary services/systems that bypass
    area of selective demolition and that maintain continuity of services/systems to other
    parts of building.
    3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal
    remaining portion of pipe or conduit after bypassing.
    3.3 PREPARATION
    A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal
    operations to ensure minimum interference with roads, streets, walks, walkways, and other
    adjacent occupied and used facilities.
    1. Comply with requirements for access and protection specified in Division 01 Section
    "Temporary Facilities and Controls."
    B. Temporary Facilities: Provide temporary barricades and other protection required to prevent
    injury to people and damage to adjacent buildings and facilities to remain.
    C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required
    to preserve stability and prevent movement, settlement, or collapse of construction and finishes
    to remain, and to prevent unexpected or uncontrolled movement or collapse of construction
    being demolished.
    3.4 SELECTIVE DEMOLITION
    A. General: Demolish and remove existing construction only to the extent required by new
    construction and as indicated. Use methods required to complete the Work within limitations of
    governing regulations and as follows:
    1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use
    cutting methods least likely to damage construction to remain or adjoining construction.
    SELECTIVE DEMOLITION 024119 - 3

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    Solicitation Number: 678-WCRWD-08052026 Project Title: Winkler Creek Raw Water Intake Dredging Description: The

    State Government of North Carolina

    Bid Due: 8/05/2026

    Follow Construct 145th Security Forces Building Active Contract Opportunity Notice ID W50S87-26-B-A002 Related

    DEPT OF DEFENSE

    Bid Due: 8/14/2026

    Solicitation Number: 115C-PCC-014 Project Title: Pitt CC Main Campus Water Line Improvements Description:

    State Government of North Carolina

    Bid Due: 8/20/2026

    Follow Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC | Active Contract Opportunity

    VETERANS AFFAIRS, DEPARTMENT OF

    Bid Due: 8/07/2026