Swansea, MA – Route 6 Corridor Sewer Collection System CWSRF # 16705
| Agency: | Wright-Pierce |
|---|---|
| State: | Massachusetts |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 13, 2025 |
| Due Date: | Aug 28, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The Project includes the following Work:
The work consists of two primary components.
The first is constructing the Assonet Pump Station, Cole River Pump Station, RK Pump Station, and Swansea Mall Pump Station; including precast concrete wet well, valve vault, meter vault, sewer force mains, gravity sewer, water service, electrical and control equipment, paving, fencing, site lighting, site grading and restoration, equipment start-up and pump station commissioning.
The second is, the installation of gravity sewer mains, manhole structures, force mains, air release valves and structures, force main cleanout structures, sewer laterals, directional drilling of force main, trench paving and site restoration, and all performance testing to construct the sewer collection system in the area generally described as the Route 6 Corridor and as shown on the plans.
- Follow the hyperlink to the project provided at the end of the project information.
-
First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.
See Also
Bid Solicitation: BD-24-1076-OCDDE-OCD01-93430 Responses Due in 3648 Days, 3 Hours, 26 Minutes Header
Commonwealth of Massachusetts
Due by 9/23/2033
Follow Snow Removal and Sanding Services, Barre Falls Dam, Hubbardston, Barre, and Oakham,
DEPT OF DEFENSE
Follow Spillway Tree Removal Services, Birch Hill Dam and Tully Lake Dam, Royalston,
DEPT OF DEFENSE
Bid Number: Finberg-101526-900 Bid Title: Disposition of City-Owned Property - Finberg School -
City of Attleboro
Due by 10/15/2026