Swan Creek Channel Restoration Phase 1, D460

Agency: Pierce County
State: Washington
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 9, 2025
Due Date: Apr 30, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID:

Title: Swan Creek Channel Restoration Phase 1, D460

Addenda: 0

Release Date: 4/9/2025

Due Date: 4/30/2025

Post Information
Posted At:Wed, Apr 9, 2025 8:00 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

This project provides for the improvement of Swan Creek between 64th Street East and Pioneer Way East. The project area is within both Pierce County and the City of Tacoma and spans the jurisdictional boundary between the two.

Work includes the installation of in-stream engineered log structures using various material delivery and installation methods including via helicopter, logging equipment, and traditional heavy equipment. The work will include procurement, delivery, and assembling of large to small diameter wood, furnishing and driving un-treated timber piles, installing ground anchors, chain lashing, racking, slash, and boulders. The work will include stream isolation and flow diversion and localized dewatering. The work also includes selective clearing and re-incorporation of woody debris into project elements. The project also includes establishing and restoring staging areas and temporary equipment access paths, traffic control, erosion and sediment control, invasive weed removal, seeding, revegetation and other work specified, all in accordance with these Contract Provisions and the Standard Specifications.

This project is funded, in part, by grants from the Washington State Department of Ecology through the Floodplains by Design program and the National Fish and Wildlife Foundation (NFWF) via the National Oceanic Atmospheric Administration (NOAA). Federal funds are associated with the NFWF grant.

Please refer to the Attachments for Contracting Requirements.

Timeline
Release Project Date:
April 9, 2025
Pre-Bid Meeting (Non-Mandatory):
April 16, 2025, 9:00am
Swan Creek Park entrance off Pioneer Way East
Question Submission Deadline:
April 23, 2025, 1:00pm
Submission Deadline:
April 30, 2025, 1:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

RFB | San Poil Forest, 1 Mechanical Slash Pile in McAllister/Keller Ridge area,

The Confederated Tribes of the Colville Reservation

Bid Due: 6/12/2026

RFB | Facilities Construction Department, St. Mary's Mission, Asbestos & Lead Survey |

The Confederated Tribes of the Colville Reservation

Bid Due: 6/30/2026

Solicitation Close Date: 06/24/26 Title: DNR Site Preparation Ground Herbicide- Northwest Region Ref

State Government of Washington

Bid Due: 6/24/2026

SCDRFP26104: 2026 UCF Tree Procurement Snohomish Conservation District (SCD) requires up to 2,000

Snohomish Conservation District

Bid Due: 6/17/2026