2604-SW Stormwater Pump Station Inspection, Repair and Replacement Project Addendum #4

Agency: City of Dade City
State: Florida
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Dec 5, 2025
Due Date: Dec 11, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
2604-SW Stormwater Pump Station Inspection, Repair and Replacement Project (Due: December 11, 2025 by 2:30p.m.)
Mandatory Pre-Bid Meeting on Tuesday, November 18, 2025
Stormwater Pump Station Inspection, Repair, and Replacement Project - Bid Updated
Stormwater Pump Station Inspection, Repair, and Replacement Project - Addendum #1
Addendum #2 Stormwater Pump Station Inspection, Repair, and Replacement Project
Addendum #3 Stormwater Pump Station Inspection, Repair, and Replacement Project
Addendum #4 Stormwater Pump Station Inspection, Repair, and Replacement Project
Stormwater Pump Station Inspection, Repair, and Replacement Project - Survey

Attachment Preview

RFQ NUMBER 2604-SW
Stormwater Pump Station Inspection,
Repair, and Replacement Project
CITY OF DADE CITY
38020 MERIDIAN AVE
DADE CITY, FL 33525
PHONE: (352) 523-5050
FAX: (352)521-1422
Bid Due Date: December 11, 2025
INDEX
RFQ NUMBER 2604-SW
Stormwater Pump Station Inspection,
Repair, and Replacement Project
Part I General Information & Scope of Work ................................................................ Page 4
Part II Information Required from Proposers .................................................................Page 12
Part III Criteria for Selection .......................................................................................... Page 15
The following documents must be returned with your bid:
Drug-Free Workplace Certification................................................................................ Page 17
Public Entity Crime Statement ...................................................................................... Page 19
Anti-Collusion Statement............................................................................................... Page 21
Human Trafficking Affidavit ……………………………………………………………………. Page 22
Conflict of Interest Affidavit ……………………………………………………………………. Page 23
All additional supplemental information requested in the RFP and/or Bid Form
RFP NUMBER 2604-SW
Stormwater Pump Station Inspection,
Repair, and Replacement Project
BID DUE DATE: DECEMBER 11, 2025 AT 2:30 PM
NOTICE IS HEREBY GIVEN that sealed quotes will be received by the City of Dade City (City)
until 2:30 PM, Local Time, December 11, 2025 for the Stormwater Pump Station Inspection,
Repair, and Replacement Project.
Brief Description: The City seeks a qualified contractor to provide inspection, assessment,
repair, and replacement services for the stormwater pump station located at 14820 Citrus
County Drive, Dade City FL 33525. The station includes two (2) short-set turbine pumps with
electric motors and a single control panel that operates both pumps. The work includes
ensuring operational reliability, identifying deficiencies, performing repairs or replacements as
needed, and restoring full functionality.
Scope of Work
Contractor shall perform the following tasks, at minimum:
A. Pump Inspection and Assessment
Remove the two turbine pumps and motors and transport to an approved facility for
teardown and detailed assessment.
Inspect pump components including: engine/motor, impeller, shaft, bearings, stuffing boxes,
bowls, seals, and couplings.
Provide written findings, including recommendations for repair, replacement, or re-use of
components.
Advise City if some components do not need replacement to adjust schedule and cost.
B. Control Panel Replacement
Remove all existing control wires, panel, conduit, floats, generator receptacles, switches,
mounting hardware, and miscellaneous items.
Install new DEP-compliant control panel (model [insert approved equivalent]) with all
mounting hardware, new wiring, conduit, and restraints.
Rewire all pumps, floats, and alarm circuits to the new panel, ensuring proper operation of
all internal components.
Conduct startup, calibration, and testing to ensure proper functionality.
Note: Bypass pumping will only be required for the short 4-day window when both pumps
are offline for panel installation. For all other work, one pump must remain online to maintain
stormwater flow.
C. Functional Testing
Operate all pumps under load or simulated conditions to verify flow, head, vibration, motor
performance, control panel operation, alarms, and proper integration.
Document test results and provide baseline data for future reference.
D. Parts and Materials
Provide all labor, equipment, and materials required for inspection, repair, and replacement,
including:
o Replacement motors (e.g., North American Electric Motors, 40HP, 460V, 3-phase)
o Pump components (shafts, impellers, bearings, bowls, seals)
o Control panel components (circuit breakers, phase monitor, lightning arrestor, alternator
relay, HO-A switches, LED indicators, non-resettable timers, battery backup alarms, wire
channels)
o Miscellaneous installation materials (Unistrut, wiring, conduit, junction boxes, fasteners,
supports, etc.)
E. Timeline and Seasonal Work Window
All work shall be performed during the dry season (November through May) to minimize
impact on stormwater operations.
Only one pump may be taken offline at a time, ensuring at least one pump remains fully
operational.
Bypass pumping is only required for the 4-day period when both pumps are offline for
control panel replacement. Contractor shall coordinate scheduling with City staff to minimize
disruption and maintain system functionality.
F. Documentation and Reporting
Provide detailed reports of all inspections, tests, repairs, and replacements.
Include photographs, as-built diagrams, wiring schematics, and recommended maintenance
plan.
Provide warranty information for replaced components.
Standards and Compliance
All work must meet NEC, NFPA, OSHA, DEP, and City/County standards.
Contractor responsible for obtaining necessary permits and inspections.
Work must comply with manufacturer specifications for all pumps, motors, and control
equipment.
Schedule and Deliverables
Inspection, teardown, and assessment of pumps: 2 weeks
Control panel removal and replacement (including 4-day bypass window): 1 week
Full repair/replacement completion and testing: 8-10 weeks
Contractor to provide weekly progress updates and final written report with as-built
documentation.
Safety and Site Controls
Maintain site safety, barricades, and traffic control per MUTCD or local standards.
Follow proper lock-out/tag-out and confined-space protocols.
Coordinate crane and heavy equipment operations safely.
Cost Proposal Requirements
Submit detailed cost proposal including labor, materials, mobilization/demobilization, crane,
limited bypass pumping (4-day window), freight, and contingency.
Provide unit pricing for any additional or unforeseen repairs.
Acceptance Criteria
Work will be accepted when all pumps and control systems are operational, tested under
load, alarms functional, and all documentation delivered.
PART I GENERAL INFORMATION
1.1. PURPOSE
The City of Dade City is seeking qualified firms and to establish a firm fixed price to ensure that
the City is always receiving the most economical service costs while maximizing the quality
and level of service. A contract/agreement resulting from this RFP shall be subject to the terms
and conditions set forth in a City Contract and any terms and conditions included in this RFP.
The City reserves the right to include in any contract document such terms and conditions, as
it deems necessary for the proper protection of the rights of the City. The City will not be
obligated to sign any contracts, agreements or other documents provided by the Contractor(s)
with their submittal.
1.2. OBJECTIVE
The primary objective of the Request for Proposals (RFP) is the selection and ranking of the
most qualified and experienced proposer in providing services.
1.3. ISSUING OFFICE
The contracting agency shall be the City of Dade City, located at 38020 Meridian Avenue,
Dade City, FL 33525.
1.4. REJECTION
The City reserves the right to accept or reject any or all proposals or to waive any informality,
existing in any proposal, or to accept the proposal which best serves the interest and intent of
this project from the most responsive and responsible proposer.
A. The City may reject bids if:
• The Proposer mistakes or conceals any material face in the bid, or if,
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Description: RPQ WINDOW/DOOR, GLASS, COMMERCIAL, REPAIR AND REPLACEMENT Department: Purchasing Buyer: Zulma Gasca

Palm Beach County

Bid Due: 10/16/2030

Description: RPQ WINDOW/DOOR, GLASS, COMMERCIAL, REPAIR AND REPLACEMENT Department: Procurement Buyer: Kristen Monnett

Palm Beach County

Bid Due: 10/07/2029

Bid Number Opening Date Title Prime category code pre-bid conference & addenda Status

Miami-Dade County Public Schools

Bid Due: 6/16/2026

Advertisement Detail Department of Transportation Agency Decisions ELEVATOR MAINTENANCE ADJUSTMENT, REPAIR, AND REPLACEMENT

State Government of Florida

Bid Due: 10/11/2080