SW District, Polk County, E 310th Road Over Brush Creek, Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU girder bridge.

Agency: Missouri Department of Transportation(MDOT)
State: Missouri
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238910 - Site Preparation Contractors
Posted Date: May 26, 2026
Due Date: Jun 22, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Status Bid Advertisement Post Date Revision Date Letting Date
NEW SW District, Polk County, E 310th Road Over Brush Creek, Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU
girder bridge.
5/26/26 6/22/26

Attachment Preview

INVITATION TO BID
E. 310TH ROAD OVER BRUSH CREEK
Sealed bids for the Proposal for the Construction of Polk County Bridge #00700081 will be received at: Polk
County Courthouse, 102 E. Broadway, Room 12, Bolivar, MO 65613, until 9:30 A.M. (Prevailing Local Time)
on the 22nd day of June 2026, at the office of the Polk County Courthouse, and at that time will be publicly
opened and read. All bids shall be submitted as a Hard Copy.
The proposed work includes:
Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU
girder bridge. A precast concrete box culvert, guardrail, riprap, and permanent erosion control will be
installed along with any other incidental work in accordance with the plans and specifications.
A digital copy of the plans and specifications may be purchased through the office of Great River
Engineering (GRE), at 417-886-7171 upon payment of $75.00, which is not refundable. All bidders must
purchase plans through Great River Engineering and be on the planholder list in order to bid the project.
This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required
to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and
requires adherence to a schedule of minimum wages as determined by the United States Department of
Labor. For work performed anywhere on this project, the contractor and the contractor’s subcontractors
shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract
are detailed in “Annual Wage Order 32”, that is attached to this bidding document. The applicable federal
wage rates for this contract are the effective Davis-Bacon federal wage rates posted the tenth day before
the bid opening date and can be found at: https://sam.gov/content/wage-determinations. These
supplemental bidding documents have important legal consequences. It shall be conclusively presumed
that they are in the bidder's possession, and they have been reviewed and used by the bidder in the
preparation of any bid submitted on this project.
The Polk County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, businesses owned and controlled by socially and economically
disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and
will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national
origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard
Specifications for Highway Construction, 2025, Third Edition Edition including all revisions. The contractor
questionnaire must be on file 7 days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works projects shall provide a 10-
Hour OSHA construction safety program, or similar program approved by the Department of Labor and
Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on
the construction project.
A certified cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The Polk County reserves the right to reject any or all bids.
The project will be awarded to the lowest, responsive, responsible bidder.
The DBE Goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
POLK COUNTY
BRO-R084(015)
INVITATION TO BID
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Whiteman AFB - FY27 Airfield Pavement Active Contract Opportunity Notice ID FA462526Q1062

DEPT OF DEFENSE

Bid Due: 8/26/2026

6th St. Bridge Widening - Burlington, KS 25-1225 StatusAccepting Bids Bid Date 8/13/26

Drexel Technologies

Bid Due: 8/13/2026

6th St. Bridge Widening - Burlington, KS 25-1225 StatusAccepting Bids Bid Date 8/13/26

Drexel Technologies

Bid Due: 8/13/2026

2025 Water System Improvements - Lenora, KS 21.164 StatusAccepting Bids Bid Date 8/13/26

Drexel Technologies

Bid Due: 8/13/2026