SW District, City of Branson, Streetscape Improvements W. 76 Country Blvd. Segment 1 & 2 - Addendum 1
| Agency: | Missouri Department of Transportation(MDOT) |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| Posted Date: | Aug 28, 2026 |
| Due Date: | Sep 14, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | SW District, City of Branson, Streetscape Improvements W. 76 Country Blvd. Segment 1 & 2 - Addendum 1 | 8/28/26 | 9/14/26 |
Attachment Preview
ADDENDUM 1
August 27, 2026
Page 1
CITY OF BRANSON, MISSOURI
PURCHASING DEPARTMENT
REQUEST FOR BID 2869-05A, 2869-05B, 2869-05C, 2869-05D
W 76 Country Blvd Streetscape – Segments 1 and 2
James Morris, Bid Coordinator
City of Branson, Purchasing Office
110 W. Maddux St., Suite 200
Branson, MO 65616
Date Issued: 8/27/2026
Buyer’s Email: jmorris@bransonmo.gov
Telephone: (417) 337-8553 Ext. 1407
DUE DATE: 9/14/2026 at 1:00 PM
Addendum No. 1
Vendors are directed to the documents attached following this Addendum Acknowledgement. Vendors
are solely responsible for reviewing all attached materials in their entirety and ensuring their bid
submission reflects any applicable changes contained therein.
ALL BIDDERS ARE REQUESTED TO SIGN THE ACKNOWLEDGMENT BELOW AND
INCLUDE WITH BIDS TO CONFIRM RECEIPT OF ADDENDUM #1
Signature
Acknowledged by Bidder
End of Addendum No. 1
ISSUED BY:
Addendum NO 1
Great River Engineering
2826 S. Ingram Mill Rd.
Springfield, Missouri 65804
(417) 886-7171
(417) 886-7591 --- FAX
8/27/2026
ATE OF MISSO
TODD
MICHAEL
CHANDLER
NUMBER
PE-2012000736
DATE:
August 27, 2026
FOR:
W 76 Country Boulevard Streetscape Improvements,
Contracts EN7622, SNS0032 &
W 76 Country Blvd Median Improvements
Contracts TAP-9901(886) and STP-0761(023)
GRE Project 4515
The attached revisions hereby supersede all data with which they may conflict as indicated on the Drawings,
Specifications and related documents issued in the original set. Each trade is responsible for changes in its
work caused by changes in the work of other trades. This addendum is a part of and shall be attached to the
original sets of plans and specifications for the work.
Notification: There have been no changes or addendums prior to this addendum.
CHANGES: To Contract EN7622 and SNS0032 Plans
1. Change the general utility trench key notes on Sheet U2 note B to reference 2” to 4” diameter conduits.
See snippet below:
Page 1 of 3
CHANGES: To Contracts TAP-9901(886) and STP-0761(023)
2. Change contract agreement to remove blanket retainage requirements.
1. Revise Contract Article 10. Performance, Labor and Materials Payment Bond to read as
follows:
“10. Payment Bond. The Contractor shall furnish a Payment Bond with surety approved
by the City and on the form approved by the City. The bond shall be in the total amount of
the contract conditioned upon the full payment of all labor and material suppliers. It is
further mutually agreed between the parties hereto that if, at any time after the execution
of this contract and the surety bond(s) hereto attached for its faithful payment of labor and
material suppliers, the City shall deem the surety or sureties upon such bond(s) to be
unsatisfactory, or if, for any reason, such bond(s) ceases to be adequate to cover the
performance of the work, the Contractor shall, at its expense, within five (5) days after the
receipt of notice from the City to do so, furnish an additional bond or bonds, in such form
and amount, and with such surety or sureties as shall be satisfactory to the City. In such
event no further payment to the Contractor shall be deemed to be due under this contract
until such new or additional security for the faithful payment of labor and material suppliers
shall be furnished in a manner and form satisfactory to the City. The corporate surety on
any payment bond must be licensed by the State of Missouri and if the required bond
exceeds $25,000.00 must be listed in United States Treasury Circular 570.”
2. Revise Contract Article 11. Payment Procedures, paragraph B to read as follows:
“Prior to completion, progress payments will be made in an amount equal to the value of
the work completed, less the aggregate of payments previously made and less such
amounts as Director of Public Works/Engineering shall determine, or City may withhold, in
accordance with the General Conditions.”
3. Delete contract Article 11. Payment Procedures, paragraphs C & D and revise E to C.
3. Delete Performance and Maintenance Bond and replace with the Performance Bond Attached.
4. Change General Conditions Section B. AWARD AND EXECUTION OF CONTRACT, section 3,
subparagraph 4 to read as follows;
“Subcontractors will be recognized and dealt with only as workmen and representatives of the
contractor. If approval is given for subletting work, the contractor shall perform, with his own
organization, work amounting to not less than thirty (30%) percent of the total contract cost. A
subcontractor may not subcontract any portion of his work. “
CLARIFICATIONS:
- Contractors shall contact the City of Branson Utility Department directly at hcoulter@bransonmo.gov
for questions relating to the existing water system and Cc James Morris at jmorris@bransonmo.gov .
Contractor shall verify location, size and functionality of the information shown.
- Prebid Meeting Comments/Minutes are attached and provided as reference for the Bidder.
Page 2 of 3
ATTACHMENTS:
1. Revised Construction Contracts for TAP and STP projects.
2. Revised Performance Bond for TAP and STP projects.
3. Prebid Meeting Minutes and Comments
There are no other clarifications or changes included with this Addendum.
Page 3 of 3
W 76 Country Blvd Streetscape – Segments 1 & 2
CONSTRUCTION CONTRACT
STP-0761(023)
THIS CONTRACT, made and entered into this ____ day of ____________, 20___, by and between
_______________________________________, hereinafter called “Contractor”, and the City of Branson,
Missouri, a municipal corporation, hereinafter called “City”.
WITNESSETH: That whereas, the Contractor has become the lowest responsive, responsible bidder as determined
by the City of Branson for furnishing the supervision, labor, tools, equipment, materials and supplies for the
following: W 76 Country Blvd Streetscape – STP – 0761(023) as outlined in plan specification documents.
The parties to this contract agree to the following:
1. Manner and Time for Completion. The Contractor agrees to furnish all supervision, labor, tools,
equipment, materials and supplies necessary to perform work, and to perform said work at Contractor’s own
expense in accordance with the contract documents and any applicable City ordinances and state and federal laws
within 609 calendar days from the date Contractor is ordered to proceed, which order shall be issued by the Director
of Public Works/Engineering within 60 days after the date of this contract. Contractor shall not proceed with the
work unless and until this contract has been signed by all parties, and a Notice to Proceed has been issued by the
City.
2. Prevailing Wages. It is agreed that all labor utilized in the construction of the aforementioned
improvements shall be paid a wage of no less than the “prevailing hourly rate of wages” for work of a similar
character in this locality, as established and amended at any time by the Department of Labor and Industrial
Relations of the State of Missouri.
3. Missouri Immigration Law Affidavit. Contractor acknowledges that Section 285.530 RSMo, prohibits
any business entity or employer from knowingly employing, hiring for employment, or continuing to employ an
unauthorized alien to perform work within the State of Missouri. Contractor therefore covenants that it is not
knowingly in violation of subsection 1 of Section 285.530, RSMo, and that it will not knowingly employ, hire for
employment, or continue to employ any unauthorized aliens to perform work as part of this construction contract,
and that its employees are lawfully eligible to work in the United States.
4. Anti-Discrimination Act Against Israel. Contractor agrees to provide a certification if requested by the
City of Branson, in accordance with Sec. 34.600 RSMo that they have not engaged in a boycott of: Goods or
services from the State of Israel; Companies doing business in, or with, Israel; Companies authorized by, licensed
by, or organized under, the laws of the State of Israel; or Persons or entities doing business in the State of Israel.
5. Required Safety Training.
A. Contractor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) construction
safety program for all employees who will be on-site as part of this contract for City improvements. The
construction safety program shall include a course in construction safety and health that is approved by OSHA or a
similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as
stringent as an approved OSHA program as required by Section 292.675, RSMo.
B. Contractor shall require its on-site employees to complete a construction safety program within sixty (60) days
after the date work as part of this contract for City improvements commences.
Construction Contract
CC 1 OF 10
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, City
Missouri Department of Transportation(MDOT)
Due by 9/14/2026
Follow ODF-B FY26 Outboard Engines Supply Active Contract Opportunity Notice ID W912DQ26QA073 Related
DEPT OF DEFENSE
KCATA Cummins Engine Parts Summary The KCATA is seeking qualified firms to provide
Kansas City Area Transportation Authority
Due by 9/23/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.