SW District, Barry County, Bridge Replacement
| Agency: | Missouri Department of Transportation(MDOT) |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 17, 2026 |
| Due Date: | Apr 9, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Status | Bid Advertisement | Post Date | Revision Date | Letting Date |
| NEW | SW District, Barry County, Bridge Replacement | 3/17/26 | 4/9/26 |
Attachment Preview
INVITATION TO BID
BARRY COUNTY BRIDGE REPAIR BUNDLE
Sealed bids for the Barry County Bridge Repair Bundle will be received at: Barry County Commission, 700
Main Street, Suite 2, Cassville, MO 65625, until 10:00 A.M. (prevailing local time) on the 9th day of April,
2026, at the office of the Barry County Courthouse, and at that time will be publicly opened and read. All
bids shall be submitted as a Hard Copy.
The proposed work includes:
This project includes repairs to six bridges throughout Barry County. Work generally includes placement of
concrete collars around existing abutments, formed and unformed substructure repairs, installation of
MoDOT Type 2 Rock Blanket, construction of retaining walls, clearing bridge areas of debris, curb repair,
and box culvert slab repair.
A digital copy of the plans and specifications may be purchased through the office of Great River
Engineering (GRE), at 417-886-7171 upon payment of $75.00, which is not refundable. All bidders must
purchase plans through Great River Engineering and be on the planholder list in order to bid the project.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing
hourly rates of wages of work of similar character in this locality as established by the Missouri Department
of Labor and Industrial Relations (State Wage Rate).
This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required
to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and
requires adherence to a schedule of minimum wages as determined by the United States Department of
Labor. For work performed anywhere on this project, the contractor and the contractor's subcontractors
shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract
are detailed in "Annual Wage Order 32", that is attached to this bidding document. These supplemental
bidding documents have important legal consequences. It shall be conclusively presumed that they are in
the bidder's possession, and they have been reviewed and used by the bidder in the preparation of any bid
submitted on this project.
The Barry County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract
entered into pursuant to this advertisement, businesses owned and controlled by socially and economically
disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and
will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national
origin in consideration for an award.
All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the current version of the
Missouri Standard Specifications for Highway Construction. The contractor questionnaire must be on file 7
days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works projects shall provide a
10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and
Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on
the construction project.
A certified cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal.
The Barry County Commission reserves the right to reject any or all bids.
The project will be awarded to the lowest, responsive, responsible bidder.
The DBE Goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
BARRY COUNTY COMMISSION
INVITATION TO BID
See Also
Follow F999--Bio Pond Restoration and Stewardship for John Cochran and Jefferson Barracks VA
VETERANS AFFAIRS, DEPARTMENT OF
Due by 10/21/2026
Green Pines Park Connector Path - Wildwood, MO TAP-5500(692) StatusAccepting Bids Bid Date
Drexel Technologies
Due by 10/14/2026
US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid
Drexel Technologies
Due by 9/30/2026
US-56 Corridor Management Project (2026) - Baldwin City, KS 16-1308 StatusAccepting Bids Bid
Drexel Technologies
Due by 9/30/2026