Surfside Beach Pier Wind Break Structure

Agency: Town of Surfside Beach
State: South Carolina
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
  • 541330 - Engineering Services
Posted Date: Apr 6, 2026
Due Date: May 5, 2026
Solicitation No: BID PW26-001
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: BID PW26-001
Bid Title: Surfside Beach Pier Wind Break Structure
Category: Public Works
Status: Open
Description:

The Town of Surfside Beach seeks qualified bidders to fabricate and install a treated wooden wind break structure on the Surfside Beach pier, subject to technical specifications in the bid package. Bids received will be publicly opened on Tuesday, May 5th, 2026 at 10:00 AM at the Surfside Beach Town Hall 210 Hwy 17 South.

Publication Date/Time:
4/6/2026 12:00 PM
Closing Date/Time:
5/5/2026 10:00 AM
Related Documents:

Attachment Preview

NOTICE
UPON EXECUTION THIS DOCUMENT, EXCEPTIONS,
SPECIAL TERMS AND CONDITIONS SHALL
CONSTITUTE A BINDING CONTRACT
PLEASE READ “INSTRUCTIONS
TO BIDDERS”, VERY THOROUGHLY.
TOWN OF SURFSIDE BEACH
INVITATION TO BID
Bid for Pier Wind Break Structure,
Surfside Beach, South Carolina for the Town of Surfside Beach per specifications, subject to conditions
and provisions set forth in the attached Bid Package, will be received at this office no later than Tuesday,
May 5th, 2026, at 10:00 a.m. The Packages will then be opened and publicly read. The services must be
furnished as described and specified in the package.
Inquiries and/or questions may be directed to Public Works Director John Adair at 843-913-6361 or via
email at jadair@surfsidebeach.org.
Questions pertaining to technical specifications should be addressed to:
N/A
PLEASE ADDRESS MAILED BIDS TO:
Town of Surfside Beach
210 Hwy 17 South
Surfside Beach, South Carolina 29575
Attn: Joseph Smith, Bid Coordinator
Also, please show the following BID/QUOTE Number in the lower left hand corner of the envelope.
Thank you.
BID NUMBER
PW #26-001
Signature______________
Title
BID: PW #26-001
TOWN OF SURFSIDE BEACH
Table of Contents
ENCLOSURES
INVITATION TO BID
INSTRUCTION TO BIDDERS
BID FORMS AND INSTRUCTIONS
CONTRACT FORM
GENERAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS
NO. OF PAGE S
1
7
9
5
1
PDF FILE
PAGE NO.
2
4-10___
11-19
20-24
25__
BID: PW #26-001
INSTRUCTIONS TO BIDDERS
1. DEFINED TERMS
1.1 Terms used in these INSTRUCTIONS TO BIDDERS are defined in the General Conditions and
the Supplementary Conditions of the Construction Contract and shall have the intent and
meaning assigned them therein. Terms defined in the General Conditions shall have the intent
and meaning assigned them in the Supplementary Conditions.
1.2 The term “Successful Bidder” means the lowest, qualified, responsible, responsive BIDDER to
whom OWNER (on the basis of OWNER’S evaluation as hereinafter provided) makes an award.
1.3 The term “Bidding Documents” means the Bidding Requirements, Contract Forms, Bid Forms,
and Provisions of the Contract, Specifications, Drawings, and Addenda issued by the OWNER
for the purpose of obtaining a bid on the Work.
2. BIDDING DOCUMENTS
2.1 Complete sets of Bidding Documents shall be used in preparing bids; OWNER does not assume
any responsibility for errors or misinterpretations resulting from use of incomplete sets of
Bidding Documents.
2.2 OWNER, in making copies of the Bidding Documents available on the above terms does so only
for the purpose of obtaining bids on the Work and does not confer a license or grant for any
other use.
3. QUALIFICATIONS OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, the Low Bidder and such other Bidders as
the OWNER may request must submit, within seven (7) days of Bid Opening, evidence which
may be required by the OWNER, such as, but not limited to, financial data and previous
experience. Each BID must contain evidence of the BIDDER’S qualifications to do business in
the state where the Project is located. Conditional or qualified BIDS will not be accepted.
3.2 By submission of a BID the BIDDER agrees, that if awarded a contract, to perform on the Site
and with his own organization, work equivalent to at least FORTY PERCENT (40%) of the total
dollar value of the Work to be performed in the Contract. If during the progress of the Work
hereunder, the CONTRACTOR requests an adjustment of such percentage and the OWNER
determines that it would be to its advantage, the percentage of the Work required to be performed
by the CONTRACTOR’S organization may be adjusted; PROVIDED prior written approval of
such adjustment is obtained from the OWNER.
BID: PW #26-001
3.3 Each BIDDER must furnish with his BID a list of items that he will perform with his own forces
and the estimated total cost of these items.
3.4 All BIDDERS must be properly licensed contractors in the State of South Carolina at the time
of submitting BIDS and must indicate their current contractor’s license number on the outside
of the sealed envelope containing their BID and on their BID.
4. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1 It is the responsibility of each BIDDER before submitting a BID, to (a) examine the Bidding
Documents thoroughly; (b) visit the site(s) to familiarize himself with local conditions that may
in any manner affect cost, progress or performance of the Work; (c) familiarize himself of
federal, state and local laws, ordinances, rules and regulations that may in any manner affect
cost, progress or performance of the Work; (d) study and carefully correlate BIDDER’S
observations with the Specifications, and (e) notify the OWNER of all conflicts, errors or
discrepancies.
4.2 Before submitting his BID each BIDDER may, at his own expense and assuming all risks, make
such additional investigations and tests as the BIDDER may deem necessary to determine his
BID for performance of the Work in accordance with the time, price and other terms and
conditions of the Contract Documents.
4.3 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders
on subsurface conditions, Underground Facilities and other physical conditions, and possible
changes in the Contract Documents due to differing conditions appear in Paragraphs 4.2 and 4.3
of the General Conditions.
4.4 The lands upon which the Work is to be performed, rights-of-way and easements for access
thereto and other lands designated for use by the CONTRACTOR in performing the Work are
identified in Section 01010 of the General Requirements of the Specifications and shown on the
Drawings.
4.5 The submission of a BID will constitute an incontrovertible representation by BIDDER that
BIDDER has complied with every requirement of this Article 4, and that the Contract
Documents are sufficient in scope and detail to indicate and convey understanding of all terms
and conditions for performance and furnishing of the Work.
5. ADDENDA AND INTERPRETATIONS
5.1 All questions about the meaning or intent of the Contract Documents shall be submitted to
OWNER in writing. Interpretations or clarifications considered necessary by OWNER in
response to such questions will be issued by Addenda mailed or delivered to all parties recorded
by OWNER as having received the Bidding Documents. Questions received less than three (3)
days prior to the date for opening the BIDS may not be answered. Only questions answered by
formal written Addenda will be binding. Oral and other interpretations or clarifications will be
without legal effect.
BID: PW #26-001
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project Name: Pee Dee Generator Agency/Owner: SLED Ad Publish Date: May 29, 2026

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/22/2026

Project Name: I-26 EB Rest Area Reconstruction, Charleston Co. Agency/Owner: Department of Transportation

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/23/2026

Project Name: Downtown Revitalization - Graham Amphitheater Agency/Owner: City of Union Ad Publish

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/30/2026

Project Name: Greenline-Spartanburg Improvement Project Phase 1 Agency/Owner: City of Greenville Ad Publish

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 7/07/2026