Sunset Hwy (US2) Bicycle Facilities/Shared Use Path - 2024073
| Agency: | City of Spokane |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Nov 22, 2025 |
| Due Date: | Nov 24, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Bid Date | 11/24/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 10,000 linear feet of HMA shared use path (12,000 square yards of 3-inch thick HMA and 4-inch thick CSTC), 2700 cubic yards of excavation and embankment, 200 linear feet of storm sewer, 4 drainage structures, 1 20-ft long contractor designed buried structure, 350 linear feet of absorption trench, 400 linear feet of gravity block wall (2.5-4.0 feet tall), 1 pedestrian hybrid beacon system, 100 linear feet of sidewalk, 400 linear feet of cement concrete curb, sundry utility adjustments, and other related miscellaneous items.
See Also
Bid Number: PSA-2026-26 Bid Title: RFQ Water & Wastewater SCADA System Upgrade Category:
City of Port Angeles
Due by 10/21/2026
Project: Sanitary Sewer Manhole 2831 Replacement Project Ref. #: 20260817 Department: Lake Stevens
Sammamish Plateau Water
Due by 9/29/2026
Project: BID - LWIT - Exterior Building Painting & Signs - Lake WA
State Government of Washington
Due by 9/17/2026
Follow Bldg. 1051 Replace Main Dry Valves Active Contract Opportunity Notice ID N0025326Q0013
DEPT OF DEFENSE
Due by 9/21/2026