Sunset Hills/St. Louis County Route: Rott Road/Robyn Road, Improvements to the route include design of curb and gutter and ADS sidewalk and crossings along one side of the roadway and appropriate guardrail through the extents of the project

Agency: Missouri Department of Transportation(MDOT)
State: Missouri
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Nov 26, 2025
Due Date: Dec 12, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date
NEW 11/26/25 STGB-4900(653) Sunset Hills/St. Louis County Route: Rott Road/Robyn Road, Improvements to the route include design of curb and gutter and ADS sidewalk and crossings along one side of the roadway and appropriate guardrail through the extents of the project Mike Knight 314-849-3400 Mknight@sunset-hills.com 12/12/25

Attachment Preview

3939 South Lindbergh Boulevard Sunset Hills, Missouri 63127
314.849.3400 E www.sunset-hills.com
11/26/2025
Dear Consultant:
The City of Sunset Hills is requesting the services of a consulting engineering firm to perform the described
professional services for the project included on the attached list. If your firm would like to be considered
for these consulting services, you may express your interest by responding to the appropriate office, which
is indicated on the attachments. Limit your letter of interest to no more than 5 pages. This letter should
include any information which might help us in the selection process, such as the persons or team you
would assign to each project, the backgrounds of those individuals, and other projects your company has
recently completed or are now active. It is required that your firm’s Statement of Qualification (RSMo
8.285 through 8.291) be submitted with your firm’s Letter of Interest, or be on file with City of Sunset
Hills. The statement of qualification is not included in the total page count limit.
DBE firms must be listed in the MRCC DBE Directory located on MoDOT’s website at www.modot.gov, in
order to be counted as participation towards an established DBE Goal. We encourage DBE firms to submit
letters of interest as prime consultants for any project they feel can be managed by their firm.
It is required that your firm be prequalified with MoDOT and listed in MoDOT’s Approved Consultant
Prequalification List, or your firm will be considered non-responsive.
We request all letters be received by 4:30 pm, 12/12/2025 at 3939 South Lindbergh Blvd. Sunset Hills MO,
63127
Sincerely,
Mike Knight
Director of Planning & Public Works
Department of Public Works
City of Sunset Hills
Attachment
City/County: Sunset Hills/St. Louis County Route: Rott Road/Robyn Road
Federal Aid No:
STGB-4900(653)
Location:
Rott Road/ Robyn Road
Proposed Improvement:
Improvements to the route include design of curb and
gutter and ADS sidewalk and crossings along one side of
the roadway and appropriate guardrail through the
extents of the project. The anticipated width of the
sidewalk is 8'. Replacement of guardrail to current
standards, updated striping and signing. Drainage
improvements and if necessary, water quality BMPs will
be implemented as well to offset the additional
impervious area. The milling of approximately 2" of the
existing surfaces and replacing it with approximately 2"
of an asphalt surface.
Length:
Approximate Construction Cost:
DBE Goal Determination:
Consultant Services Required:
Other Comments:
Contact:
Deadline:
.57 miles
$1,382,865.00
0%
Roadway
The engineering responsibilities may include but are not
limited to the following:
The preparation of Conceptual plans, Preliminary plans,
Contract plans and Right of Way Plans, preparing and
submitting necessary permits. Design services may
include, right of way plans, surveying, geotechnical
investigations, public involvement, environmental and
historic preservation services/permits, contract
documents, assisting with the bidding process,
construction support/construction inspection, utility
coordination/permits and traffic controls including the
preparation of PS&E and final documents.
Sidewalks
The engineering responsibilities may include but are not
limited to:
The preparation of Conceptual plans, Preliminary plans,
Contract plans, Right of Way Plans, preparing and
submitting necessary permits, contract documents,
assisting with the bidding process for ADA compliant
sidewalks and preparation of PS&E and final documents.
Construction Inspection
Construction Phase: work with contractor on behalf of
the City, assist with preconstruction conference, perform
periodic site inspection, prepare change orders, inspect
construction materials, check shop drawings submitted
by contractor, conduct construction test and inspection,
be present during critical construction operations, work
with City to do full time inspections and reporting and
participate in final inspection.
Name: Mike Knight
Address: 3939 S. Lindbergh Blvd.
Sunset Hills, MO 63127
Phone: 314-849-3400
Email :Mknight@sunset-hills.com
4:30 pm, (12/12/2025)
Submit: Letter of interest should not exceed Five (5) pages total. A page is defined as 8-1/2 by 11 inches and
printed on one side. Three (3) copies of the letter interest should be received at the address and by the time
specified.
Pursuant to the Brooks Act for Consultant Selection – the following criteria will be the basis for selection.
Experience and Technical Competence -
35 Max Points
Capacity and Capability -
30 Max Points
Past Record of Performance -
35 Max Points
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Duello Road Phase II Water Main Relocation Project - St. Charles County, MO

Drexel Technologies

Bid Due: 8/27/2026

Duello Road Phase II Water Main Relocation Project - St. Charles County, MO

Drexel Technologies

Bid Due: 8/27/2026

Duello Road Phase II Water Main Relocation Project - St. Charles County, MO

Drexel Technologies

Bid Due: 8/27/2026

Duello Road Phase II Water Main Relocation Project - St. Charles County, MO

Drexel Technologies

Bid Due: 8/27/2026