| Agency: | East Bay Municipal Utility District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 1, 2025 |
| Due Date: | Aug 13, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
|
[Sign In] Current Construction Bid Opportunities |
| Title: | Summit Pressure Zone South Pipeline Replacement Phase 2A |
| Specification Number: | 2193 |
| Bid Walk: |
Monday, July 21, 2025, 11:00 AM
The District will conduct a pre-bid jobsite inspection tour to familiarize prospective bidders with the project site and conditions. The inspection will be conducted on July 21, 2025 at 11:00 a.m. Bidders/bid walk attendees (Attendees) shall comply with applicable Alameda County health orders. Attendees shall assemble at Firestorm Memorial Garden (near 1 Hiller Drive, Oakland 94618). All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. For pre-bid jobsite inspection questions only, call Ben Townley at (510) 287-2147. |
| Project Engineer: | J. Mittal |
| Bid Opening Date: | Wednesday, August 13, 2025, 1:30 PM |
| Estimated Cost: | $3,000,000 to $3,500,000 |
| Description: |
Work includes:
• Furnish and install approximately 1,935 horizontal linear feet (LF) of 24-inch, 30 LF of 16-inch and 55 LF of 12-inch mortar lined and coated steel (ML&CS) pipe, all connection piping, appurtenances, and fittings. • Remove three trees within Caltrans right-of-way as approved by the Engineer. • Provide required traffic control measures. • Remove and dispose of abandoned pipelines for installation of new pipelines. • Provide final restoration of pavement and restore Firestorm Memorial Garden landscaping. • Perform related required work as shown on the Drawings and as specified. |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Y--GOGA 244458 & FOPO 186401 Construct Bike Path at West Bluff Trailhead
INTERIOR, DEPARTMENT OF THE
Follow USACE SPK DBB Construction - Natomas PP5, Sacramento, CA Active Contract Opportunity
Federal Agency
Follow Solicitation is Restricted to the Current Region 5 Zone 2 FERM BPA
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/10/2026
Follow 127EAW26Q0050 - Ash Creek Helispot Construction Active Contract Opportunity Notice ID 127EAW26Q0050
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/13/2026