STURGEON RESEARCH BOAT REPLACEMENT
Bid Solicitation: S-63500-00014941
|
|
Responses Due in 33 Days, 21 Hours, 59 Minutes
|
|
Header Information
|
|
Bid Number:
|
S-63500-00014941
|
Description:
|
STURGEON RESEARCH BOAT REPLACEMENT
|
Bid Opening Date:
|
10/21/2025 02:00:00 PM
|
|
Purchaser:
|
Jake Howard
|
Organization:
|
Oregon Department of Fish and Wildlife
|
|
Department:
|
635000 - ODFW
|
Location:
|
000 - ODFW
|
|
Fiscal Year:
|
27
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
09/17/2025 11:32:48 AM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
There will no Pre-Bid Conference for this ITB.
|
|
Bulletin Desc:
|
ODFW's White Sturgeon Program is replacing their work boat. ODFW is seeking to purchase one (1) Welded Aluminum Workboat with outboard engines, and trailer for monitoring of White Sturgeon in the Columbia River.
|
|
|
Ship-to Address:
|
See Attachments for Address Details
Managed by ODFW Contract Services
Salem, OR 97302
US
Email: odfw.contractsinbox@odfw.oregon.gov
Phone: (503) 947-6159
|
Bill-to Address:
|
See Attachments for Address Details
Managed by ODFW Contract Services
Salem, OR 97302
US
Email: odfw.contractsinbox@odfw.oregon.gov
Phone: (503) 947-6159
|
Print Format:
|
|
File Attachments:
|
Invitation to Bid
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
Discipline Type:
|
Supplies
|
Procurement Method:
|
Competitive Sealed Bid
|
|
Item # 1:
(
120
-
23
)
|
Hull 26ft. Deep V bottom Planing chine or equivalent Semi-rounded bow
equivalent for stability. Hull must have a semi-rounded bow to
increase work area with sides rising higher in the bow than stern.
Design should reduce side-to-side roll while drifting. Rib and side
stiffeners can be added if needed.
|
|
NIGP Code:
|
120-23
Boats, Over 21 Feet, Including Ferries
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
120
-
43
)
|
Boat Hydraulics - Powered with engine and pump sufficient to run pot hauler and gill net drum two control stations; one just forward of dive door on port side and one at forward console on starboard side Engine will have electric start and be mounted to facilitate oil changing and servicing (location not specified).
|
|
NIGP Code:
|
120-43
Hydraulic Systems, Marine
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
120
-
18
)
|
Gill net drum - Centered over back half of live well leaving access to front half of live well. Removable with no fasteners above deck (deck must be flush with no protrusions when drum is not installed) Dimensions (or near equivalent): 52-inch x 24-inch x 19-inch gear box drive
|
|
NIGP Code:
|
120-18
Boat Components (Not Otherwise Classified)
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
120
-
97
)
|
Davit and Pot Hauler - Fabricate, install and test heavy-duty custom cargo davit integrated with custom mounting bracket for a 12-inch Kolstrand hydraulic pot hauler or equivalent (supplied by builder) centered 37-inch above the deck. Davit mounted using deep socket and side hull brace mounted as flush as possible to the gunwale. Swivel davit fabricated with sturdy locking mechanism designed into it. Davit rises 64-inch above deck
with a 58-inch arm containing three attachment points for customer supplied snatch block Removable bow horns with three live-rollers
|
|
NIGP Code:
|
120-97
Winches and Lifts, Boat, Including Windlasses
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
120
-
39
)
|
Livewell - Self-filling and self-bailing with a 3-inch fill/drain plug. Livewell will be located inside the deck, centered and forward of the cabin. Lid will
lay flush with deck but will be larger resulting in a 3-inch overlap onto deck. Lid will consist of two halves with no hinges, and recessed handles.
|
|
NIGP Code:
|
120-39
Fish Tanks, Holding and Transport
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
OREGON_OREGON_AWS_PROD_BUYSPEED_2_bso
|
|
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
Follow Pneumatic Kairison Maintenance and Repair Services Active Contract Opportunity Notice ID 36C26026Q0676
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/04/2026
Bid Solicitation # S-KE0010-00016990 Bid Solicitation # S-KE0010-00016990 Organization Name City of Eugene
State Government of Oregon
Bid Due: 6/16/2026
Solicitation Name: QBS RFP Wastewater Treatment Engineering Services Buyer: Jin Huang Solicitation #:
City of Portland
Bid Due: 6/04/2026
Follow J063, Panic and Intrusion Alarm Replacement and Monitoring, Various Clinics - Portland
Federal Agency
Bid Due: 9/26/2026