STURGEON RESEARCH BOAT REPLACEMENT

Agency: State Government of Oregon
State: Oregon
Type of Government: State & Local
NAICS Category:
  • 336611 - Ship Building and Repairing
  • 336612 - Boat Building
Posted Date: Sep 17, 2025
Due Date: Oct 21, 2025
Solicitation No: S-63500-00014941
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Bid Solicitation: S-63500-00014941
Responses Due in 33 Days, 21 Hours, 59 Minutes
Header Information
Bid Number:
S-63500-00014941
Description:
STURGEON RESEARCH BOAT REPLACEMENT
Bid Opening Date:
10/21/2025 02:00:00 PM
Purchaser:
Jake Howard
Organization:
Oregon Department of Fish and Wildlife
Department:
635000 - ODFW
Location:
000 - ODFW
Fiscal Year:
27
Allow Electronic Quote:
Yes

Alternate Id:

Required Date:
Available Date
:
09/17/2025 11:32:48 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
There will no Pre-Bid Conference for this ITB.
Bulletin Desc:
ODFW's White Sturgeon Program is replacing their work boat. ODFW is seeking to purchase one (1) Welded Aluminum Workboat with outboard engines, and trailer for monitoring of White Sturgeon in the Columbia River.
Ship-to Address:
See Attachments for Address Details
Managed by ODFW Contract Services
Salem, OR 97302
US
Email: odfw.contractsinbox@odfw.oregon.gov
Phone: (503) 947-6159
Bill-to Address:
See Attachments for Address Details
Managed by ODFW Contract Services
Salem, OR 97302
US
Email: odfw.contractsinbox@odfw.oregon.gov
Phone: (503) 947-6159
Print Format:

File Attachments:
Invitation to Bid

Form Attachments:
Required Quote Attachments

Discipline Type:

Supplies

Procurement Method:

Competitive Sealed Bid
Item Information
1-5 of 16

1
2
3
4

Item # 1:

(

120

-
23

)



Hull 26ft. Deep V bottom Planing chine or equivalent Semi-rounded bow
equivalent for stability. Hull must have a semi-rounded bow to
increase work area with sides rising higher in the bow than stern.
Design should reduce side-to-side roll while drifting. Rib and side
stiffeners can be added if needed.

NIGP Code:
120-23
Boats, Over 21 Feet, Including Ferries

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 2:

(

120

-
43

)



Boat Hydraulics - Powered with engine and pump sufficient to run pot hauler and gill net drum two control stations; one just forward of dive door on port side and one at forward console on starboard side Engine will have electric start and be mounted to facilitate oil changing and servicing (location not specified).

NIGP Code:
120-43
Hydraulic Systems, Marine

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 3:

(

120

-
18

)



Gill net drum - Centered over back half of live well leaving access to front half of live well. Removable with no fasteners above deck (deck must be flush with no protrusions when drum is not installed) Dimensions (or near equivalent): 52-inch x 24-inch x 19-inch gear box drive

NIGP Code:
120-18
Boat Components (Not Otherwise Classified)

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 4:

(

120

-
97

)



Davit and Pot Hauler - Fabricate, install and test heavy-duty custom cargo davit integrated with custom mounting bracket for a 12-inch Kolstrand hydraulic pot hauler or equivalent (supplied by builder) centered 37-inch above the deck. Davit mounted using deep socket and side hull brace mounted as flush as possible to the gunwale. Swivel davit fabricated with sturdy locking mechanism designed into it. Davit rises 64-inch above deck
with a 58-inch arm containing three attachment points for customer supplied snatch block Removable bow horns with three live-rollers

NIGP Code:
120-97
Winches and Lifts, Boat, Including Windlasses

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:



Item # 5:

(

120

-
39

)



Livewell - Self-filling and self-bailing with a 3-inch fill/drain plug. Livewell will be located inside the deck, centered and forward of the cabin. Lid will
lay flush with deck but will be larger resulting in a 3-inch overlap onto deck. Lid will consist of two halves with no hinges, and recessed handles.

NIGP Code:
120-39
Fish Tanks, Holding and Transport

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:


1-5 of 16

1
2
3
4


OREGON_OREGON_AWS_PROD_BUYSPEED_2_bso
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Pneumatic Kairison Maintenance and Repair Services Active Contract Opportunity Notice ID 36C26026Q0676

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/04/2026

Bid Solicitation # S-KE0010-00016990 Bid Solicitation # S-KE0010-00016990 Organization Name City of Eugene

State Government of Oregon

Bid Due: 6/16/2026

Solicitation Name: QBS RFP Wastewater Treatment Engineering Services Buyer: Jin Huang Solicitation #:

City of Portland

Bid Due: 6/04/2026

Follow J063, Panic and Intrusion Alarm Replacement and Monitoring, Various Clinics - Portland

Federal Agency

Bid Due: 9/26/2026