| Agency: | State Government of Florida |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 27, 2026 |
| Due Date: | Jun 27, 2026 |
| Solicitation No: | ITN-16096 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Code | Description |
| 40151500 | Pumps |
| 72101510 | Plumbing system maintenance or repair |
| 72121506 | Power plant construction service |
| 72151100 | Plumbing construction services |
| 72154110 | Fin fan cooling tower maintenance and repair service |
| 73161519 | Pumps or compressors manufacture services |
| 83101510 | Chilled water |
This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements.
The construction site is located at 397 Cypress Drive – Lake Buena Vista, FL 32830.
SCOPE OVERVIEW:
A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls;
B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls;
C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project;
D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls;
E. All electrical systems supporting the above items #1-4 as well as lighting at new cooling tower and pump area and lightning protection at new cooling tower and pump area;
F. New make-up water and overflow drain systems at new cooling tower;
G. New fire protection system for new cooling tower. Fire protection system shall be a separate, alarmed branch from the existing dry valve system;
H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed;
I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline;
J. Waterproofing of new cooling tower basin
| Description | Date/Time |
| MFMP Flyer | May 28, 2026, 6:44:02 AM |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Replace Air Cooled Chiller B559, 759 & 1368 Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 8/05/2026
Title JSO- FM- CEILING FAN REPLACEMENT (91915) Solicitation Type ITQ Status Active Buyer
City of Jacksonville
Bid Due: 7/28/2026
Description: WALK- IN FREEZER CONDENSER AND EVAPORATOR REPLACEMENT Department: Purchasing Buyer: Jordan Andrews
Palm Beach County
Bid Due: 5/01/2030
Description: Main County Courthouse - Air Handling Unit #1 Replacement Department: Facilities Dev
Palm Beach County
Bid Due: 6/05/2029