Storm Drainage System Rehabilitation and Replacement Project at Alester Avenue and Various Locations
| Agency: | City of Palo Alto |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 10, 2026 |
| Due Date: | Apr 2, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Storm Drainage System Rehabilitation and Replacement Project at Alester Avenue and Various Locations
Addenda: 0
Release Date: 3/10/2026
Due Date: 4/2/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The Storm Drainage System Replacement and Rehabilitation Project (SD-25000) has 2 project locations. The first is on Alester Avenue from Hamilton Avenue to Dana Avenue and the second is on Lambert Avenue and Birch Street. Based on the history of flooding in the area, this project proposes to upsize of the existing 12-inch line to 36-inch pipe for additional storage capacity. Pipe replacement in the streets may require additional work such as striping, sidewalk, curb and gutter, and curb ramp due to the location of the existing storm drain pipes. Due to the upsizing of the pipes, the connected catch basins will have to be removed and replaced.
Background
The Storm Drainage System Replacement and Rehabilitation Project proposes on 2 locations. The first location on Alester proposes to upsize 283 linear feet of 12-inch reinforced concrete (RCP) pipe to 36-inch high density polyethylene (HDPE) pipe on Alester Avenue. The pipe would need to a 36-inch HDPE stub coming off of a junction box at Hamilton Avenue and Alester Avenue where a different contractor on another project. The catch basins, laterals, and ADA ramps will need to be replaced as a result of this upsizing. One of the main challenges is the location since the project is located next to the elementary school, the Contractor would have to adhere to the bell schedules if work is scheduled for the school year or work can done during summer when school is not in session. The second location on Lambert and Birch proposes to replace the catch basin and laterals, and install a new manhole structure in the street.
Timeline
See Also
Follow DHS HSI Schwartz 2nd Floor Carpet Replacement Active Contract Opportunity Notice ID
GENERAL SERVICES ADMINISTRATION
Due by 12/04/2026
Painting Job Order Contracts (JOC 2718 and 2719) - Class C33 License The
County of San Mateo
Due by 12/10/2026
Follow GAOA Facilities, Barracks Inyo NF Active Contract Opportunity Notice ID 1240BH26Q0078 Related
AGRICULTURE, DEPARTMENT OF
Due by 11/18/2026
Follow USACE Los Angeles District (SPL)OTA Industry Day, Long Beach, CA Active Contract
DEPT OF DEFENSE
Due by 11/20/2026