STORM DRAINAGE IMPROVEMENTS AT VARIOUS LOCATIONS-PHASE E AND PAVING IMPROVEMENTS
| Agency: | City of Dallas |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 12, 2025 |
| Due Date: | Jun 20, 2025 |
| Solicitation No: | CIZ-DWU-24 571 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: This project consists of approximately ten (10) different project locations in the City of Dallas. The locations include eight (8) storm drainage improvement projects and two (2) pavement reconstruction locations. Four (4) of the storm drainage projects involve water and/or wastewater main replacement. The storm drainage improvement projects include installation of mains of varying diameters ranging from an 18-inch to 72-inch reinforced concrete pipe and 7-foot by 5-foot reinforced box culvert. Water main replacement includes installation of 6-inch to 8-inch diameter polyvinyl chloride pipes. Wastewater main replacement includes installation of 8-inch to 15-inch diameter polyvinyl chloride pipes. Detailed project location and information can be found in the contract specifications. Plans and Specifications for this project will be uploaded no later than Friday, April 18, 2025.
Project Manager: Shazia Ahmed, Senior Engineer
See Also
STATE LET CONSTRUCTION CONTRACT, LUBBOCK CO, REHABILITATE EXISTING ROADWAY Follow Solicitation Solicitation ID:
State Government of Texas
Due by 12/02/2026
STATE LET CONSTRUCTION CONTRACT, ANDREWS CO, SAFETY LIGHTING AT INTERSECTION, ADD LEFT TURN
State Government of Texas
Due by 12/01/2026
STATE LET CONSTRUCTION CONTRACT, DE WITT CO, HAZARD ELIMINATION & SAFETY Follow Solicitation
State Government of Texas
Due by 12/02/2026
STATE LET CONSTRUCTION CONTRACT, GALVESTON CO, INSTALL NOISE BARRIER Follow Solicitation Solicitation ID:
State Government of Texas
Due by 12/02/2026