2025 Storm Drain Improvements Project

Agency: City of San Carlos
State: California
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Feb 10, 2026
Due Date: Mar 3, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Department: Public Works
Category: Call for Bids
Project Number: C9531
Start Date: 02/10/2026
Close Date: 03/03/2026 10:00 AM
Question Cut-Off Date: 02/24/2026

CITY OF SAN CARLOS
SAN MATEO COUNTY, CALIFORNIA
NOTICE INVITING SEALED PROPOSALS

NOTICE IS HEREBY GIVEN that sealed proposals or bids for the 2025 Storm Drain Improvement Project Clifton Avenue, Kenton Avenue, Manzanita Avenue, and Shoreway Road, City Project No. C9531 shall be publicly opened, examined and announced on Tuesday, March 3, 2026, at 10:00 a.m. at the San Carlos City Clerk’s Office at City Hall - 600 Elm Street, San Carlos, CA 94070. Sealed bid proposals shall be received in-hand by the City Clerk before that bid opening date and time. No Pre-Bid meeting has been scheduled for this project.

A Class A, Contractor’s License is required for this work.  Work will be done and payments will be made in accordance with provisions more particularly described in the plans and specifications.

The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention and control, shoring, pipe replacement, pipe installation, manhole installation, catch basin installation, catch basin replacement, asphalt repair, concrete repair, striping removal & replacement, and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer.

Bids are required for the entire work described herein in accordance with the instructions to bidders. The Engineer’s Estimate is between $900,000 and $1,100,000.

Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described in the specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same does not, within fifteen days after written notice that the contract has been awarded to him/her (1) enter into a contract with the City and (2) furnish Performance and Payment Bonds as described in the specifications.

The City Council reserves the privilege of rejecting any and all proposals or to waive any irregularities or informalities in any proposals or in the bidding.  No bidder may withdraw his/her proposal for a period of ninety (90) calendar days after the date set for opening of proposals.

As a “Public Works” project and pursuant to Section 1773 of the Labor Code, the general prevailing wage rates for San Mateo County shall apply to this contract, as determined by the Director of the California Department of Industrial Relations.

Plans and specifications, forms of proposals, bonds and contracts may be inspected or obtained from ARC Document Solutions at 829 Cherry Lane, San Carlos, CA 94070, (650) 631-2310; email at sancarlos@e-arc.com; or visit the City of San Carlos Website at www.cityofsancarlos.org. Bidders must register with ARC Document Solutions to obtain further information.

Bidders are directed to the Instructions for Bidders for additional contract requirements.

Crystal Mui, City Clerk

Notice to Bidders

Attachment Preview

CITY OF SAN CARLOS
SAN MATEO COUNTY, CALIFORNIA
NOTICE INVITING SEALED PROPOSALS
NOTICE IS HEREBY GIVEN that sealed proposals or bids for the 2025 Storm Drain Improvement Project
Clifton Avenue, Kenton Avenue, Manzanita Avenue, and Shoreway Road, City Project No. C9531 shall be
publicly opened, examined and announced on Tuesday, March 3, 2026, at 10:00 a.m. at the San Carlos
City Clerk’s Office at City Hall - 600 Elm Street, San Carlos, CA 94070. Sealed bid proposals shall be
received in-hand by the City Clerk before that bid opening date and time. No Pre-Bid meeting has been
scheduled for this project.
A Class A, Contractor’s License is required for this work. Work will be done and payments will be made in
accordance with provisions more particularly described in the plans and specifications.
The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention
and control, shoring, pipe replacement, pipe installation, manhole installation, catch basin installation, catch
basin replacement, asphalt repair, concrete repair, striping removal & replacement, and all other work as
shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer.
Bids are required for the entire work described herein in accordance with the instructions to bidders. The
Engineer’s Estimate is between $900,000 and $1,100,000.
Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described
in the specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same
does not, within fifteen days after written notice that the contract has been awarded to him/her (1) enter into
a contract with the City and (2) furnish Performance and Payment Bonds as described in the specifications.
The City Council reserves the privilege of rejecting any and all proposals or to waive any irregularities or
informalities in any proposals or in the bidding. No bidder may withdraw his/her proposal for a period of
ninety (90) calendar days after the date set for opening of proposals.
As a “Public Works” project and pursuant to Section 1773 of the Labor Code, the general prevailing wage
rates for San Mateo County shall apply to this contract, as determined by the Director of the California
Department of Industrial Relations.
Plans and specifications, forms of proposals, bonds and contracts may be inspected or obtained from ARC
Document Solutions at 829 Cherry Lane, San Carlos, CA 94070, (650) 631-2310; email at sancarlos@e-
arc.com; or visit the City of San Carlos Website at www.cityofsancarlos.org. Bidders must register with ARC
Document Solutions to obtain further information.
Bidders are directed to the Instructions for Bidders for additional contract requirements.
Published:
Crystal Mui, City Clerk
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

General Information Due Date: Thursday, July 9, 2026 Opening Time: 2:00 PM Published

City of Stockton

Bid Due: 7/09/2026

7972R1 - 7972R1 Western Trunk Line Project - Phase 1 Status Stage Open

City of Los Angeles

Bid Due: 7/30/2026

Project ID: 2021-RFP - Roads-076 Title: Request for Proposals (RFP) for the Shark

Santa Cruz County

Bid Due: 7/22/2026

Bid Title: Randolph Street and County Line Road Traffic Signal and Intersection Improvements

City of Delano

Bid Due: 7/09/2026