Stone Street Reconstruction Project

Agency: City of Brewer
State: Maine
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Mar 6, 2026
Due Date: Mar 25, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: Stone Street Reconstruction Project
Category: RFPs
Status: Open
Description:

Bids are requested for a storm drain replacement and resurfacing project on Stone Street in the City of Brewer.

The limits of this project are on Stone Street from South Main Street to Elm Street. A failing section of vitrified clay lines will be replaced by 12” HDPE MaineDOT Option III dual wall pipe with a smooth interior. All existing structures will need to be connected into this new storm drain line. A doghouse manhole structure will be installed to make the connection between the new line and the existing concrete storm drain.

After the storm drain replacement is complete, the remaining portions of this section of roadway will be milled and overlaid and the sidewalk will be reconstructed. All new concrete curbing will be installed as part of the reconstruction. Two different curb molds will be utilized, in various locations along the roadway, see plans for exact locations.

Interested bidders may obtain bid information and specifications for the project by contacting the Brewer Engineering Department at (207) 989-8430.

For consideration, the bid form provided by the Engineering Department must be sealed in an envelope, distinctly marked, “2026 Stone Street Reconstruction Project” and must be received at the Office of Jeremy Caron, Brewer Engineering Dept., 221 Green Point Road, Brewer, ME

Bid Deadline: March 25, 2026 @ 10:00am. Any bids received after the date and time specified will not be allowed.

All bid questions must be received by “three days prior to bid”, all questions received after that time will not be answered. Prospective contractors should note that this project must be completed before August 8, 2026.

The City of Brewer reserves the right to accept or reject any or all proposals, to waive informalities or minor irregularities, and to accept the proposal deemed to be in the best interest of the City.

Publication Date/Time:
3/2/2026 12:00 AM
Closing Date/Time:
3/25/2026 10:00 AM
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

RFSB No. 226041 - Hatch Hill Daily Cover Soil and Gravel | Invitation

City of Agusta

Bid Due: 6/09/2026

Follow Van Buren LPOE Asphalt Removal and Replacement, Phase II Active Contract Opportunity

GENERAL SERVICES ADMINISTRATION

RFSB No. 226040 - Augusta Civic Center North Wing Entrance Doors | Invitation

City of Agusta

Bid Due: 6/25/2026

Bid #26097 Back Cove Stairs Reconstruction Project Mackworth Street and Chenery Street at

City of Portland

Bid Due: 6/11/2026