Stevens Ranch Water Main & ASR Pipeline Cathodic Replacement Project

Agency: San Antonio Water System
State: Federal
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: May 16, 2025
Due Date: Jan 1, 2026
Solicitation No: SM
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Stevens Ranch Water Main & ASR Pipeline Cathodic Replacement Project

Stevens Ranch Water Main Project

About the Project

This project will be comprised of two parts, with plan sheets being separated into two volumes. The Stevens Ranch Water Main Project will be volume I of II. This project will install approximately 16,600 linear feet of 16 to 24-inch water main from the intersection of Stevens Circle and Stevens Pkwy to Talley Road. The Stevens Ranch Water Main Project is necessary to improve the reliability of SAWS’ system and to provide service to the proposed Stevens Ranch Development.

When Will Work Occur?

Construction will begin in the 1 st quarter of 2026 with different starting and ending dates per segment that will be updated as construction proceeds. The total construction duration of the project is approximately 27-months with an estimated construction cost of approximately $17 million.

What to Expect

  • Open cut installation of approximately 16,000 linear feet of 16 to 24-inch diameter ductile iron water main at various depths up to 15 feet.
  • Trenchless installation of approximately 600 linear feet of 24-inch diameter ductile iron water main within a 42-inch steel casing at various depths up to 10 feet.
  • Installation and tie-ins/shutdowns will require coordination with the landowners and customers in the project area.

ASR Pipeline Cathodic Replacement Project

About the Project

The ASR Pipeline Cathodic Replacement Project will be volume II of the two-part project. The Aquifer Storage and Recovery (ASR) pipeline supplies water to SAWS customers along the eastern half of the city. It delivers water from H2Oaks to the Artesia, Seale, and Randolph pump stations. The pipeline also has the ability to send water back to H2Oaks for recharge into the ASR system. This project consists of replacing the cathodic protection system that protects ASR pipeline Segments 4, 5, and 6 – 47,116 linear feet of 60-inch, 25,163 linear feet of 42-inch, and 4,460 linear feet of 24-inch steel pipelines with an impressed current cathodic protection system. The improvements implemented under this project will protect the pipeline against corrosion and enhance the longevity of this pipeline.

When Will Work Occur?

Construction will begin in the 1 st quarter of 2026 with different starting and ending dates per segment that will be updated as construction proceeds. The total construction duration of the project is approximately 27-months with an estimated construction cost of approximately $17 million.

What to Expect

  • Installation of three new cathodic protection rectifier stations.
  • Installation of an AC mitigation system along a portion of ASR Pipeline Segment 5.
  • Three deep well 10-inch diameter anode beds with depths up to 190 feet.
  • Increased vehicular traffic, dust, and noise is anticipated in the vicinity during construction activities.
  • Construction activities will be scheduled to minimize service disruptions to customers.

For more information:

Stephen Muñiz

Contract Administrator

San Antonio Water System

Stephen.Muniz@saws.org

210-233-2950

Notify Me


Receive updates sent straight to your inbox.
Subscribe
Downloads

Contractor Outreach Fact Sheet


May. 16, 2025



Questions? Please contact

Stephen Muniz

at 210-233-2950
|

Receive Email Updates
|

Registration Agreement

Attachment Preview

Capital Improvement Project Summary:
Stevens Ranch Water Main Project
About the Project
This project will be comprised of two parts, with plan sheets being separated into two volumes. The Stevens
Ranch Water Main Project will be volume I of II. This project will install approximately 16,600 linear feet of 16
to 24-inch water main from the intersection of Stevens Circle and Stevens Pkwy to Talley Road. The Stevens
Ranch Water Main Project is necessary to improve the reliability of SAWS’ system and to provide service to the
proposed Stevens Ranch Development.
When Will Work Occur?
Construction will begin in the 1st quarter of 2026 with different starting and ending dates per segment
that will be updated as construction proceeds. The total construction duration of the project is
approximately 27-months with an estimated construction cost of approximately $17 million.
What to Expect
Open cut installation of approximately
16,000 linear feet of 16 to 24-inch
diameter ductile iron water main at various
depths up to 15 feet.
Trenchless installation of approximately
600 linear feet of 24-inch diameter ductile
iron water main within a 42-inch steel
casing at various depths up to 10 feet.
Installation and tie-ins/shutdowns will require
coordination with the landowners and
customers in the project area.
For more information:
Stephen Muñiz
Contract Administrator
San Antonio Water System
210-233-2950
2800 U.S. Hwy. 281 North
San Antonio, TX 78212
210-704-SAWS (7297) saws.org
Capital Improvement Project Summary:
ASR Pipeline Cathodic Replacement Project
About the Project
The ASR Pipeline Cathodic Replacement Project will be volume II of the two-part project. The Aquifer Storage
and Recovery (ASR) pipeline supplies water to SAWS customers along the eastern half of the city. It delivers
water from H2Oaks to the Artesia, Seale, and Randolph pump stations. The pipeline also has the ability to send
water back to H2Oaks for recharge into the ASR system. This project consists of replacing the cathodic protection
system that protects ASR pipeline Segments 4, 5, and 6 – 47,116 linear feet of 60-inch, 25,163 linear feet of 42-
inch, and 4,460 linear feet of 24-inch steel pipelines with an impressed current cathodic protection system. The
improvements implemented under this project will protect the pipeline against corrosion and enhance the
longevity of this pipeline.
When Will Work Occur?
Construction will begin in the 1st quarter of 2026 with
different starting and ending dates per segment that
will be updated as construction proceeds. The total
construction duration of the project is approximately
27-months with an estimated construction cost of
approximately $17 million.
What to Expect
Installation of three new cathodic protection
rectifier stations.
Installation of an AC mitigation system along
a portion of ASR Pipeline Segment 5.
Three deep well 10-inch diameter anode
beds with depths up to 190 feet.
Increased vehicular traffic, dust, and noise is
anticipated in the vicinity during construction
activities.
Construction activities will be scheduled to
minimize service disruptions to customers.
For more information:
Stephen Muñiz
Contract Administrator
San Antonio Water System
210-233-2950
2800 U.S. Hwy. 281 North
San Antonio, TX 78212
210-704-SAWS (7297)
saws.org
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow Bradbury Dam Outlet Valve Replacement Active Contract Opportunity Notice ID 140R2026R0018 Related

INTERIOR, DEPARTMENT OF THE

Due by 9/17/2026

Historic Schoolhouse Renovation Gautier, September 17, 2026 11:00 am

Goodwyn Mills Cawood(GMC)

Due by 9/17/2026

Follow OA?Donnell Dam Stabilization and Erosion Control Active Contract Opportunity Notice ID 140L6426R0001

INTERIOR, DEPARTMENT OF THE

Due by 10/02/2026

Follow Z--GRSM ROAD STRIPING Active Contract Opportunity Notice ID 140P5326R0022 Related Notice Department/Ind.

INTERIOR, DEPARTMENT OF THE

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.