Steven M. Clouse Water Recycling Center (SMCWRC) Rehabilitation Ph 1: 90%
| Agency: | San Antonio Water System |
|---|---|
| State: | Federal |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 9, 2025 |
| Due Date: | May 21, 2025 |
| Solicitation No: | YR |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
23-6511 Steven M. Clouse Water Recycling Center (SMCWRC) Rehabilitation Ph 1: 90%
Contractor Outreach Meeting and Site Visit
May 9, 2025 at 8:30 am (CDT)
SMCWRC
Building 16 - Cafeteria
3495 Valley Road
San Antonio, Texas 78221
I. OUTREACH MEETING AND SITE VISIT
Please join us for an information meeting and site visit to discuss the 23-6511 SMCWRC Rehabilitation Ph 1: 90% Contractor Outreach Meeting.
This project will be procured through the Request for Competitive Sealed Proposal (RFCSP) alternative construction delivery method and is tentatively scheduled to be advertised First Quarter 2026.
This will be an in-person meeting. Sign-in will begin at 8:00 am (CDT), with the formal presentation starting at 8:30 am (CDT) at the SMCWRC Cafeteria (Building 16). The presentation will provide important information about the project. After the meeting, we will proceed to the walk through of the site. To obtain additional information about the project, ask questions, or provide comment, contact Yvonne Rodriguez, Contract Administrator, at 210-233-3105 or via email at yvonne.rodriguez@saws.org .
This outreach meeting and site visit is primarily for prime contractors or key subcontractors only. Refer to the estimated scope in Section II.6. below.
Please complete the attached RSVP form and provide to Yvonne Rodriguez, Contract Administrator via email to yvonne.rodriguez@saws.org by the RSVP deadline. Attendees shall RSVP no later than May 1, 2025 by 10:00 AM (CDT). There is a limit of two (2) team members per firm.
Please submit questions and/or comments by May 14, 2025, at 4:00 PM (CDT). Answers to the questions will be posted to the web site by May 21, 2025, at 4:00 PM (CDT).
Please note this meeting and site visit is informational only. All dates are estimates and subject to change at any time without notice, including cancellation of the project.
II. PROJECT ESTIMATED INFORMATION
- The SMCWRC is the largest of the three (3) wastewater treatment plants San Antonio Water System (SAWS) owns and operates, and is located at 3495 Valley Rd, San Antonio, TX 78221. The plant has been in operation since 1987.
- Estimated construction budget is $50,000,000.00
- Estimated advertisement in 1st quarter of 2026
- Estimated Construction start in Mid 2026
- This project is the first phase of the 2020 Wastewater Facilities Master Plan to rehabilitate or replace aging equipment and infrastructure at SMCWRC. Phase 1 of the planned improvements will address critical rehabilitation needs at secondary treatment, tertiary filtration, and disinfection process areas.
- The scope of this project includes:
- Replacement of sludge collection mechanisms in Stage 1 settling tanks
- Replacement of Stage 2 return activated sludge (RAS) screw pump assemblies
- Replacement of tertiary filter cloth media units and fiberglass filter frames
- Concrete structure repairs and protective coatings within focus areas
- Replacement of sluice gates, scum skimmers, piping, pumps, and associated equipment in the disinfection area
- Replacement of existing digestion boiler, boiler canopy decking, and associated improvements
- Demolition of abandoned fuel storage tank
- Electrical and Supervisory Control and Data Acquisition (SCADA) improvements to secondary treatment, tertiary filtration, disinfection, and boiler process areas
- All associated site civil, mechanical, structural, electrical, and I&C work for this rehabilitation
III. ADDITIONAL INFORMATION
-
If your firm is interested in submitting a proposal for this project, it is important to register as a vendor on the SAWS Vendor Registration and Notification System. Once registered and the project is advertised, you will be able to view and download the plans and specifications at no charge.
Link to register:
https://apps.saws.org/business_center/vendor/
-
Contractors are also encouraged to attend the upcoming RFCSP Proposal Preparation Training offered by SAWS on April 14, 2025 at 2:00 PM. Information about this training can be found at the following link:
ttps://apps.saws.org/business_center/contractsol/index.cfm
|
Other
Apr. 9, 2025 |
|
Questions? Please contact
Yvonne Rodriguez
at 210-233-3150
|
Receive Email Updates
|
Registration Agreement
See Also
Follow Z--GRSM ROAD STRIPING Active Contract Opportunity Notice ID 140P5326R0022 Related Notice Department/Ind.
INTERIOR, DEPARTMENT OF THE
Follow Z--REPLACE PHYSICAL SECURITY ALARM SYSTEM Active Contract Opportunity Notice ID 140P6326B0010 Related
INTERIOR, DEPARTMENT OF THE
Follow OPF-S IRD/Codorus Creek Herbicide Application NEW Active Contract Opportunity Notice ID W912DR26QA065
DEPT OF DEFENSE
Due by 9/18/2026
Follow Z--GOGA 336173 - Repair Conzelman Road Active Contract Opportunity Notice ID 140P2026R0106
INTERIOR, DEPARTMENT OF THE
Due by 10/29/2026