Statewide Facility Conditions Assessments

Agency: State of Vermont
State: Vermont
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
Posted Date: Jan 5, 2026
Due Date: Jan 22, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER
Statewide Facility Conditions Assessments
01/13/2026 04:30PM


01/22/2026 04:30PM

Attachment Preview

Agency of Administration, Department of Building and General Services
BGS Financial Operations
Office of Purchasing & Contracting
133 State Street, 5th Floor | Montpelier VT 05633-8000
802-828-2211 phone |802-828-2222 fax
http://bgs.vermont.gov/purchasing
SEALED BID
REQUEST FOR PROPOSAL
STATEWIDE
FACILITY CONDITION ASSESSMENTS
ISSUE DATE
BIDDERS CONFERENCE
QUESTIONS DUE
RFP RESPONSES DUE BY
January 5, 2026
A bidders’ conference will not be held.
January 13, 2026 at 4:30 PM
January 22, 2026 at 4:30 PM
PLEASE BE ADVISED THAT ALL NOTIFICATIONS, RELEASES, AND ADDENDUMS ASSOCIATED
WITH THIS RFP WILL BE POSTED AT:
http://www.bgs.state.vt.us/pca/bids/bids.php
THE STATE WILL MAKE NO ATTEMPT TO CONTACT INTERESTED PARTIES WITH UPDATED
INFORMATION. IT IS THE RESPONSIBILITY OF EACH BIDDER TO PERIODICALLY CHECK THE
ABOVE WEBPAGEFOR ANY AND ALL NOTIFICATIONS, RELEASES AND ADDENDUMS
ASSOCIATED WITH THIS RFP.
STATE CONTACT:
E-MAIL:
James Meyers, State Senior Purchasing Agent
BGS.OPCVendorDocs@vermont.gov
Revised: March 18, 2025
Page 1 of 27
1. OVERVIEW:
1.1. SCOPE AND BACKGROUND: Through this Request for Proposal (RFP) the Office of Purchasing &
Contracting on behalf of the Department of Buildings and General Services (BGS) (hereinafter the
“State”) is seeking to establish contracts with one or more companies that can provide Facility Condition
Assessments (FCA) across a broad spectrum of buildings, including buildings such as state offices,
correctional facilities, housing, welcome and information centers, state police barracks, libraries,
courthouses, the State House, laboratories, historic sites, and Vermont Veterans’ Home. Some buildings
have tunnels, both confined and walkable. Contract values will vary depending on the number of firms
hired and each firm’s scope of work. The State has completed two rounds of FCA’s on a 5 year cycle
each and has begun moving FCA asset data from the latest round into an integrated workplace
management system which will be the source of existing asset data for this round of FCA’s. Previous
FCA reports will be made available to the contracted firm via a SharePoint site in PDF format and FCA
asset and property data will be made available in either .csv or xlsx format.
1.2. CONTRACT PERIOD: Contracts arising from this RFP will be for a period of five years. The State
anticipates the start date for such contract(s) will be February 1, 2026.
1.3. SINGLE POINT OF CONTACT: All communications concerning this RFP are to be addressed in writing
to the State Contact listed on the front page of this RFP. Actual or attempted contact with any other
individual from the State concerning this RFP is strictly prohibited and may result in disqualification.
1.4. BIDDERS’ CONFERENCE: A bidders’ conference will not be held.
1.5. QUESTION AND ANSWER PERIOD: Any bidder requiring clarification of any section of this RFP or
wishing to comment on any requirement of the RFP must submit specific questions in writing no later than
the deadline for question indicated on the first page of this RFP. Questions may be e-mailed to the point
of contact on the front page of this RFP. Questions or comments not raised in writing on or before the last
day of the question period are thereafter waived. At the close of the question period a copy of all
questions or comments and the State's responses will be posted on the State’s web site
http://www.bgs.state.vt.us/pca/bids/bids.php . Every effort will be made to post this information as soon as
possible after the question period ends, contingent on the number and complexity of the questions. All
information provided by vendors during this process will be public and bidders shall not provide
confidential information, except as described in 4.1 below.
1.6. CHANGES TO THIS RFP: Any modifications to this RFP will be made in writing by the State through the
issuance of an Addendum to this RFP and posted online at http://www.bgs.state.vt.us/pca/bids/bids.php .
Modifications from any other source are not to be considered.
2. DETAILED REQUIREMENTS/DESIRED OUTCOMES: The anticipated yearly scope of work involves
completing 20% of the inventory of State-owned buildings annually. Building and General Services oversees
approximately 4,294,423 gross square feet of building space, spread across approximately 338 buildings, with
an estimated replacement value of $1,412,809,257.89. In collaboration with the BGS Project Manager
assigned, the contractor will propose a schedule and sequence for conducting Facility Condition Assessments
on the BGS inventory, following a pre-established priority.
2.1. The State of Vermont is interested in obtaining bids to meet the following business need(s): The anticipated
yearly scope of work involves completing 20% of the inventory of State-owned buildings annually. The BGS
oversees approximately 4,308,821 gross square feet of building space, spread across around 338
buildings, with an estimated replacement value of $1,424,106,705. However, these numbers are subject to
change depending on the acquisition or sale of facilities during the contract period as well as loss of
basement space due to natural disasters and renovations throughout the life of the contracted period. In
collaboration with the State’s assigned Project Manager, the contractor will propose a schedule and
sequence for conducting Facility Condition Assessments on the BGS inventory, following a pre-established
priority. A separate Statement of Work will be prepared and approved, detailing the buildings that constitute
the 20% sample of the inventory to be visited. These facilities are located throughout the State with one
building located in Massachusetts. The required assessments shall evaluate the physical condition of each
building, including its infrastructure, systems, and finishes, to identify deficiencies and prioritize repairs, the
current value assessed, and replacement costs or deferred costs. The results of this study will assist the
State in developing an all-inclusive capital plan to address current and future maintenance issues.
2.2. GENERAL REQUIREMENTS: BUILDING/FACILITY CONDITION ASSESSMENT: The contractor shall
provide Facility Condition Assessments as directed by the State assigned Project Manager. The successful
Revised: March 18, 2025
Page 2 of 27
Bidder will perform all the services and duties described. The collection of data and ability to report will be
uniform across all buildings assessed. The content of the Facility Condition Assessments shall include, but
not necessarily be limited to:
2.2.1.Provide qualified and experienced assessment team(s) to complete comprehensive facility condition
assessments (FCA’s) for each of the State of Vermont buildings. Teams should include qualified and
experienced facility assessors who have knowledge of standard guides for property condition
assessments and when working with historic properties.
2.2.2.Perform visual inspections of all building assets included in this scope to assess the remaining
lifecycle of major asset systems, identify deferred maintenance requirements, recognize life safety
issues, and detect major accessibility concerns. Requirements are conditional, operational and
system replacement needs, all relating to the system lifecycle. Each requirement shall be classified by
priority, requirement category (cause of issue), asset system and cost to allow for multiple queries,
data analysis and forecasting.
2.2.3.The scope of the FCA shall include but is not limited to the buildings listed in Attachment G. The
inventory of buildings is subject to change depending on the acquisition or sale of facilities during the
contract period as well as loss of space due to natural disasters or renovations throughout the life of
the contracted period. Change requests will be approved prior to any changes made to the scope.
2.2.4.Security Procedures in some State buildings require a background clearance be performed on any
contractor working inside the building, prior to beginning work. Projects at Correctional Facilities,
Courthouses, and Public Safety buildings may all require clearances. The Specifications outlining the
Security Procedures for work in these facilities are attached to this RFP, as well as the sample
background check forms. If background checks are required, the contractor will be required to submit
background clearances before any work can begin.
2.3. DATA COLLECTION AND MANAGEMENT: Contractor shall visually inspect all building assets included
in the scope of the project, identify deficient conditions and assess the remaining lifecycle of designated
asset systems. The required assessments shall evaluate the physical condition of each building, including
its infrastructure, systems, and finishes, to identify deficiencies and prioritize repairs, the current value
assessed, and replacement costs or deferred costs. The contractor shall document deferred maintenance
deficiencies, including digital photographs of asset exteriors and any observed conditions within the
assets. The survey will include a visual inspection of the building and all of the building’s architectural,
mechanical, electrical, security and site systems. The contractor shall use State provided property data
and list of assets to verify and correlate with the properties and assets in the field.
2.3.1. Contractor shall confirm general building information including, but not limited to:
2.3.1.1. Building description, construction type and age.
2.3.1.2. Site description.
2.3.1.3. Description of the exterior envelope and the condition of each component.
2.3.1.4. A description of the interior finishes and their condition.
2.3.1.5. Asset IDs where tagged, as well as make and model
2.3.1.6. Comments regarding accessibility (high level visual, not legal federal compliance review)
2.3.1.7.
Comments regarding the existence of any hazardous material including lead paint,
asbestos containing materials, mold and the like.
2.3.1.8. Comments and details on any fire or life safety issues
2.3.1.9. A description and assessment of HVAC system.
2.3.1.10. A description and assessment of electrical system.
2.3.1.11. A description and assessment of the plumbing system.
2.3.1.12. A description and assessment of the conveying system.
2.3.1.13. A description and assessment of the security system.
2.3.1.14. A description and assessment of buildings fire protection system.
Revised: March 18, 2025
Page 3 of 27
2.3.2.Prioritization/Categorization/Classification of Data
Each correction project shall associate within the following three items from which multiple sorts,
reports and analysis may be conducted.
2.3.2.1.
DEFICIENCY PRIORITIZATION: Assign a priority to each deferred maintenance deficiency
to allow grouping the deficiencies into common sets. Categories are listed below but should
be customizable.
Table 1. Priorities – associate deficiencies with a timeframe; standard priorities listed in this table may
be tailored to meet the States requirements.
Priority
1
2
3
4
2.3.2.2.
Definition
Impact
Current critical conditions:
Immediate action <=1 year
a: Correct a cited safety hazard,
b: Stop accelerated deterioration,
c: Return a facility to operation
Potential critical conditions, if not
corrected expeditiously, will
become critical within a year.
1 - 2 years
a. Intermittent operations
b. Rapid deterioration
c. Potential life safety
hazards
Necessary, not yet critical
conditions require appropriate
attention to preclude predictable
deterioration or potential downtime
and associated damage or higher
costs if differed further
3 – 4 years
No immediate action needed
>=5 years
PROJECT TYPE: Assign a plan type to each deferred maintenance deficiency to allow
grouping the deficiencies into common sets by cause or reason. Recommended
categories are listed below but should be customizable.
Project Type Category
Safety
Performance/Integrity
Accessibility
Environmental
Retrofit/Adaptation
Descriptions
An observed or reported unsafe condition that if left unaddressed could
result in injury; a system or component that presents potential liability
risk.
Components or systems have failed, are almost failing, perform
unreliably, do not perform as intended, and/or poses risk to overall
system stability.
Does not meet ADA, UFAS, and/or other accessibility requirements.
Improvements to air or water quality, including removal of hazardous
materials from the building or site.
Components, systems, or spaces recommended for upgrades in order
to meet current standards, facility usage, or client/occupant needs.
Revised: March 18, 2025
Page 4 of 27
Lifecycle/Renewal
Any component or system that is neither deficient nor aged past EUL
but for which future replacement or repair is anticipated and budgeted.
2.3.2.3.
CLASSIFICATION: Architectural, Mechanical and electrical systems as classified by ASTM
E1557 UNIFORMAT II standard Level 4. See attachment E.
2.3.2.
CORRECTIVE ACTION: Recommend corrective action for each deficiency. The actions are based
upon the materials and equipment required to repair or replace the identified deficiency along with
necessary labor and potential soft costs. Specific project details and cost estimates shall include a
project-by-project description and cost analysis with enough detail to reveal the scope of work, its
location and the expected cost in “today’s” dollars. Identify source(s) used as a basis for cost
estimates. The report shall include a section which describes cost estimation methodology.
2.3.3. DIGITAL PHOTOS: Take digital photos during the assessment to visually illustrate existing
conditions. The photographs shall be of the exterior and the critical deficiencies within each asset.
2.3.4. FACILITY CONDITION INDEX: Calculate the FCIs for each building and the entire portfolio. The
State expects to be able to ascertain the impact of various funding levels on the FCI of the assets,
or alternatively, the finding levels required to achieve a specific asset FCI.
2.4 Building Infrastructure Lifecycle Facility Condition assessment: Gather specific information for each system
including building components with summaries and projections over 20 years: For each building or site asset
component identified within a project, the contractor shall provide.
The quantity required.
The units that the asset is usually associated with.
The unit cost of the asset.
The extended total cost of the asset.
Any necessary adjustment factors.
The original installation date.
The condition of the asset, and
Life expectancy that is typically associated with the asset.
2.5 DELIVERABLE: All information shall be categorized in property specific excel workbooks provided by the State
before each phase’s onsite assessment period (see SCHEDULE below). Submissions shall be reviewed and
approved by the State assigned Project Manager, incorporating any comments and/or corrections identified by
the Project Manager. New and updates to existing assets shall be classified using ASTM Uniformat II
Classification for Building Elements or latest Uniformat Elements standard as directed by project manager in
the scope of work for each phase. Inputs include but are not limited to, the asset and components, conditions
and corrective actions, condition rating score, prioritization, project type, typical useful life, cost estimates, and
other data or related metrics found in the reports. The workbooks will be formatted with specified areas for all
applicable information and notes to be updated and new assets to be added. Care must be taken by the
contractor not to alter, add, or remove columns, tables, worksheets, or formatting without direct approval from
the State Project Manager. Photos shall be formatted at JPEG and the files shall be named with the State Asset
Number followed by an underscore and sequential number (i.e. 7023_01, 7023_02, etc.). Photos and other
contractor developed documents and reports related to the assessment are to be delivered to the State along
with completed workbooks through a State IT approved means.
2.6 SCHEDULE: The contractor will work with the State Project Manager to develop the schedule with an
anticipated start date of July of each year until the completion of all building assessments as of May 2030.
DESCRIPTION
Preliminary planning and scope review
Review and approve draft of deliverables
DURATION
February 19, 2026
February 30, 2026
Revised: March 18, 2025
Page 5 of 27
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

RFQ Design Engineering Services - Essex Complex Request Date: 6/8/2026 11:29:38 AM Open

State Government of Vermont

Bid Due: 7/02/2026

Bid Number: 20260605 Bid Title: RFQ Design Engineering Services - Essex Upper Main

Town of Essex

Bid Due: 6/24/2026

Architectural Services for Residential Elevations Request Date: 6/8/2026 2:03:58 PM Open Date: Closing

State Government of Vermont

Bid Due: 6/26/2026

RFP Design of Murals on Pillars of Rutland Transit Center Request Date: 5/21/2026

State Government of Vermont

Bid Due: 7/10/2026