State Parks Project – Reid Harbor Moorage Improvements at Stuart Island State Park
| Agency: | Sammamish Plateau Water |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 22, 2026 |
| Due Date: | Apr 21, 2026 |
| Solicitation No: | NW-C3914R |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: The work for this project includes the replacement of existing float systems, fixed pier, and gangway at Reid Harbor in Stuart Island State Park. Major items included (but not limited to) in the Work are as follows:
1. Removal of the timber floats, gangway, timber pier and timber piles;
2. Fabrication and installation of steel float systems, steel pipe piles, aluminum gangway, aluminum walkways, and concrete abutment;
3. Salvaging the existing island floats; and
4. Temporarily move the existing pumpout float and replacing the existing timber support dolphins with steel pipe piles.
See Also
Project: BID - CPTC - Elevator Upgrade - Clover Park Technical College Ref.
State Government of Washington
Due by 9/16/2026
Project: BID - LWIT - Exterior Building Painting & Signs - Lake WA
State Government of Washington
Due by 9/17/2026
Follow Bldg. 1051 Replace Main Dry Valves Active Contract Opportunity Notice ID N0025326Q0013
DEPT OF DEFENSE
Due by 9/21/2026
Basic Information Solicitation Number MC-0322903 Title Asphalt Paving & Striping Unit Price Portwide
Port of Seattle
Due by 9/29/2026