Starr Corp, Construction Manager, is requesting bids for College of Southern Idaho Diesel Mechanics Facility. Bids will be due on May 2, 2024. Please contact Starr Corp. at (208) 733-5695 for bid packages and location of bid opening.

Agency: State Government of Idaho
State: Idaho
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Apr 9, 2024
Due Date: May 2, 2024
Solicitation No: 22091
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
submission date project number project name
05-02-24 22091 Starr Corp, Construction Manager, is requesting bids for College of Southern Idaho Diesel Mechanics Facility. Bids will be due on May 2, 2024. Please contact Starr Corp. at (208) 733-5695 for bid packages and location of bid opening.

Attachment Preview

College of Southern Idaho
Diesel Mechanics Facility
--Invitation to Bid--
Bids to complete work as defined will be accepted, from invited contractors, by Starr
Corporation until May 2, 2024 at 2:00 PM. Bids may be delivered to 2995E 3600N,
Twin Falls, ID or emailed to csibids@starrcorporation.com. Bids to be valid for 30
days. Bids to be submitted utilizing the attached bid form. Plans for this project are
available on Starr Corporation’s website.
http://plans.starrcorporation.com/projects/index.php
Starr Corporation is the CM/GC for this project. Starr Corporation may elect to submit a
proposal on these bid packages. Starr Corporation’s proposal will be submitted no later
than 12:00 PM on the bid date. Bids will be opened with a representative of the owner.
This early bid delivery is designed to give all bidders an assurance of an open,
competitive, and fair bidding environment.
The bid opening will be held on the CSI campus in room 248 of the Taylor Building at
2:00 PM on May 2, 2024.
The project documents consist of the following:
Bid Documents
Project Drawings stamped and dated January 25, 2024
Project Specifications dated January 2024
Project Schedule
When submitting a bid, include the following:
Bid Form
Drug and Alcohol Affidavit
CONTRACTOR BID PROPOSAL
CSI Diesel Mechanics Facility
College of Southern Idaho, Twin Falls, ID
TO: Starr Corporation
2995 E 3600N, Twin Falls, ID 83301
csibids@starrcorporation.com
BIDDER: __________________________________________________________________________
Gentlemen:
The Bidder, having examined the bidding and contract documents, and the site of the proposed work
and being familiar with all of the conditions surrounding the construction of the proposed project
including the availability of materials and labor, hereby proposes to furnish all labor, equipment,
materials and supplies to complete the work as outlined in the contract documents and at the prices
stated below. These prices are to cover all expenses incurred in performing the work required under the
Contract Documents of which this proposal is a part.
Bidder acknowledges receipt of Addenda No. ________, ________, _________, ________
Bid Package No.______
Bid Package Description____________________________________
Amount (numerically) $_________________________________________________________
Amount (written) ______________________________________________________________
Add Alternates
Add Alternate No. 1 Storefront Systems
Affected Packages
No. 03 Metal Building Systems
No. 09 Aluminum Framed Entrances and Storefronts
Bid amount to complete the work of Add Alternate No. 1:
Amount (numerically) $_________________________________________________________
Amount (written) ______________________________________________________________
Add Alternate No. 2 Operable Panel Partition
Affected Packages
No. 3 Metal Building Systems
No. 10 Gypsum Board Systems
No. 14 - Specialties
Bid amount to complete the work of Add Alternate No. 2:
Amount (numerically) $_________________________________________________________
Amount (written) ______________________________________________________________
Add Alternate No. 3 Canopy Shade Structure
Affected Packages
No. 01 - Concrete
No. 03 Metal Building Systems
No. 20 - Earthwork
No. 22 Landscape & Irrigation
Bid amount to complete the work of Add Alternate No. 3:
Amount (numerically) $_________________________________________________________
Amount (written) ______________________________________________________________
Add Alternate No. 4 Canal Pipe Structure
Affected Packages
No. 20 Earthwork
No. 22 Landscape & Irrigation
Bid amount to complete the work of Add Alternate No. 3:
Amount (numerically) $_________________________________________________________
Amount (written) ______________________________________________________
Bidder understands that Starr Corporation reserves the right to reject any or all bids and to waive any
informalities in the bidding.
The bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 calendar days
after the scheduled closing time for receiving bids.
Any modification or addition to this Bid Proposal may render the bid unresponsive and void.
An Idaho Public Works Contracting Licenses is required to work on this project.
Idaho Public Works License Number ____________________________________________
Contractor Registration Number RCE
.
Dated this_________________________ day of______________________, 2024.
(date)
(month)
Corporate Seal, if applicable
Respectfully submitted,
By:
(Company)
(Business Address)
(Signature)
(Title)
(Telephone Number)
CSI Diesel Mechanics Facility
Bids to Starr Corporation by May 2, 2024 at 2:00PM
Bid
Package Package Description
No.
BP-01 CONCRETE
Concrete
Concrete
Concrete
Concrete
Spec
Section
Description
Division GENERAL REQUIREMENTS
031000 Concrete Forming & Accessories
032000 Concrete Reinforcing
033000 Cast-In-Place Concrete
Additional Comments - (All items include material,
labor, and equipment for installation, unless noted
otherwise)
All sections to be included in their entirety.
Excavation and backfill included. Placement of gravel
base under the building SOG is included in this
package. Gravel supplied by others. Includes supply
and installation of interior and exterior bollards. Includes
installation of anchor bolts provided by others.
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
Concrete
BP-02 MASONRY
Masonry
Masonry
Masonry
Masonry
BP-03 METAL BUILDING SYSTEMS
Metal Building Systems
Metal Building Systems
Metal Building Systems
Metal Building Systems
Metal Building Systems
Metal Building Systems
Metal Building Systems
Metal Building Systems
Metal Building Systems
BP-04 ROUGH CARPENTRY
Rough Carpentry
Rough Carpentry
Rough Carpentry
Rough Carpentry
BP-05 MILLWORK
Millwork
Millwork
033500 Concrete Finishing
033900 Concrete Curing
036000 Grouting
071100 Damproofing
072113 Board Insulation
079000 Joint Protection
321313 Concrete for Exterior Improvements
Division GENERAL REQUIREMENTS
040503 Masonry Mortaring and Grouting
042019 Veneer Unit Masonry
079000 Joint Protection
Concrete sealer by others.
Foundation insulation only.
Applicable to this scope of work, only.
Includes all site concrete. Concrete mow curb for
landscape by others. Includes concrete foundation and
steel post install for screen fence. Steel posts provided
by others. Concrete for canopy shade structure to be
included in alternate #3 .
All sections to be included in their entirety.
Base and thru wall flashing included. Steel lintels
furnished and isntalled by others.
Applicable to this scope of work, only.
Division 1 GENERAL REQUIREMENTS
051200 Structral Steel Framing
053123 Steel Roof Decking
055000 Metal Fabrications
055200 Metal Railings
072130 Pre-Engineered Building Insulation
108213 Roof Screens
133419 Metal Building Systems
079000 Joint Protection
Division GENERAL REQUIREMENTS
061053 Miscellaneous Rough Carpentry
062000 Finish Carpentry
079000 Joint Protection
Division GENERAL REQUIREMENTS
064100 Architectural Woodwork
All sections to be included in their entirety.
Includes all tube steel framed openings, lintels, steel
mezzanine, interior metal wall panels, and steel for roof
screen. Screen fence steel structure included. Screen
fence posts to be provided to concrete contractor to
install in concrete pier.
Includes bridge crane support beam as indicated on
sheet S102B and shown in elevation -5/S201.
Continuous edge support member per details 7-12 on
sheet S302 included. Structure for roof screen by
others. The roof screen will be connected to the PEMB
structure. Includes metal panels for fence. Canopy
shade structure and panels to be included in alternate
#3 .
All sections to be included in their entirety.
Includes plywood and 2x furring & blocking at top of
parapet walls.
Plywod Wall Sheathing
Applicable to this scope of work, only.
All sections to be included in their entirety.
Includes backing as needed for cabinets and tops.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow ID CLARK 6805(1) ID FREMONT 6805(1), Yale-Kilgore Road, MP 9 to 16.9

TRANSPORTATION, DEPARTMENT OF

Bid Due: 5/02/2024

Follow Big Smoky Hybrid Electrical System Upgrade and Building Foundation Improvements Active Contract

AGRICULTURE, DEPARTMENT OF

Bid Due: 5/30/2024

Follow Replace R22 Chillers Active Contract Opportunity Notice ID 36C26024R0026 Related Notice Department/Ind.

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 5/10/2024

Follow Transformer Project 1: Replacement of Outdoor Panel and Building Feeders - Kimberly,

AGRICULTURE, DEPARTMENT OF

Bid Due: 5/13/2024