St. Ferdinand Park Epoxy Floor Renovation
| Agency: | City of Florissant |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 30, 2025 |
| Due Date: | Jul 18, 2025 |
| Solicitation No: | 25-0216-PR |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 25-0216-PR
Title: St. Ferdinand Park Epoxy Floor Renovation
Addenda: 0
Release Date: 6/30/2025
Due Date: 7/18/2025
General work description: The City of Florissant is seeking bids to install epoxy flooring in 6 bathrooms at St. Ferdinand Park. Contractors should provide, prep, and install a Full Flake Broadcast epoxy flooring system in a total of 6 rooms, totaling 890 SF, with integrated cove base. The expansion gap along the exterior walls will be filled with a flexible material before the coves are installed. The entire system will receive an additional coat of urethane for wear and chemical resistance.
Color samples should be provided to the City if selected for the project.
Surface Preparation:
- Abrade all specified concrete surfaces using a portable industrial diamond grinding unit with an integrated dust recovery system or other abrading equipment necessary to prepare the surface to receive the subsequent coating system.
- Abrade all specified concrete edges using diamond grinding equipment with an integrated dust recovery system.
Form a cove base with the floor system for seamless continuation up the vertical surface for four (4) inches, cove and floor system to match
Clean and rout out the designated cracks and joints to an acceptable width and fill with compatible filling material to match the intended usage.
Remove all damaged or loose substrate previously identified and replace with rapid strength epoxy repair mortar, polymer concrete or other compatible repair material.
For Site Visits Contact:
Jimmy Kirincich
Director of Parks and Recreation
314-461-2721
jkirincich@florissantmo.com
Site Address:
St. Ferdinand Park
25 Saint Ferdinand Park Dr.
Florissant, MO 63031
Veach Pavilion Bathrooms and Bathroom by Field 3
Passcode: ssvR3Q
See Also
Leon Storm Siren Improvements - Leon, KS 25-PF-020 StatusAccepting Bids Bid Date 9/23/26
Drexel Technologies
Due by 9/23/2026
Ash & Cedar Street KDOT Cost Share Project - Pleasanton, KS 25-1287 StatusAccepting
Drexel Technologies
Due by 10/01/2026
Leon Storm Siren Improvements - Leon, KS 25-PF-020 StatusAccepting Bids Bid Date 9/23/26
Drexel Technologies
Due by 9/23/2026
Harrisonville ECC Parking Lot & HMS Loop Drive Harrisonville SD Parking Lot and
Drexel Technologies
Due by 9/24/2026