| Agency: | City of Rock Island |
|---|---|
| State: | Illinois |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 12, 2026 |
| Due Date: | May 26, 2026 |
| Solicitation No: | 2789 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
2789
|
| Bid Title: |
20 ST 7-18 AV Utilities Project
|
| Category: | Construction Projects |
| Status: | Open |
|
20th Street Utilities, Between
7th Avenue and 18th Avenue
The City of Rock Island, Illinois
JOB NO. 2789
Engineering
1309 Mill Street
Rock Island, IL 61201
(309) 732-2200
INSTRUCTIONS TO BIDDERS
Plan and Proposal Documents Prepared by:
The City of Rock Island - Engineering Division
1309 Mill Street
Rock Island, Illinois 61201
The Proposal to be Submitted Before:
9:00 a.m., Tuesday, May 26, 2026
Required Bid Proposal Submission Items to be Signed and/or Filled in:
1. Proposal Form (Item 6 on form notes page ITB-1 compliance) ............. P-1 to P-3
2. Proposal Guaranty (Bid Bond, Bank Draft, Bank Cashier's Check,
Certified Check or Local Agency Proposal Bid Bond) ................P-2 or BB-1
3. Schedule of Prices .................................................................... BP-1 to BP-3
4. Completed Form, Check-Mark, and signature on the page titled:
"Contractor Information On-File at the Office of the City Engineer (1309 Mill Street) For
Responsible Bidder Applications and Documentation" ................................ Page RBO-1
Completion Dates:
Phase1 (Sta. 1+00 to Sta. 22+60) tied to budget constraints, includes all work
between Phase 1 stations, shall be completed by November 30, 2026.
Phase 2 (Sta. 22+60 to Sta. 43+00) tied to budget constraints, includes all
work between Phase 2 stations, shall be completed between May 1, 2027 and
September 30, 2027
Specifications:
This contract shall be in accordance with the "Standard Specifications for Road and
Bridge Construction", adopted April 1, 2022; the "Supplemental Specifications and
Recurring Special Provisions", adopted January 1, 2026; the "City of Rock Island
Construction Standards", adopted January 2023; "Standard Specifications for
Water and Sewer Main Construction in Illinois", adopted July, 2020; the last
revision of the "City of Rock Island Plumbing Code"; and the Special Provisions
contained within these contract documents.
Performance, Labor, Material and Maintenance Bond
The successful Bidder shall be required to provide a Performance, Labor, Material and
Maintenance Bond on the form included in these specifications.
ITB-1
TABLE OF CONTENTS
SP-1. General ................................................................................................................................................ PG-1
SP-2. Equal Employment Opportunity Policy ................................................................................................. PG-1
SP-3. Il Laws Relating to Prevailing Wage, Certified Monthly Payroll & Preference to Illinois Citizens ......... PG-2
SP-4. Insurance ............................................................................................................................................. PG-4
SP-5. City of Rock Island Ordinance Concerning Responsible Bidders ........................................................ PG-4
SP-6. Construction Debris ............................................................................................................................. PG-5
SP-7. Description of Work ............................................................................................................................. PG-6
SP-8. Refuse Collection ................................................................................................................................. PG-6
SP-9. City of Rock Island Ordinance Concerning Storm Water Control ........................................................ PG-7
SP-10. Pavement Removal ............................................................................................................................. PG-8
SP-11. Earth Excavation .................................................................................................................................. PG-8
SP-12. Geotechnical Fabric For Ground Stabilization ..................................................................................... PG-9
SP-13. Aggregate Base Course, Type A, CA-6 ............................................................................................... PG-9
SP-14. Portland Cement Concrete (PCC) Requirements ................................................................................ PG-9
SP-15. Portland Cement Concrete Pavement (Jointed), 8" (With Integral Curb) .......................................... PG-10
SP-16. Curb and Gutter Removal .................................................................................................................. PG-11
SP-17. Combination Concrete Curb and Gutter, Type M-6.18 (Modified) and Type M-6.24 (Modified) ........ PG-11
SP-18. Cold Milling ACC and PCC Surface Removal, 1.5" ........................................................................... PG-11
SP-19. Bituminous Materials (Tack Coat)...................................................................................................... PG-12
SP-20. Hot-Mix Asphalt Binder and Surface Course, IL-9.5, N50, 1.5" ......................................................... PG-13
SP-21. Driveway Pavement Removal ............................................................................................................ PG-13
SP-22. Portland Cement Concrete Residential and Commercial Driveway .................................................. PG-14
SP-23. Sidewalk Removal ............................................................................................................................. PG-14
SP-24. Portland Cement Concrete Sidewalk, 5" ............................................................................................ PG-15
SP-25. PCC Pedestrian Curb Ramp Replacement ....................................................................................... PG-15
SP-26. Removing Manholes .......................................................................................................................... PG-16
SP-27. Manholes To Be Reconstructed With New Frame And Lid (Type A, 4' Diameter) ............................ PG-16
SP-28. Manholes To Be Adjusted With New Frame and Lid ......................................................................... PG-17
SP-29. Removing Cleanouts.......................................................................................................................... PG-18
SP-30. Cleanouts, To Be Adjusted ................................................................................................................ PG-18
SP-31. Removing Catch Basins .................................................................................................................... PG-18
SP-32. Catch Basin, Single or Double, To Be Reconstructed With New Frame And Type C Grate ............. PG-19
SP-33. Catch Basins, To Be Adjusted With New Frame & Type C Grate ..................................................... PG-19
SP-34. Sanitary Sewer, To Be Removed ....................................................................................................... PG-19
SP-35. Sanitary Sewer, Of The Diameter Required, PVC, Pressure Class .................................................. PG-20
SP-36. Sewer Connection To Existing Structure ........................................................................................... PG-20
SP-37. Sanitary Service Reconnection, Onto 8" Main or Manhole ................................................................ PG-20
SP-38. Storm Sewer To Be Removed ........................................................................................................... PG-21
SP-39. Storm Sewer, Of The Required Diameter, PVC, Pressure Class ...................................................... PG-21
SP-40. Interruption of Water Service ............................................................................................................. PG-22
SP-41. Water Main To Be Removed ............................................................................................................. PG-22
SP-42. Water Main, PVC, DR-18, Of The Diameter Specified ...................................................................... PG-23
SP-43. Gate Valve & Box To Be Removed ................................................................................................... PG-24
SP-44. Gate Valve & Box, Of The Size Required .......................................................................................... PG-24
SP-45. Hot Tap Water Main, With Tapping Sleeve and Valve, 16" x 16" x 8" ............................................... PG-25
SP-46. Water Main Fittings, Class 350, DIP, MJ, Of The Dimensions Specified .......................................... PG-27
SP-47. Water Service Connection, With Saddle, 1" ...................................................................................... PG-28
SP-48. Water Service Line, Copper, 1" ......................................................................................................... PG-28
SP-49. Domestic Water Valve And Box ........................................................................................................ PG-29
SP-50. Private Water Service Line ................................................................................................................ PG-29
SP-51. Fire Hydrant To Be Removed ............................................................................................................ PG-32
SP-52. Fire Hydrant ....................................................................................................................................... PG-32
SP-53. Trench Backfill ................................................................................................................................... PG-33
SP-54. Thermoplastic Pavement Marking - Letters and Symbols ................................................................ PG-33
SP-55. Paint Pavement Marking - Line, Color & Size Specified .................................................................... PG-34
SP-56. Bike Lane Signs (MUTCD: R3-17, R8-3a, and R7-9a) ...................................................................... PG-34
SP-57. School Crossing Signs (MUTCD: S1-1, W16-9P) ............................................................................. PG-34
SP-58. Sign Removal ..................................................................................................................................... PG-35
SP-59. Solar, Horizontal, Rectangular Rapid Flashing Beacon, With Push Button Activation ...................... PG-35
SP-60. Sodding .............................................................................................................................................. PG-36
SP-61. Project Signs ...................................................................................................................................... PG-36
SP-62. Traffic Control and Protection ............................................................................................................ PG-36
SP-63. IMPACT Agreement ........................................................................................................................... PG-37
Check Sheet for Supplemental Specifications & Recurring Special Provisions
TOC-1
SPECIAL PROVISIONS
SP-1. GENERAL
The following Special Provisions supplement: the "Standard Specifications for Road &
Bridge Construction," adopted April 1, 2022; the "Supplemental Specifications &
Recurring Special Provisions," adopted January 1, 2026 (as indicated on the check
sheet included herein); the "City of Rock Island Construction Standards", adopted
January 2023, and "Standard Specifications for Water and Sewer Main
Construction in Illinois", adopted July, 2020; and the last revision of the "City of
Rock Island Plumbing Code". The special provisions included herein apply to and
govern the proposed improvement designated as:
20th Street Utilities,
Between 7th Avenue and 18th Avenue,
Job No. 2789
In case of conflict with any part or parts of said specifications, said special provisions
shall take precedent and shall govern.
All construction operations shall be completed as follows:
Phase1 (Sta. 1+00 to Sta. 22+60) tied to budget constraints, includes all work
between Phase 1 stations, shall be completed by November 30, 2026.
Phase 2 (Sta. 22+60 to Sta. 43+00) tied to budget constraints, includes all
work between Phase 2 stations, shall be completed between May 1, 2027 and
September 30, 2027
All related paper work (including change orders, time and materials force accounts and
final quantities) should be completed and submitted to the Engineer no later than
September 30, 2027 with the completion of all construction. Liquidated damages shall
be assessed to the Contractor in accordance with Article 108 of the Standard
Specifications for any work or related paper work that remains uncompleted after the
above stated deadline.
SP-2. EQUAL EMPLOYMENT OPPORTUNITY POLICY
Federal and State laws prohibit discrimination against any employee or applicant for
employment because of race, creed, color, national origin, sex, political affiliation, age
and physical or mental handicap unrelated to ability. They further require elimination of
discrimination in employment with regards to upgrading, demotion, transfer,
recruitment, advertising, layoff, termination, rates of pay, forms of compensation,
selection for training (including apprenticeship) of employees, as well as any other
personnel actions.
PG-1
A. The Contractor agrees to post Equal Employment Opportunity notices in
conspicuous places (e.g. at company headquarters, around time clocks,
at work sites, on company bulletin boards, in lunchrooms) available to
employees and applicants for employment.
B. The Contractor shall in all solicitation or advertisements for employees to
be hired under this contract state that all qualified applicants will receive
consideration for employment without regard to race, color, creed,
religion, sex, national origin, political affiliation, or age.
SP-3. IL LAWS RELATING TO PREVAILING WAGE, CERTIFIED MONTHLY PAYROLL &
PREFERENCE TO ILLINOIS CITIZENS
A. Illinois Prevailing Wage Act: This contract calls for the construction of a
"public work," within the meaning of the Illinois Prevailing Wage Act, 820
ILCS 130/.01 et seq. ("the Act"); and as amended, except where a prevailing
wage violates a federal law, order, or ruling, the rate conforming to the federal
law, order, or ruling shall govern. The Act requires contractors and
subcontractors to pay laborers, workers and mechanics performing services
on public works projects no less than the "prevailing rate of wages" (hourly
cash wages plus fringe benefits) in the county where the work is performed.
For information regarding current prevailing wage rates, please refer to the
Illinois Department of Labor's website at:
https://www.illinois.gov/idol/Laws-Rules/CONMED/Pages/Rates.aspx
All contractors and subcontractors rendering services under this contract
must comply with all requirements of the Act, including but not limited to, all
wage, notice and record keeping duties. The scale of wages shall be posted
by the Contractor in prominent and easily accessible places at the site of
work. If the Department of Labor revises the wage rates, the revised rate
shall apply to this contract and the contractor or subcontractor will not be
allowed additional compensation on account of said revisions. Contractor
shall continually check the scale of wages during the work and update the
posted documents as needed. The monitoring and posting of rates by
Contractor shall be included in the contract and not measured or paid
separately.
B. The Contractor and each subcontractor shall "Make and keep, for a period of
not less than 5 years from the date of the last payment on a contract or
subcontract for public works, records of all laborers, mechanics, and other
workers employed by them on the project; the records shall include each
worker's name, address, telephone number when available, last four digits of
the worker's social security number, gender, race, ethnicity, veteran status,
classification or classifications, skill level (such as apprentice or journeyman),
PG-2
the worker's gross and net wages paid in each pay period, the number of
hours worked each day, and the starting and ending times of work each day,
the worker's hourly wage rate, the worker's hourly overtime wage rate, the
worker's hourly fringe benefit rates, the name and address of each fringe
benefit fund, the plan sponsor of each fringe benefit, if applicable, and the
plan administrator of each fringe benefit, if applicable."
The Illinois Department of Labor maintains a database for certified payrolls as
created under Section 5.1 of the Act. All Contractor and Subcontractor
certified payrolls shall be submitted to the Illinois Department of Labor, except
for projects done by State agencies that opt to have contractors submit
certified payrolls directly to that State agency. A State agency that opts to
directly receive certified payrolls must submit the required information in a
specified electronic format to the Department of Labor no later than 10 days
after the certified payroll was filed with the State agency.
Per Section 5.1 of the Act, the Department of Labor rather than the public
body in charge of the project shall keep the records and maintain the
database. The records submitted for workers shall be considered public
records, except an employee's address, telephone number, social security
number, race, ethnicity, and gender, and made available in accordance with
the Freedom of Information Act. The public body shall accept any
reasonable submissions by the contractor that meet the requirements of the
Act in the interim period. A contractor, subcontractor, or public body may
retain records required under the Act in paper or electronic format.
Per Section 5.1 of the Act, and prior to the City making payment, "all
contractors and subcontractors rendering services under this contract shall
no later than the fifteenth day of each calendar month" file the required
certified payroll using Illinois Department of Labor (IDOL) Forms IL452CM01
and IL452CM02 for the work completed in the immediately preceding month
with the public body in charge of the project. Certified payroll using IDOL
forms must be filed for only those calendar months during which construction
has occurred. The certified payroll shall consist of a complete copy of the
records identified above, but may exclude the starting and ending times of
work each day.
The certified payroll shall be accompanied by a statement signed by the
Contractor or subcontractor or an officer, employee, or agent of the
Contractor or subcontractor which avers that: (i) he or she has examined the
certified payroll records required to be submitted by the Act and such records
are true and accurate; (ii) the hourly rate paid to each worker is not less than
the general prevailing rate of hourly wages required by this Act; and (iii) the
contractor or subcontractor is aware that filing a certified payroll that he or
she knows to be false is a Class A misdemeanor. The submittal of and all
PG-3
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Title: 2026 Public Works Landscape Waste Fence Project Category: Public Works Status:
Town of Normal
Bid Due: 8/05/2026
Description Opening Date/Time Closing Date/Time BID 2026-10 Sanitary Sewer Televising and Cleaning Services
Woodridge village
Bid Due: 8/11/2026
Project 102-302-049 Bid Date Tuesday, August 18, 2026 11:00 AM Description Upgrade Campground
Illinois Capital Development Board
Bid Due: 8/18/2026
Bid Title: Millenium Park Sediment Removal & Bank Stabilization Project Category: Millenium Park
Fox Lake village
Bid Due: 8/11/2026