Spiketon Bridge
| Agency: | Pierce County |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 8, 2025 |
| Due Date: | Jan 21, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Spiketon Bridge
Addenda: 2
Release Date: 12/27/2024
Due Date: 1/21/2025
The work consists of demolishing the existing concrete abutments. Provide for the design and construction of a 160-foot-long pre-engineered modular steel bridge and concrete abutments. This work also includes the resurfacing of the existing adjacent trail and other work, all in accordance with the attached Contract Plans, Contract Provisions, and the Standard Specifications. Driveway expansion at 27513 Lower Burnett Rd. E, Buckley, WA, relocating the mailbox, relocating the existing 15’ swing gate, and installing one 15’ wide swing gate.
The pre-bid walkthrough will begin at the Foothill Trails Bridge and continue down the trail adjacent to the bridge.
See Also
Bid Number: 26-008 Bid Title: 39th Ave SE Tank No 1 Retrofit and
City of Puyallup
Due by 9/28/2026
SEP Program: Solicitation Name: DBE Driver Barrier Enclosure SEP %: Solicitation ID: WMATA-0000010936
Washington Metropolitan Area Transit Authority
Due by 10/07/2026
Number RFQ 6625-26 Title Vertical Polyethylene Storage Tank(s) 10,000 Gallons or Larger Tank
City of Spokane
Due by 9/25/2026