Spanish Fort Center Pickleball Complex Addendum 1

Agency: Spanish Fort city
State: Alabama
Type of Government: State & Local
Posted Date: Jan 15, 2025
Due Date: Jan 16, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

The City of Spanish Fort has the following open bids:

?

Spanish Fort Center Pickleball Complex Addendum 1

January 14, 2025

Addendum #1

To: All Bidders

From: Nick Combs

Date: January 14, 2025

RE: Spanish Fort Center Pickleball Complex

General

A copy of the following addendum can be found by clicking here .



? The project shall be completed in 120 calendar days following a 15 day Notice to Proceed Period.

? Contractor shall coordinate with the City of Spanish Fort to relocate exercise equipment from

within the project footprint.

? Access to the park shall be maintained at all times.

? Contractor shall coordinate court surface color options with the City and Engineer prior to

placement.

? The contractor shall be responsible for repairing/replacing any damaged asphalt and/or concrete

within the staging area and/or along the haul route.

? This project is being re-bid in an effort to reduce construction costs and includes the following

revisions from the originally bid project plans and specifications:

o Asphalt base replaced Post-Tension Concrete Slab

o Acrytech Standard Sport Surfacing System for asphalt courts required in lieu of

Picklemaster Five Layer Cushion System.

o The new fence heights are 8’ and 4’

o Reduced tables and seating

o Revised the Shade Sail Structure

? Superior Shade, back-to-back square cantilever umbrella shade, is approved as an alternate to

USA- Shade product specified.

? Putterman Net Posts and netting will be allowed as a substitute

? Ball Fabrics: Extreme Windscreen will be allowed as a substitute

? Light Pole Depot Direct Burial Pole will be allowed as a substitute

? Medina Power ARL LED Area Light will be allowed as a substitute

? RAB Bullhorn Bracket will be allowed as a substitute

? RAB LED luminaire A17-3T375 will be allowed as a substitute

? RAB Lighting PTR6-07-20WT light pole will be allowed as a substitute

? The Instructions to Bidders Article 8: Bid Security Section 8.01 is hereby amended as follows: A

Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of

Bidder’s maximum Bid price (determined by adding the base bid and all alternates), but in no

event exceeding $10,000, and in the form of a certified check, bank money order, or a Bid bond

(on the form included in the Bidding Documents) issued by a surety meeting the requirements

of Paragraphs 6.01 and 6.02 of the General Conditions.

RFI Response Log

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

37-25 Open Bid 37-25 A Storm Shelter at Holiday Shores Located in District

Marshall County

Bid Due: 6/23/2026

Follow United States Space Command (USSPACECOM) Command and Control Facility (C2F): Owner's Advisor

DEPT OF DEFENSE

Bid Due: 6/30/2026

Follow Access Control Point Active Contract Opportunity Notice ID W9127826RA077 Related Notice Department/Ind.

DEPT OF DEFENSE

Bid Due: 6/11/2026

James Record Road Railroad Crossing Project No. 71-23-RD05 & ALDOT Project No. RHPD-STPHV-RR17(910)

City of Huntsville

Bid Due: 6/05/2026