Spanish Fork River Park Pipe Fence

Agency: Utah County
State: Utah
Type of Government: State & Local
NAICS Category:
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Apr 29, 2026
Due Date: May 19, 2026
Solicitation No: Bid No: 2026-8
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • Spanish Fork River Park Pipe Fence
    Apr 29, 2026 - May 19, 2026
    Bid No: 2026-8

    Utah County intends to select a qualified contractor to provide for the construction and completion of improvements to Spanish Fork River Park located up Spanish Fork Canyon that meet in every detail, the specifications and Spanish Fork River Park Pipe Fence plans, herein referred to as (the Drawings), included in or referenced in this ITB. Submissions are to be made through the State U3P Bonfire (EUNA) website.

    Read More
    View RFP Document
  • Attachment Preview

    INVITATION TO BID For Utah County Spanish Fork River Park Pipe Fence ITB # 2026-8

    UTAH COUNTY
    PUBLIC WORKS DEPARTMENT
    2855 South State Street
    Provo, Utah 84606
    (801)851-8600
    INVITATION TO BID
    For
    Utah County
    Spanish Fork River Park
    Pipe Fence
    ITB # 2026-8
    CLOSING DATE
    FOR RECEIPT OF BIDS: Tuesday, May 19, 2026 at 3:00 pm
    TIME: 3:00 p.m. (Mountain Time)
    PLACE: Proposals are to be submitted through the State U3P
    website, using the Bonfire (EUNA) eProcurement
    platform.
    NOTE: The Contractor is responsible for reading the contents of this bid, including but not limited to, the Scope of
    Work, General Requirements, Specifications, the Drawings, and Agreement. The Contractor is also responsible to
    visit the work sites before presenting a bid.
    Privacy Notice: Pursuant to Section 63A-19-402 of Utah Code, personal data collected in
    documents that would be classified as a public record may be made available to the public as
    provided by Section 63G-2-201.

    TABLE OF CONTENTS
    INVITATION TO BID
    Intent ............................................................................................................................4
    Procedure .......................................................................................................................4
    Rules of Procurement .....................................................................................................4
    Bid Organization ............................................................................................................4
    Proprietary Information .................................................................................................5
    Questions and Clarifications ..........................................................................................5
    Acceptance of Bid ..........................................................................................................5
    Disqualification of Bid ...................................................................................................6
    Disposition of Bids ........................................................................................................6
    Interpretation of ITB ......................................................................................................6
    Required Experience ......................................................................................................6
    Evaluation Criteria .........................................................................................................7
    General ..........................................................................................................................7
    Bonds ............................................................................................................................7
    GENERAL REQUIREMENTS
    Alterations of Plans or Character of Work .....................................................................9
    Brand Name ...................................................................................................................9
    Change Order .................................................................................................................9
    Completion Date ..........................................................................................................10
    Liquidated Damages .................................................................................................... 11
    Cooperation .................................................................................................................. 11
    Data Privacy ................................................................................................................. 11
    Delivery/Shipping ........................................................................................................12
    Inspection .....................................................................................................................12
    Insurance ......................................................................................................................13
    Keys .........................................................................................................................13
    Legal .........................................................................................................................13
    License .........................................................................................................................13
    Payment........................................................................................................................13
    Safety Requirements ....................................................................................................14
    Sales Tax ......................................................................................................................14
    Supervision of Work ....................................................................................................15
    Surveying .....................................................................................................................15
    Utilities .........................................................................................................................15
    Statement of Applicable Standards and Specifications ......................................................16
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 2

    Specifications Measurement and Payment
    General .........................................................................................................................17
    General Conditions ......................................................................................................17
    Mobilization and Demobilization ................................................................................18
    Fence removal ..............................................................................................................18
    2-3/8" Drill Pipe Fence......................................................................... 18
    16' Gate. .......................................................................................................................18
    Park Entrance Gate. .....................................................................................................18
    Park Entrance Bow. ......................................................................................................18
    PLANS "Spanish Fork River Park Pipe Fence" (the Drawings) ................... Attachment A
    CONTRACTOR'S BID SCHEDULE ............................................................ Attachment B
    CONTRACTOR INFORMATION FORM ............................................................ Exhibit A
    CERTIFICATE OF NON-COLLUSION ............................................................... Exhibit B
    SAMPLE AGREEMENT WITH STANDARD TERMS & CONDITIONS ......... Exhibit C
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 3

    1. INVITATION TO BID
    1.1 INTENT
    Through this Invitation to Bid (ITB), Utah County intends to select a qualified contractor
    to provide for the construction and completion of improvements to Spanish Fork River
    Park located up Spanish Fork Canyon that meet in every detail, the specifications and
    Spanish Fork River Park Pipe Fence plans, herein referred to as (the Drawings), included
    in or referenced in this ITB.
    The Contractor shall furnish all labor, materials, transportation, tools, equipment,
    supplies, disposal fees, and other costs required to complete the work in accordance with
    the terms hereof.
    Pursuant to this ITB, an agreement will be executed, a sample copy of which is attached
    as Exhibit C. The County will not entertain changes to its Standard Terms and
    Conditions.
    1.2 PROCEDURE
    The procedure for response to this ITB, evaluation of bids, and selection of a Contractor
    is as follows:
    A. Interested entities will prepare and submit their bids prior to the specified Closing
    Date for Receipt of Bids.
    B. Utah County and/or its representatives will evaluate all submitted bids to
    determine acceptance or rejection of the bids.
    C. The selected bidder(s) will be required to sign an agreement, a sample of which is
    included as Exhibit C.
    1.3 RULES OF PROCUREMENT
    A. This procurement shall conform to and is governed by The Utah County Division of
    Purchasing, Procurement Rules and Regulations.
    B. For this procurement, all bids must be submitted in the bid format outlined herein.
    C. All prospective bidders must meet the required criteria as of the date of submission.
    D. Respondents must provide all information requested in the Contractor Information
    Form.
    E. Utah County has established certain requirements with respect to bids to be submitted
    by respondents. The use of "shall", "must", or "will", in this ITB indicates a
    requirement or condition from which a material deviation will not be approved by
    Utah County.
    1.4 BID ORGANIZATION
    A. Each respondent must submit its proposal digitally through the U3P website using the
    State of Utah's Bonfire (EUNA) account. The proposal must be submitted by
    Tuesday, May 19, 2026, at 3:00pm.
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 4

    B. Please submit with the bid the documents listed below. Before a contract can be
    awarded, the selected contractor must provide all the documents listed below.
    1. Completed Contractor's Cost Proposal (Attachment B).
    2. Completed Contractor Information Form (Exhibit A).
    3. Completed Certificate of Non-Collusion (Exhibit B).
    4. A copy of the bidder's current local business license.
    5. A copy of the bidder's current Contractor License issued by the Utah Department
    of Commerce, Division of Occupational and Professional Licensing.
    6. Proof of required insurance.
    7. Documentation from the County Treasurer of the bidder's county showing that
    bidder is current on its personal property taxes.
    8. Documentation of minimum of three years' experience.
    9. List of three similar projects, including contracting agency and contact
    information.
    1.5 PROPRIETARY INFORMATION
    The Contractor shall mark proprietary information contained in the bid which is not to be
    disclosed to the public or used for purposes other than the evaluation of the bids. Pricing
    and service elements of the successful bid will not be considered proprietary.
    1.6 QUESTIONS AND CLARIFICATIONS
    A. All questions regarding this ITB must be submitted through the Utah Procurement
    Place (U3P) Bonfire (EUNA) website or to the Utah County Purchasing Manager,
    Robert Baxter, at RobertB@utahcounty.gov. The deadline for submission of
    questions is end of business day Friday, May 15, 2026.
    B. Bidders are urged and expected to inspect the site where services are to be performed
    and to satisfy themselves as to all general and local conditions that may affect the cost
    of performance of the Agreement, to the extend such information is reasonably
    obtainable. In no event will a failure to inspect the site constitute grounds for
    withdrawal of a bid after opening, or for a claim after award of the agreement.
    1.7 ACCEPTANCE OF BID
    A. Utah County reserves the right to reject any or all bids or waive minor irregularities
    when to do so would be in the best interests of Utah County. Minor irregularities are
    those which will not have a significant adverse effect on overall competition or
    performance levels.
    B. The responding party agrees that Utah County may terminate this procurement
    procedure at any time, and Utah County shall have no liability or responsibility to the
    responding party for any costs or expenses incurred in connection with this ITB, or
    such party's response.
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 5

    1.8 DISQUALIFICATION OF BID
    The occurrence of any of the following may result in disqualification of a bid:
    A. Failure to respond within the established timetable.
    B. Failure to completely answer all questions presented in the ITB.
    C. Use of any other type of form or format other than those indicated in the ITB.
    D. Failure to provide requested documentation at the time of bid submission.
    E. Illegible responses.
    F. If the bidder adds any provisions reserving the right to accept or reject an award, or to
    enter into an agreement pursuant to an award, or any other unauthorized conditions,
    limitations or provisions.
    G. If the bidder is unable to evidence a satisfactory record of integrity.
    H. If the bidder is not qualified legally to contract.
    I. If the bid at the opening does not contain a signed bid, and a signed certificate of non-
    collusion.
    J. Utah County reserves the right to reject any or all bids.
    1.9 DISPOSITION OF BIDS
    All bids (and the information contained therein) shall become the property of Utah
    County. No bid shall be returned to the respondent regardless of the outcome of the
    selection process.
    1.10 INTERPRETATION OF ITB
    The invalidity of any portion of this ITB shall not prevent the remainder from being
    carried into effect. Whenever the context of any provision shall require it, the singular
    number shall be held to include the plural number, and vice versa, and the use of any
    gender shall include all genders. The paragraph and section headings in this ITB are for
    convenience only and do not constitute a part of the provisions hereof.
    1.11 REQUIRED EXPERIENCE
    A. The Contractor must have a minimum of three (3) years' experience in the work
    specified herein. Proof of experience must be submitted with each bid.
    B. The Contractor shall provide a list of at least three (3) projects similar to Utah
    County's as set forth herein, including contracting agency and contact information for
    each.
    C. The Contractor shall be the general contractor for the project and is required to have a
    current local business license from the jurisdiction in which their business is located.
    A copy of the bidder's current local business license must be submitted with the bid.
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 6

    1.12 EVALUATION CRITERIA
    All bids will be evaluated by authorized representatives of Utah County for compliance
    with the terms and conditions contained in this ITB, and the resulting agreement awarded
    to the lowest responsive and responsible bidder. Utah County reserves the right to award
    to more than one Contractor if it is in the best interest of the County.
    1.13 GENERAL
    A. Utah County will award a contract in reliance upon the information contained in bids
    submitted in response to the ITB. Utah County will be legally bound only when and
    if there is a signed agreement entered into between Utah County and the awarded
    bidder(s).
    B. It is vitally important that any person who signs a bid or agreement on behalf of a
    respondent certifies that he or she has the authority to so act. The bidder who has its
    bid accepted may be required to answer further questions and provide further
    clarification of its bid and responses.
    C. Receiving this ITB or responding to it does not entitle any entity to participate in
    services or transactions resulting from or arising in connection with this ITB. Utah
    County shall have no liability to any person or entity under or in connection with this
    ITB, unless and until Utah County and such person have executed and entered into an
    agreement pursuant to the terms of this ITB.
    D. By responding to this ITB each responding party acknowledges that neither Utah
    County nor any of its representatives is making or has made any representation or
    warranty, either express or implied, as to the accuracy or completeness of any portion
    of the information contained in this ITB. The responding party further agrees that
    neither Utah County nor any of its representatives shall have any liability to the
    responding party or any of its representatives as a result of this ITB process or the use
    of the information contained in this ITB. Only the terms and conditions contained in
    an agreement when, as, and if executed, and subject to such limitations and
    restrictions as may be specified therein, may be relied upon by the respondent in any
    manner as having any legal effect whatsoever.
    1.14 BONDS
    A. Before this contract is awarded by Utah County, the Contractor shall furnish to Utah
    County the following bonds:
    1. A performance bond satisfactory to the County in an amount equal to 100% of
    the price specified in the contract, to assure the faithful performance of the
    contract, for the protection of Utah County, to be held until final acceptance
    by Utah County of all aspects of this project; and
    2. A payment bond satisfactory to the County in an amount equal to 100% of the
    price specified in the contract, for the protection of each person supplying
    labor, service, equipment, or material for the performance of the work
    provided for in the contract.
    B. Each bond shall be:
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 7

    1. Binding upon the award of the contract.
    2. Executed by a surety company or companies duly authorized to do business in
    the State of Utah, or, in the form or cash or other certified funds.
    3. Payable to Utah County, A Body Corporate and Politic.
    4. Filed with the Utah County Public Works Department in a timely manner
    following the Closing date for Receipt of Bids.
    5. Increased if the contract price is increased by change order or otherwise
    subsequent to entering into the contract.
    C. Utah County will hold the Payment Bond for 90 days subsequent to the completion of
    the project.
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 8

    Overhead & Profit Commission
    To prime Contractor on work performed by subcontractors 0% 10%
    To prime Contractor or subcontractor for that portion of work performed with their respective forces 10% 0%

    GENERAL REQUIREMENTS
    Alteration of Plans or Character of Work
    The County Commission, after recommendation by the County Public Works Director,
    reserves the right to make at any time during the progress of the work, such increases or
    decreases in quantities and such alterations in the details of construction, and the elimination
    of one or more items as may be found necessary or desirable. Such alterations shall not be
    considered as a waiver of, nor release of, the surety. The Contractor agrees to accept the
    work as altered the same as if it had been a part of the original Agreement. The Contractor
    shall proceed with the work alterations when ordered in writing. Financial increases to this
    Agreement must be approved in writing by the County Commission before additional
    work is authorized and constructed.
    Brand Name
    The use of brand names in the Specifications is for the purpose of designating the standard
    of quality, performance, and characteristics desired. Equivalent brand substitutions for
    products must be approved by Utah County.
    Change Orders
    Utah County may at any time, without notice to any sureties, by written order designated or
    indicated to be a change order, make changes to the work within the general scope of the
    contract, and to the contract amount and/or contract deadlines.
    The overhead, profit, and commission fees included in any change order bid shall not exceed
    the maximum percentages of the net cost of the bid as shown in the following table:
    Overhead &
    Commission
    Profit
    To prime Contractor on work performed by
    subcontractors 0% 10%
    To prime Contractor or subcontractor for that
    portion of work performed with their
    respective forces 10% 0%
    Only the Contractor or subcontractor who actually performs or furnishes the work may charge
    for overhead or profit regardless of the number of tiers of subcontractors, that is, the markup
    on work subcontracted by a subcontractor will be limited to one charge of 10% for overhead
    and profit and one charge of 10% for the prime Contractor's commission.
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 9

    Overhead and profit includes but is not limited to:
    A. Estimating.
    B. Field supervision above foreman level superintendents, assistant superintendents, general
    foremen, engineers, accountants, timekeepers, office manager, and other staff.
    C. Office supplies.
    D. Drinking water.
    E. Temporary heat, light, and power.
    F. Field toilets.
    G. Small tools.
    H. Other costs of materials and/or equipment associated with performance of the contract.
    On bids covering both increases and decreases in the contract amount, the overhead and profit
    shall be computed on the net change only.
    Each change order shall be signed by the Contractor, the County Public Works Director, and
    the County Commission, and payment and performance bonds shall be increased by the
    Contractor to reflect any increase to the contract amount before the Contractor will be
    authorized to proceed with the work specified therein.
    Failure of Contractor and the County to agree on an adjustment of contract amount or contract
    deadlines shall not excuse Contractor from proceeding with prosecution and performance of
    work. Contractors, subcontractors, and suppliers shall handle all disputes in a manner which
    will permit work to proceed on schedule while the matter in dispute is being resolved.
    The County shall have the right, within its sole discretion, to require the Contractor to
    commence performance of changes to work based on County requirements prior to the
    submission of a cost bid by the Contractor to the County, or approval of the cost bid by the
    County. In such case, Contractor shall proceed with the work so changed upon receipt of a
    Construction Change Directive from the County and thereafter submit to the County as soon
    as possible any cost bid required.
    Completion Date
    The completion date for the Spanish Fork River Park Pipe Fence is on or before October 15,
    2026, regardless of weather conditions and other related problems. If the Contractor fails to
    complete the work on or prior to the completion date, or by extension of time granted by
    the County in writing, then the Contractor may forfeit his or her 5% payment retainer and
    shall in addition be liable for all additional costs and damages incurred by Utah County as a
    result of the failure of completion.
    If abnormal weather conditions or other natural events totally beyond the control of the
    Contractor require, in the judgment of the County, an extension of the completion date,
    written authorization must be given by the County for such specific extension.
    Invitation to Bid: Spanish Fork River Park Pipe Fence P ag e | 10

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    Follow Silver Lake Restroom Roof Replacement Active Contract Opportunity Notice ID 1240LT26Q0120 Related

    AGRICULTURE, DEPARTMENT OF

    Bid Due: 8/10/2026

    Project: Salt Lake City Request for Bid SLCI27012 Fencing Supplies and Installation Ref.

    State Government of Utah

    Bid Due: 8/14/2026

    Project: SLCo PWO130995-1 Asphalt Concrete Mix - RFC Ref. #: SLCo PWO130995-1 Asphalt

    State Government of Utah

    Bid Due: 12/31/2026

    Project: NSD Testing & Special Inspection of Construction Materials RFP Ref. #: NSDRP26-0708

    State Government of Utah

    Bid Due: 8/11/2026