Southwest Water Treatment Plant Upgrades and Treatment Improvement

Agency: Toho Water Authority
State: Florida
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Feb 15, 2026
Due Date: Mar 19, 2026
Solicitation No: RFQu-26-004
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Project: Southwest Water Treatment Plant Upgrades and Treatment Improvement
Ref. #: RFQu-26-004
Type: RFSQ
Status:
Open
Open Date: Feb 15th 2026, 8:00 AM EST
Questions Due Date: Feb 27th 2026, 5:00 PM EST
Close Date: Mar 19th 2026, 2:00 PM EDT

Project Description: The existing Southwest Water Treatment Plant (WTP), located at 7325 Osceola Polk Line Road, Davenport FL, has a maximum daily flow capacity of 8.64 million gallons per day (MGD). Its current treatment process includes two offsite groundwater wells (SW-1 and SW-2), along with ozone (currently non-operational since 2023), sodium hypochlorite, Ground Storage Tank (GST) for storage, and high service pumps to discharge to the distribution system. A third well (SW-5) has been drilled onsite but is not yet equipped with a pump and associated raw water pipe and remains inactive.
Currently, the plant’s reliable capacity is insufficient to meet demand when one well is offline. Additionally, water from well SW-2 contains elevated levels of hydrogen sulfide (H₂S), which requires treatment.
To enhance performance, reliability, and water quality, the proposed upgrades will:
• Install a forced draft aeration system for H₂S removal with associated odor control system
• Construct a transfer pump station to convey treated water to the existing ground storage tank
• Implement stormwater and yard piping and valves improvements
• Construct a lift station and associated piping to the existing force main
• Associated site work, electrical, and instrumentation and controls
The scope of the project is to provide Construction Management at Risk (CMAR) pre-construction and construction services for the upgrades of Southwest WTP and treatment improvements project. The scope of work also includes early procurement of the forced draft aeration, odor control system, and possibly other equipment with long lead time.


* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Description: Water Treatment Plant No. 2 Expansion Construction Manager a Department: Water Utilities

Palm Beach County

Bid Due: 10/07/2029

Description: Water Treatment Plant No. 2 Expansion Construction Manager a Department: Purchasing Buyer:

Palm Beach County

Bid Due: 7/01/2030

Description: Water Treatment Plant 11 Upgrades Progressive Design Build Department: Water Utilities Buyer:

Palm Beach County

Bid Due: 4/22/2029

Description: Water Treatment Plant 11 Upgrades Progressive Design Build Department: Water Utilities Buyer:

Palm Beach County

Bid Due: 1/31/2030