25-045 South Palafox Pedestrian Improvements: Garden Street to Main Street
| Agency: |
City of Pensacola |
| State: |
Florida |
| Type of Government: |
State & Local |
| NAICS Category: |
- 236220 - Commercial and Institutional Building Construction
- 237110 - Water and Sewer Line and Related Structures Construction
- 237310 - Highway, Street, and Bridge Construction
- 237990 - Other Heavy and Civil Engineering Construction
- 238910 - Site Preparation Contractors
|
| Posted Date: |
Sep 3, 2025 |
| Due Date: |
Oct 2, 2025 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
|
Bid Title:
|
25-045 South Palafox Pedestrian Improvements: Garden Street to Main Street
|
|
Category:
|
Bids
|
|
Status:
|
Open
|
|
Description:
|
|
The South Palafox Street Pedestrian Improvements Project aims to enhance pedestrian and vehicular circulation in downtown Pensacola, Florida, along South Palafox Street and adjacent areas, while incorporating additional pedestrian safety upgrades. The project focuses on improving the pedestrian experience through thoughtful landscape architecture and engineering services. The design areas include:
South Palafox Street: From south of Garden Street to north of Main Street.
Romana Street: Between Baylen Street and Jefferson Street.
Intendencia Street: Between Baylen Street and Jefferson Street.
Government Street: Between Baylen Street and Jefferson Street.
Intersections: South Palafox Street at Garden Street and South Palafox Street at Main Street.
Additional Areas for Bollard Placement: Along Zarragossa and Garden Streets, as identified in coordination with City staff and the Pensacola Police Department.
The contractor will execute the construction based on the Release for Construction (RFC) set prepared by Baskerville-Donovan, Inc. (BDI) and Jerry Pate Design (JPD). The RFC set is organized into phases (A through I), with each phase representing a miniature plan set covering a block-to-block segment. This structure provides the contractor flexibility to begin and end work in distinct phases, minimizing disruption to the surrounding area. The contractor must ensure compliance with the City of Pensacola codes, Florida Department of Transportation (FDOT) standards, and the project’s conceptual design.
|
|
Publication Date/Time:
|
|
9/3/2025 8:00 am
|
|
Closing Date/Time:
|
|
10/2/2025 2:30 pm
|
|
Related Documents:
|
|
|
|
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.
Sign-up for a Free Trial, Government Bid Alerts
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Try One Week FREE Now
See Also
Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:
City of St. Petersburg
Bid Due: 6/09/2026
RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View
City of Tampa
Bid Due: 6/11/2026
Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to
Orange County
Bid Due: 6/04/2026
Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract
DEPT OF DEFENSE
Bid Due: 6/09/2026