SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS
For March 10, 2026
Letting Location:
SCDOT Headquarters Building
Conference Room 331
955 Park Street, Columbia, SC
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted
on the SCDOT web site, Bid Express, and the Construction Extranet immediatley after bids are opened.
The following items will be made available on February 10, 2026 unless otherwise noted:
• Proposal bid forms on the Bid Express website (www.bidx.com)
• Construction Standards can be found under Business via SCDOT web site (www.scdot.org)
Access the Construction Extranet (https://www.scdot.org/business/constructionletting-extranet.aspx). for the
following items:
• Proposals
• Plans
• Announcements
• Bids as Received
• CPM Schedule Templates
• Contractor Discussin Board
Contractors are encouraged to utilize the Discussion Board to make contact with other Prime and
Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a
user name and password.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)
issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter
issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-
2031.
Hardcopy plans and proposals are available via Engineering Publications:
o Printed upon request only, call ahead for pickup orders
o Located in room G23 SCDOT Headquarters
o Email PlanStorage@scdot.org /Phone (803)737-4533/ Fax (803)737-4530
o Proposals are $15 and Plans are $2 per sheet
o Cash, check, money order, VISA/MC accepted payable to SCDOT (No refunds)
o Contractors do not have to buy plans to be able to bid
o The Voluntary Plan Holders List is available on BIDX.
Please contact the Contract Administration Office at (803)737-7469 with all Letting related questions.
South Carolina Department of Transportation
2/3/2026
Call No.: 010
Letting Date: March 10, 2026
Letting Time: 2:00 pm
Page: 1
SC File NO(S).: 0276160
DBE Goal Percent: 0.00%
Approx. Length (miles):12.4400
CO(S).: Aiken
PCN: P042976
PCN: P044645
PCN: P044915
PCN: P044918
PCN: P044919
Project No.: P042976
Project No.: P044645
Project No.: P044915
Project No.: P044918
Project No.: P044919
Description: 2026 AIKEN REHAB/PM 10/31/2025 2:58:08 PM
Completion Date: 6/30/2027 Days
Funding: ST
ITEMS OF WORK INCLUDE THE FOLLOWING:
Description
MOBILIZATION
BONDS AND INSURANCE
REMOVAL & DISPOSAL OF EXISTING PAVEMENT
REMOVAL & DISPOSAL OF EXISTING CURB
REMOVAL OF EXIST. GUARDRAIL
BORROW EXCAVATION
EXCAVATION FOR SHOULDER PAVING
HAULING OF EXCAVATED SHOULDER MATERIAL
MAINTENANCE STONE
HMA SHOULDER WIDENING COURSE
LIQUID ASPHALT BINDER PG64-22
ARAMID FIBER
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF.
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
MILLING EXISTING ASPHALT PAVEMENT 1.5"
MILLING EXISTING ASPHALT PAVEMENT 2.0"
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
ASPHALT SURFACE COURSE TYPE B
ASPHALT SURFACE COURSE TYPE D
DRIVEWAY PAVING-SURFACE TYPE C
DRIVEWAY PAVING-SURFACE TYPE D
TRAFFIC CONTROL
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
Quantity Units
1.000 LS
1.000 LS
85.000 SY
40.000 LF
4,285.000 LF
2,612.000 CY
350.592 STA
350.592 STA
44.330 TON
2,072.107 TON
1,919.985 TON
7,515.000 LB
540.000 SY
1,620.000 SY
3,290.000 SY
9,080.000 SY
168,880.000 SY
23,500.000 SY
27,057.466 TON
3,622.820 TON
348.000 TON
1,089.375 TON
1.000 LS
2,348.000 SF
20,860.000 LF
206,800.000 LF
120.000 LF
1,220.000 LF
3,290.000 LF
92.000 EA
South Carolina Department of Transportation
2/3/2026
Call No.: 010
Letting Date: March 10, 2026
Letting Time: 2:00 pm
Page: 2
Description
WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
BIKE LANE SYMBOL - FAST DRY PAINT
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT
24" YELLOW DIAGONAL LINES - FAST DRY PAINT
4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING
4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING
8" WHITE SOLID LINES PERM.PVMT.MARKINGS
24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING
WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING
WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING
WHITE WORD MESSAGE "STOP" -PERM.PVMT.MARKING
WHITE COMBINATION ARROWS(STR&RT.OR STR<)PERM.PVMT.MARKING
4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING
4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING
24" YELLOW SOLID LINES - PERM.PVMT.MARKING
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL.
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL.
6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL.
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
MILLED-IN RUMBLE STRIP
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
SAWCUT FOR LOOP DETECTOR
13"X24"X12"D.ELEC.FLUSH UNDGRD.ENCLOSURE-(STR.POLY.CONC.)HD
CONCRETE CURB AND GUTTER(2'-0") SLOPING FACE
CONCRETE SIDEWALK(6" UNIFORM)
Quantity Units
42.000 EA
28.000 EA
8.000 EA
26.000 EA
16,900.000 LF
243,420.000 LF
1,425.000 LF
1,000.000 LF
1,400.000 LF
600.000 LF
47,130.000 LF
23,930.000 LF
610.000 LF
1,550.000 LF
44.000 EA
13.000 EA
2.000 EA
4.000 EA
1,350.000 LF
85,850.000 LF
500.000 LF
8,430.000 LF
550.000 LF
31,850.000 LF
190.000 LF
2.000 EA
1.000 EA
7,100.000 LF
710.000 LF
35,150.000 LF
1.000 LS
600.000 EA
730.000 EA
1,792.000 EA
16.170 MI
140.000 LF
10,200.000 LF
3,400.000 LF
5.000 EA
40.000 LF
10.000 SY
South Carolina Department of Transportation
2/3/2026
Call No.: 010
Letting Date: March 10, 2026
Letting Time: 2:00 pm
Page: 3
Description
DETECTABLE WARNING MATERIAL
PEDESTRIAN RAMP CONSTRUCTION
MT3 LEADING END TREATMENT TL3
MB TRAILING END TREATMENT
MGS3 GR STANDARD SHOULDER
MGS3CS GR COMPRESSED SHOULDER
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3
PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS
Quantity Units
37.500 SF
75.000 SY
12.000 EA
4.000 EA
350.000 LF
3,350.000 LF
4.000 EA
11.890 ACRE
South Carolina Department of Transportation
2/3/2026
Call No.: 020
Letting Date: March 10, 2026
Letting Time: 2:00 pm
Page: 1
SC File NO(S).: 0676010
DBE Goal Percent: 0.00%
Approx. Length (miles):10.4500
CO(S).: Barnwell
PCN: P044933
PCN: P044934
PCN: P044935
Project No.: P044933
Project No.: P044934
Project No.: P044935
Description: 2026 BARNWELL PAVEMENT IMPROVEMENT
Completion Date: 6/30/2027 Days
Funding: ST
ITEMS OF WORK INCLUDE THE FOLLOWING:
Description
MOBILIZATION
BONDS AND INSURANCE
REMOVAL & DISPOSAL OF EXISTING PAVEMENT
REMOVAL OF EXIST. GUARDRAIL
BORROW EXCAVATION
EXCAVATION FOR SHOULDER PAVING
HAULING OF EXCAVATED SHOULDER MATERIAL
MAINTENANCE STONE
HMA SHOULDER WIDENING COURSE
LIQUID ASPHALT BINDER PG64-22
ARAMID FIBER
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF.
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
MILLING EXISTING ASPHALT PAVEMENT 2.0"
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
ASPHALT SURFACE COURSE TYPE B
ASPHALT SURFACE COURSE TYPE C
ASPHALT SURFACE COURSE TYPE D
DRIVEWAY PAVING-SURFACE TYPE B
DRIVEWAY PAVING-SURFACE TYPE D
TRAFFIC CONTROL
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
Quantity Units
1.000 LS
1.000 LS
775.000 SY
1,370.000 LF
1,762.000 CY
849.024 STA
849.024 STA
44.950 TON
5,482.987 TON
1,607.149 TON
3,880.000 LB
3,405.000 SY
790.000 SY
300.000 SY
61,070.000 SY
10,300.000 SY
13,699.547 TON
5,525.300 TON
2,831.740 TON
144.000 TON
606.875 TON
1.000 LS
2,348.000 SF
21,140.000 LF
150,180.000 LF
2,940.000 LF
3,540.000 LF
18.000 EA
10.000 EA
6.000 EA
16,140.000 LF
114,400.000 LF
This page summarizes the opportunity, including an overview and a preview of the attached documents.