Sources Sought - Mud Mountain Dam Bridge Repair
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Washington |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Oct 11, 2025 |
| Due Date: | Oct 31, 2025 |
| Solicitation No: | W912DW26R1ASE |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Oct 11, 2025 07:54 am PDT
- Original Response Date: Oct 31, 2025 11:00 am PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Nov 15, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Enumclaw , WA 98022USA
This is a SOURCES SOUGHT ANNOUNCEMENT and is for informational and market research purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The proposed action will be a construction project with a firm-fixed price contract. The type of solicitation to be issued will depend upon information received in response to this sources sought announcement. No reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information.
Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. This is not a request to be placed on a solicitation mailing list and is not to be construed as a commitment by the Government. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. The purpose of this sources sought announcement is to gain knowledge of potentially qualified Small Business, 8(a), Woman Owned Small Business, Service-Disabled Veteran Owned Small Business, and HUBZone contractor sources; as well as their size classifications relative to the NAICS code 237990 (Other Heavy and Civil Engineering Construction), FSC code Y1PZ (Construction of Other Non-Building Facilities), and a Small Business Size Standard of $45.0 Million. Depending upon the responses associated with the business categories listed above, the solicitation will either be set aside in one of those categories or be issued as unrestricted and open to both small and large businesses. After review of the responses to this announcement and if the Government still plans to proceed with this project; a separate solicitation announcement will be published on ww.sam.gov. Responses to this announcement are not an adequate response to any future solicitation announcement.
PROJECT DETAILS:
The purpose of this project is to provide a repair to the Mud Mountain
Dam Bridge Pier located at the outlet of the 9 ft tunnel. The scope includes the design of the
bridge pier repair, completion of environmental consultation, award of a construction
contract, construction oversight and contract closeout.
The MM05 Outlet Works Bridge at Mud Mountain Dam is a two-span bridge that carries
equipment and personnel over the discharge of the 9 ft tunnel for access to the 23 ft tunnel.
Each span has two prestressed concrete girders with a CIP concrete deck. These spans are
supported by reinforced concrete abutments at the ends and a single reinforced concrete
column at the center pier. Over time, the sediment-laden flow from the 9 ft tunnel has
destroyed the stainless-steel pier nose guard and has eroded the concrete pier to a point where
the rebar cage in the blast zone is fully exposed and undermined. The current estimate is that
rebar is exposed/undermined along 65% of the pier’s perimeter over a height of 10-15 feet.
The bridge was red tagged by the Bridge Safety team in 2022, disallowing use of the bridge
to vehicle and foot traffic. Risk of a bridge collapse exists and increases with each year the
repairs are not made.
The magnitude of construction is expected to be $3.7 Million to $4.3 Million. Main cost
drivers being the in-water work, complexity of the project, and the remoteness of the site.
REQUIREMENTS:
Interested firms should submit a capabilities package, to include the following:
1. Firm's name, address, point of contact, phone number, and email address.
2. CAGE code and UEI number.
3. Firm's interest in bidding on the solicitation if issued.
4. Business classification: Small Business (SB), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone Small Business (HUBZone), 8(a) Program, Other Than Small Business (Large Business).
5. Firm's joint venture information (if interested in being treated as a joint venture the say “YES, we are a interested Joint Venture. Include the JV UEI#, and ensure the projects provided are JV projects).
6. Bonding information (provide bonding limits on the bonding company's letterhead):
a. Single bond
b. Aggregate
c. Point of contact for the bonding company
7. Submit (2) projects similar in scope, and complexity to the project described above, which demonstrates relevant experience in any of the following:
- Projects involving civil construction in water under a bridge repair either in a river, lake, or coastline.
- Projects exceeding $2. Million in repair cost
- Projects with construction new or repair concrete bridge pier
All interested parties who believe they can meet the requirements are invited to submit, in writing, complete information describing their interest and ability to meet all requirements stated above. Prior Government contract work is not required for submitting a response to this announcement.
Submit responses to: Charles Idle, Contract Specialist, via email at charles.d.idle@usace.army.mil Responses should be sent as soon as possible, but no later than 11:00 AM PST, 31 October 2025. Please use “FY26 MMD Bridge Pier Repair - Sources Sought Response” in the email subject line.
All interested firms must be registered in the System for Award Management (www.SAM.gov) and remain active for the duration of the contract to be eligible for Government contracts.
- KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH
- SEATTLE , WA 98134-2329
- USA
- Charles Idle
- charles.d.idle@usace.army.mil
- Phone Number 2063163998
- Oct 11, 2025 07:54 am PDTSources Sought (Original)
- Sep 17, 2025 08:55 pm PDT Special Notice (Original)
See Also
Follow Kalispel Tribe Dike Repair- Pend Oreille County, Washington Active Contract Opportunity Notice
AGRICULTURE, DEPARTMENT OF
Due by 9/21/2026
Solicitation Title Solicitation Type Status Posting Date Open Date Close Date Details KC001691,3
King County
Due by 9/15/2026
Abstract: Construction Solicitation KC001691,2 Title Central Base, Atlantic Base & Non-Revenue UST Improvements
King County
Due by 9/15/2026
09/03/2026 Request for Qualifications (RFQ) for Multiple Airfield Improvements at Spokane International Airport
Spokane International Airport
Due by 10/30/2026