Sommette Distribution Improvements Project ? Final Paving

Agency: Tuolumne Utilities District
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: May 22, 2026
Due Date: Jun 12, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Sommette Distribution Improvements Project – Final Paving

Project Description
Tuolumne Utilities District (TUD) is seeking qualified contractors for the Sommette Distribution Improvements Project – Final Paving. The project scope includes 18,650 sf of trench paving and 12 concrete collars.

Proposal Due Date:
June 12, 2026, at 2:00 PM local time.

Bids
Sealed proposals for the construction of the Sommette Distribution Improvements Project – Final Paving addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on June 12, 2026, and will then be publicly opened and read.

Project Documents:
Contract Documents – Sommette Distribution Improvements Project – Final Paving

For information concerning the proposed work, contact: Mr. Tim McCormick, Engineering Technician, at (209) 532-5536, extension 550 or tmccormick@tudwater.com.

Attachment Preview

CONTRACT DOCUMENTS
Sommette Distribution Improvements Project – Final Paving
TUOLUMNE UTILITIES DISTRICT
May 2026
This page is intentionally left blank.
TABLE OF CONTENTS
PART 1
BIDDING REQUIREMENTS
Invitation to Bid ......................................................................................... B-1
Instructions to Bidders .............................................................................. B-3
Bidder's Checklist ..................................................................................... B-10
Bid Form ................................................................................................... B-11
Bid Schedule ............................................................................................ B-13
Bid Bond ................................................................................................... B-17
Construction Performance Bond .............................................................. B-19
Construction Labor and Material Payment Bond...................................... B-23
List of Subcontractors............................................................................... B-28
Non-collusion Declaration ........................................................................ B-29
Contractor Safety Agreement ................................................................... B-30
Notice of Award ........................................................................................ B-31
PART 2
CONTRACT FORMS
Agreement ................................................................................................ CF-1
Workmen's Compensation Insurance....................................................... CF-5
Public Works Contract Conditions ............................................................ CF-6
California Labor Code: Required Provisions in Public Work Contracts .... CF-7
PART 3
CONDITIONS OF THE CONTRACT
General Conditions................................................................................... GC-1
General Conditions Index ......................................................................... GC-3
Article 1 - Definitions ................................................................................ GC-7
Article 2 - Preliminary Matters .................................................................. GC-9
Article 3 - Correlation, Interpretation & Intent of Contract Documents ..... GC-10
Article 4 - Availability of Lands; Physical Conditions; Reference Points... GC-11
Article 5 - Bonds and Insurance ............................................................... GC-13
Article 6 - Contractor’s Responsibilities .................................................... GC-14
Article 7 - Work by Others ........................................................................ GC-20
Article 8 - Owner’s Responsibilities .......................................................... GC-21
Article 9 - Engineer’s Status During Construction .................................... GC-21
Article 10 - Changes in the Work.............................................................. GC-23
Article 11 - Change of Contract ................................................................ GC-24
Article 12 - Change of the Contract Time ................................................. GC-29
Article 13 - Warranty and Guarantee, Tests and Inspections, Correction,
Removal or Acceptance of Defective Work ........................... GC-30
Article 14 - Payments and Completion ..................................................... GC-33
Unconditional Waiver and Release Upon Final Payment......................... GC-39
Article 15 - Suspension of Work and Termination .................................... GC-41
Article 16 - Claims/Dispute Resolution ..................................................... GC-42
Article 17 - Assignment of Antitrust or Unfair Business Practices Claims
to Owner Under Public Contracts Code § 7103.5 .................. GC-47
Article 18 - Miscellaneous ........................................................................ GC-48
i-1
Supplementary Conditions ....................................................................... SC-1
1. Counterparts of the Agreement ....................................................... SC-1
2. Additional Bond ............................................................................... SC-1
3. Insurance Requirements for Contractor .......................................... SC-1
4. Specifications .................................................................................. SC-4
5. Drawings.......................................................................................... SC-4
6. Owner .............................................................................................. SC-4
7. Engineer .......................................................................................... SC-4
8. Resident Project Representative ..................................................... SC-5
9. Responsibility for Payment .............................................................. SC-5
10. Documentation to Accompany Applications for Payment ................ SC-5
11. Retainage ........................................................................................ SC-5
12. Partial Utilization .............................................................................. SC-5
13. Substantial Completion.................................................................... SC-6
14. Final Inspection and Acceptance..................................................... SC-6
15. Liquidated Damages........................................................................ SC-6
16. Correction Period............................................................................. SC-6
17. Overtime Work................................................................................. SC-7
18. Legal Addresses .............................................................................. SC-7
19. Test Holes ....................................................................................... SC-7
20. Underground Installations................................................................ SC-7
21. Historical or Archaeological Deposits .............................................. SC-7
22. Inspection by Public Agency............................................................ SC-7
23. Layout of Work ................................................................................ SC-7
24. Compaction Testing......................................................................... SC-7
25. Design Engineer .............................................................................. SC-8
26. Measurement and Payment ............................................................ SC-8
27. Submittals and Proposed Equivalents ............................................. SC-9
28. Encroachment Permit ...................................................................... SC-12
29. Staging Area .................................................................................... SC-12
30. Spoils Disposal ................................................................................ SC-12
31. Restoration to Damage Property ..................................................... SC-12
32. Preconstruction Survey ................................................................... SC-12
33. Construction Facilities ..................................................................... SC-12
34. Construction Water .......................................................................... SC-12
35. Traffic Control .................................................................................. SC-12
36. Roadway Cleaning .......................................................................... SC-12
37. Permanent Striping .......................................................................... SC-12
38. Project Areas and Notifications ....................................................... SC-13
39. Hazardous Materials........................................................................ SC-13
40. Sawcut and/or Grind ........................................................................ SC-13
41. Excavation/Dig Outs ........................................................................ SC-13
42. HMA Paving..................................................................................... SC-13
PART 4 TECHNICAL SPECIFICATIONS
DIVISION 1 GENERAL REQUIREMENTS
01010 Summary of Work and Contract Considerations
01140 Environmental Protection
01300 Submittals
01500 Construction Facilities and Temporary Controls
i-2
01700 Contract Closeout
DIVISION 2 SITE WORK
02705 Paving and Surfacing
APPENDIX A
APPENDIX B
APPENDIX C
Exhibit Map
TUD Standard Detail # 201
Hydrant and Water Service Lateral Crossings
i-3
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Number Title Type NAICS Code(s) Due Date Issue Date Status RQ143769(2) FILTER -

LA Metro

Bid Due: 7/01/2026

Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers

San Francisco Public Utilities Commission

Bid Due: 8/05/2026

Project ID: Title: 3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation - OUTREACH UPDATE

Orange County Sanitation District

Bid Due: 7/31/2026

Project ID: 2026-CONRAC-RFQ Title: Request for Qualifications for Progressive Design-Build Services for a

Sacramento County

Bid Due: 8/13/2026