SMD_Sewer Rodding with Water Jetting & CCTV Camera Inspection,Various Queens and Staten Island Developments
| Agency: |
The New York State Contract Reporter |
| State: |
New York |
| Type of Government: |
State & Local |
| NAICS Category: |
- 237110 - Water and Sewer Line and Related Structures Construction
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
- 561621 - Security Systems Services (except Locksmiths)
|
| Posted Date: |
Jun 4, 2025 |
| Due Date: |
Jun 25, 2025 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Description
|
Issue Date: 06/04/2025
|
Contract Number: 514570 & 570571
|
SMD_Sewer Rodding with Water Jetting & CCTV Camera Inspection,Various Queens and Staten Island Developments
Description:
The following items of Work are required and included in this Contract:
-
Removal and disposal of debris including, but not limited to: leaves, wood, plastics, sludge, grease, dirt, and other semi-solid and solidmaterials. 2. Clean existing underground sewer piping from house trap from the building(s) to the connection to the city sewer. The house trap pit shall also be cleaned. 3. Perform close circuit television (CCTV) inspection and video recording of the sewer pipes before and after cleaning. 4. Provide to NYCHA a written report of the condition of all sewers, including any broken or collapsed sewers. Also evaluate the condition of sewers based on video recordings and include these findings in the written report. 5. Provide all equipment, power, etc. to maintain drainage during operations. Provide all temporary by-pass piping, hoses, pumping system, energy, etc., to continuously maintain house sewer service during any interruption of such service. 6. The pipe cleaning can be accomplished by either: (i) Hydro Jetting (high pressure stream of water which is effective against greases and fats); or (ii) rodding of pipe (mechanically breaking down the obstructions within the path of the sewer line). 7. The Contractor, after completion of cleaning of pipes, shall inspect those pipes in question, by camera inspection to observe any potential defects the pipe may have. 8. Prior to rodding, the Contract shall dewater and pump water out of flooded areas (e.g. basement, boiler room, crawl space, etc.) for below grade areas. 9. The Contractor shall also sanitize affected areas as required after the rodding and cleaning of sewers is completed.
-
Section 3 and M/WBE: Please be advised that the Section 3 REO & OEO Plans and the M/WBE Utilization Plan & Waiver and other related documentation must be uploaded via eComply,
https://nycha.ecomply.us/
. Do not include Section 3 or M/WBE documentation within your bid submission via iSupplier. For assistance with eComply log-in, please contact eComply Tech support at
support@ecomplysolutions.com
. For assistance with M/WBE Utilization Plan and Section 3 REO/OEO Plan submission in eComply, please contact NYCHA’s SMP Vendor Diversity team at
eComply.support@nycha.nyc.gov
Due Date: 06/25/2025
10:00 AM
Contract Term: The Term of this contract shall be for a period of three (3) years with up to two (2) one-year renewal periods.
Location: Various Queens and Staten Island Developments
Ad Type: General
|
Primary Contact:
|
New York City Housing Authority
Supply Management Procurement Department
Procurement
Erneste Pierre-Louis
Associate Contract Specialist
90 Church Street 6th Floor
New York, NY 10007
United States
Ph: 212-306-3609
Fax: 212-306-5109
erneste.pierre-louis@nycha.nyc.gov
|
|
Secondary contact:
|
New York City Housing Authority
Supply Management Procurement Department
Procurement
Erneste Pierre-Louis
Associate Contract Specialist
90 Church Street 6th Floor
New York, NY 10007
United States
Ph: 212-306-3609
Fax: 212-306-5109
erneste.pierre-louis@nycha.nyc.gov
|
|
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
12 Title: UH Replace North Penthouse Air Handlers - Phase 1 This is
The New York State Contract Reporter
Due by 9/24/2026
43 Title: 2026 Sewer System Rehabilitation - Hillcrest Interceptor CIPP Lining Repair Note:
The New York State Contract Reporter
Due by 10/05/2026
CUNY Borough of Manhattan Community College Emergency Sewer Repair atTheater 1 & Associated
State Government of New York
Due by 9/22/2026
Form Details (Abstract): RFQ 527261 Status Active Document PDF File Abstract Negotiation Number
City of New York
Due by 9/24/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.