| Agency: | Mc Lennan County |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 9, 2026 |
| Due Date: | May 14, 2026 |
| Solicitation No: | Bid 26-004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
Bid 26-004
|
| Bid Title: |
Sliding Doors, Control Mechanism Replacement
|
| Category: | County Bids |
| Status: | Open |
|
McLennan County
Purchasing Agent, Ken Bass
214 North 5 Street
th
Waco, TX 76701
Phone: 254-759-5627
Fax: 254-757-5068
E-mail: ken.bass@mclennan.gov
McLennan County, BID 26-004
SLIDING DOORS, CONTROL MECHANISM REPLACEMENT, PHASE THREE (3)
Bid Release:
April 9, 2026
Date and Time Bid is Due:
No Later Than
Thursday May 14, 2026
2:00 P.M. CST
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 1 of 34
BIDDER INSTRUCTIONS
A. Invitation to Bid: This Invitation to Bid, is for the convenience of submitting a bid, for the enclosed
BID26-004 - Sliding Doors, Control Mechanism Replacement, Phase Three (3), at the McLennan County,
Highway Six (6) Jail.
A.1. Scope of Work, Addenda/Addendum(s), Specifications and Requirements, may be obtained
from the McLennan County Purchasing Website: https://www.co.mclennan.tx.us/Bids.aspx or by calling us
at (254) 757-5016.
1. It is at the responsibility of a respondent to periodically check the website or call for any
updates or addenda/amendments to this request.
2. Note to Contact Us: If you are downloading this bid and anticipate responding, please
contact, by preferred email, Purchasing Director, Ken Bass, email,
Ken.bass@mclennan.gov and Contract Administrator, Tim Cubos, Tim.Cubos@mclennan.gov or by
phone at (254) 757-5016, for a general idea of responding bidder(s).
B. Onsite Inspection, Pre-Bid, and Walk-Through: A non-mandatory walk-through tour, of the project area for
interested parties will be Thursday, April 23, 2026 at 10:00 a.m.
B.1. Location: McLennan County Highway Six (6) Jail; 3201 E. State Highway Six (6), Waco, TX. 76705.
B.2. Note: Government Identification, such as a state driver's license or state identification card, will be
required. A background check to ensure an individual is authorized to enter the jail, maybe required prior to
entering facility. See "Exhibit 1" for forms to fill out and contact for each person to enter the Jail Grounds
for the Prebid Meeting. Please fill out form and email to Corpral Aron York at aron.york@mclennan.gov
B.3. Walk-through Questions: Please direct any questions to Ken Bass and Tim Cubos at the
above contact information.
B.4. Non-Mandatory: walk-though, although it is recommended that all anticipated and responding
bidders inspect and determine pre-existing conditions, prior to submitting a response.
C. Respondent Responsibility:
C.1. It is the responsibility of each responding firm, before submitting a Bid:
1. Examine thoroughly the documents and other related data identified in the Bid documents.
2. Consider federal, state, and local laws and regulations that may affect costs, progress,
performance or furnishing of the work.
3. Promptly notify Ken Bass and Tim Cubos, by preferred email at the above listed
email addresses or phone number; of all conflicts, errors, ambiguities, or discrepancies which
vendor has discovered in or between the contract documents and such other related
documents.
C.2. Communication and Clarification Questions: Bidder, may submit general/clarification questions
concerning contract information, bid specifications or requirements to Ken Bass and Tim Cubos by
preferred email at the above listed email address or by phone number listed above. Vendors are
encouraged to submit your questions as soon as possible to allow adequate time for answers and any
issues that may arise.
1. Responding Bidder, should inspect and determine pre-existing conditions, prior to submitting a
response.
D. Closing, Submittal and Return of Sealed Bid:
D.1. Closing Date and Time: Sealed Bid, shall be received by the McLennan County Purchasing Department
by closing date and time Thursday, May 14, 2026; 2:00pm (CST)
D.2. Submittal: Submittal(s) should contain one (1) original bid response and one (1) duplicate/copy of the Bid
response, for a total of two (2) complete responses. The original and copy can be in the same sealed
envelope, box or container and should be clearly marked as "Original" and "Copy".
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 2 of 34
D.3. Sealed Bid: Bid(s), shall be received, in a sealed envelope, box or container, at the below address, clearly
and plainly marked: Responding Company Name and Address
McLennan County Purchasing Department
"BID26-004 - "Sliding Doors, Control Mechanism Replacement Phase Three (3)"
214 N. 5th Street, Waco, TX 76701
D.4. Submittal of Confidential Material: Any material that is to be considered as confidential in nature
shall be clearly marked as such by the bidder and will be treated as confidential by McLennan County.
1. Please do not mark entire pages as confidential. Please be specific in the indication of
provided information to be considered and to be kept as confidential.
Please visit Texas Gov't Code Section 552.1101 for information that qualifies as submitted
confidential information.
a. Quick Link Guide: Texas Gov't Code Section 552.1101: Exception: Confidentiality of
Proprietary Information Link: https://texas.public.law/statutes/tex._gov't_code_section_552.1101
b. Complete Texas Code 5 Link: Open Government Code Title 5. Open Government;
Ethics Subtitle A. Open Government; Chapter 522. Public Information; Subchapter A.
General Provisions Link: https://statutes.capitol.texas.gov/Docs/GV/htm/GV.552.htm
D.5. BID Withdrawal, Change and Alternate Bid:
1. Bidders may withdraw Bid responses at any time prior to the official opening.
2. To guarantee the authenticity of the change, responding proposer shall initial alterations made
prior to bid opening date and time.
3. After the official opening, Bids, may not be amended or altered, and may not be withdrawn
without the approval of the McLennan County Commissioners Court.
Link: https://www.co.mclennan.tx.us/182/Commissioners-Court
D.6. Unacceptable Responses: Emailed or faxed Bid, response(s) shall and will NOT be accepted.
D.7. Late Bid(s): Late Bid(s) or Bid(s) not received by closing date and time shall NOT be considered.
McLennan County is not responsible for the lateness of mail carrier, courier, or weather conditions, etc.
E. Public Bid Opening:
E.1. Bid, opening will take place in the Purchasing Department, 214 N. 5th Street, Waco, TX. 76701, Thursday,
May 14, 2026, following 2:00pm closing date and time, at which time bids will be opened and read aloud.
Responding vendors, their representatives and interested persons may be present.
F. Acceptance and Rejection of Bid: It is to be understood, McLennan County reserves the right to accept or
reject any and all bids, as it shall deem to be in the best interest of McLennan County. McLennan County also
reserves the right to waive any technicalities where such is in the County's best interest.
G. Insurance and Workers Compensation: All insurance requirements, including Worker's Compensation, as
outlined in Texas state statutes shall be met by the successful offeror prior to any delivery and shall remain in
effect during the life of this, Contract. Failure to provide the required certificates upon submission of the Bid
may result in the offer being declared non-responsive.
II. GENERAL PROVISIONS
A. The period for acceptance of this Bid will be thirty (30) calendar days unless the bidder notes a different
period for McLennan County Commissioners Court, acceptance and approval.
B. Exceptions: Bid speaks for itself. Bidders who are taking exception to any terms, conditions, requirements or
specifications of this bid, shall clearly state in writing such exception(s) and should be included where indicated in
Section XIII. Statement of Compliance. McLennan County will be the sole judge of the acceptability of any
exception noted and is not bound to consider any bid submitted with exceptions.
C. Alternates: Trade names are used solely for the purpose of setting minimum standards of quality and performance
and are not to be construed as exclusionary. Bidders, are encouraged to contact the Purchasing Director, Ken Bass,
by preferred email at ken.bass@mclennan.gov and Contract Administrator, Tim Cubos, by preferred email at
Tim.Cubos@mclennan.gov, or by contacting us by phone at (254) 757-5016, prior to the bid opening for the purpose
of clarifying specifications.
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 3 of 34
C.1. If a notation of substitution is not made, it is assumed that the Bidder is bidding the item specified.
All substituted items shall be approved by the McLennan County Facilities Director, before shipping,
or the item may not be accepted.
D. McLennan County reserves the right to utilize any referenced business client(s), through-out response
submitted, for past performance.
F. No Commitment by McLennan County: This Invitation to Bid, does not commit McLennan County, to
award any contact, or to pay any costs associated or incurred in the preparation and response to this bid, to
procure or contract for the requested good(s) and/or service(s).
III. SCOPE OF WORK
A. McLennan County, Maintenance of Facilities, for highway six (6) Jail, phase three (3), is seeking the services of a
bonded contractor, to provide service, to replace multiple sliding door control system mechanisms. This project
consists of furnishing all equipment, materials and labor necessary for completion.
B. Contractor shall remove twelve (12) sliding doors currently in place, properly and securely store doors onsite, in a
designated area. Once the doors have been removed and properly stored, awarded vendor, shall replace and install
each control mechanism. Once the control mechanism has been installed and replaced, stored doors are to be
properly reinstalled to a fully functional and operational capacity.
B.1. System shall include a mechanical override, which will be at the sole responsibility of the awarded
contractor. Awarded contractor, shall ensure all proposed options, and are approved by and in accordance
with the Texas Jail Standards, TJS. If perchance, the awarded contractor does not meet TJS, any and all
incurred cost required to meet TJS, as an approved solution, will be the sole responsibility of the awarded
contractor.
C. Hours of delivery/service shall be between 9:00 a.m. and 4:00 p.m. (Central Standard Time Zone, CST) Monday
through Friday, unless otherwise stipulated.
D. The scope of work will consist of, but not limited to the below:
D.1. All power supplies, wiring, and controls will be provided by McLennan County, through a separate vendor.
D.2. Replacement of sliding door operators/controls (twelve (12) unit total).
1. Remove existing doors and store in secure onsite location.
2. Remove and dispose of existing pneumatic sliding devices and housing.
3. Remove and dispose of existing airlines from source to devices.
4. Prime, paint, and repair existing doors as necessary. (Paint to match/flush with existing color)
D.3. Re-install existing doors:
1. Doors to be hooked back up, adjusted, lubricated, tested and to be fully operational and functional.
2. Install new (Southern Steel 3150LXbHC-1) Electromechanical sliding devices with emergency
releases per Southern Steel, specifications.
3. Caulk, prime, and paint all new housing and necessary components.
4. Provide twenty (20) additional emergency release tools.
5. The performance period for this project shall not exceed 180 days, day-for-day, from beginning to
end.
IV. CONTRACT REQUIREMENTS
A. Awarded contractor, shall execute all construction, labor, materials, equipment and services required to complete the
project. The term "work" as used in this Contract Agreement, shall refer to all the construction and services required
by the contract documents for this project, items or trades for which the awarded contractor, is responsible, and all
labor, materials, equipment, and services provided or to be provided by the awarded contractor, to fulfill its
obligations and to provide the complete and functional Project, whether or not expressly set forth in the contract
documents.
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 4 of 34
B. Conduct of the Work: Awarded contractor, shall be responsible for the safety of its employees and subcontractors,
and shall perform the work in accordance with applicable law, codes, ordinances and regulations of the State of
Texas and the United States, and in compliance with OSHA and local regulations and codes, and in compliance with
other laws as they apply to its employees and contractors. Safety precautions at the site are part of the construction
techniques and processes for which the awarded contractor shall be solely responsible. The Contractor assumes
responsibility and liability for workplace safety on the site, and hereby agrees to indemnify Owner and hold Owner
harmless from any liability caused by the awarded contractors, failure to comply with applicable federal, state or local
regulations touching upon the maintenance of a safe and protected working environment and the safe use and
operation of machinery and equipment in that working environment.
C.1. Awarded contractor, is solely responsible for the handling and use of hazardous materials, and waste, and
informing the Owner and his employees of any such hazardous materials or waste. The indemnification
given above shall not in any way limit the general indemnifications set forth in other portions of this
Agreement.
C.2. Awarded contractor, shall supervise and direct the work, using the Contractor's best skill and attention.
Awarded contractor shall be solely responsible for and have control over the construction means, methods,
techniques, sequences and procedures, and for coordinating all portions of the work under this Contract.
C.3. Awarded contractor, shall keep the premises and surrounding area free from accumulation of
waste or materials caused by operations under this Agreement. At the completion of the work, the
Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's
tools, construction equipment, machinery and surplus materials. If the Contractor fails to clean up
the work site as provided in the Contract Documents, the Owner may do so and charge the cost to
the Contractor.
C. McLennan County, Facilities Director, as the Owner's representative, may order minor changes (defined as changes
which involve only aesthetics or matters which do not increase construction costs, and which are agreed in writing by
the Contractor and County Facilities Director to be minor changes) that will not result in a change in the contract
sum or an extension of time for completion, and which are not in material conflict with the plans and specifications or
the purpose of the Project. Such changes shall be ordered in writing by McLennan County Facilities Director, with a
copy to the Owner. Such changes shall not affect the validity of this, Contract Agreement.
D. Awarded contractor, shall provide a minimum of one (1) year warranty on all work performed.
E. Awarded contractor, is responsible for obtaining any and all building permits and inspections, if required.
F.1. Building permits are to be included in the bid price.
F. Essence of Time: Time is of the essence, in the completion of the work/services covered by the Contract.
Awarded contractor shall substantially complete the entire work/services no later than 160 days from the date the
contract is signed by McLennan County Commissioner's Court and a work schedule has been established with
McLennan County Facilities Director.
G.1. Substantial completion is the stage in the progress of the work where this project is sufficiently
complete in accordance with the Contract Documents, so that this project is essentially complete
except for minor items not affecting the integrity of this project.
G.2. Final Completion of the Project shall not be later than thirty (30) days after the Substantial
Completion, unless a different period of time is agreed to by McLennan County and awarded
contractor, in writing.
G.3. Final Completion is the date upon which all work and services remaining to be completed after
substantial completion are completed, and the Project is accepted by the Owner.
G. Texas Commission on Jail Standards: All work shall comply with any applicable regulations of the Texas
Commission on Jail Standards. Awarded contractor, shall be responsible for correcting or replacing work that does
not comply with Commission standards at no additional cost to the Owner. Contractor shall assist the Owner, in
preparing any required submissions to the Commission, and shall be present for the inspection of the work by the
Commission. Link: https://www.tcjs.state.tx.us/jail-standards/
H. Prison Rape Elimination Act (PREA): Awarded contractor and any employees and/or sub-contractors, shall
acknowledge and comply with the PREA, act. PREA act, establishes a zero-tolerance standard against sexual abuse
of incarcerated persons of any age. This makes the prevention of sexual abuse in TJJD facilities a top priority. Link:
https://www.tjjd.texas.gov/index.php/prea
I. Background Checks: There are some McLennan County buildings that require that support personnel and/or
contractors be subject to background checks. All persons assigned to work in some areas such as the McLennan
County, jails and juvenile detention center or are interested in attending the tour of facilities, shall pass a background
check to ensure an individual is authorized to enter the jail and detention facilities.
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 5 of 34
| Commercial General Liability | |
|---|---|
| Bodily Injury & Personal Damage Each Occurrence | $1,000,000 |
| Bodily Injury & Personal Damage General Aggregate P roducts & Completed Operations | $3,000,000 $1,000,000 |
| Medical Expenses | $5,000 |
| Commercial Auto Liability Bodily Injury Each Person Bodily Injury Each Accident Property Damage Each Occurrence Combined Single Limit | $1,000,000 $3,000,000 $1,000,000 $3,000,000 |
| Workers' Compensation Employer's Liability | Per Statutory Provisions $500,000 |
| County and Contractor, shall be additional insurers on liability policies, except workers' compensation Waiver of subrogation against the County required on all insurance, including workers' compensation Thirty (30) day termination notice to insureds, additional insureds and loss payees required. Proof of insurance shall be submitted within 10 days of execution of the contract, and before any work begins. Subcontractors either shall carry workers' compensation insurance or be covered by the CMR's workers' compensation insurance as required by Texas law for public construction projects. |
1. Background Check Form and McLennan County Sheriff Office, Section III Chapter 17: Prison Rape Elimination
Act, RPEA, are attached hereto as Exhibit 1.
2. To assist with time management, applicable background check form, shall be sent to Cpl. Aron York, at
aron.york@mclennan.gov. The email, subject line, should read as "Background Check(s) Bid 26-004 Sliding Doors,
Control Mechanism Replacement, Phase 3 end include form from Exhibit One (1) and a scanned copy of their driver's
license(s), to be attached to email. If you have questions in regard to this process, please email Cpl. Aron York, at
the above email address.
3. Once background check information has been submitted and completed, please send an approved list of names
to Ken Bass, by email at ken.bass@co.mclennan.tx.us and Tim Cubos, by email at tim.cubos@mclennan.gov . The
email, subject line should as Bid 26-004 - Sliding Doors, Control Mechanism Replacement, Phase 3.
V. INSURANCE REQUIREMENTS
The following insurance is required to be provided and maintained:
Commercial General Liability
Bodily Injury & Personal Damage Each Occurrence $1,000,000
Bodily Injury & Personal Damage General Aggregate $3,000,000
P roducts & Completed Operations $1,000,000
Medical Expenses $5,000
Commercial Auto Liability
Bodily Injury Each Person
$1,000,000
Bodily Injury Each Accident
$3,000,000
Property Damage Each Occurrence
$1,000,000
Combined Single Limit
$3,000,000
Per Statutory Provisions
Workers' Compensation
$500,000
Employer's Liability
County and Contractor, shall be additional insurers on liability policies, except workers' compensation
Waiver of subrogation against the County required on all insurance, including workers' compensation
Thirty (30) day termination notice to insureds, additional insureds and loss payees required.
Proof of insurance shall be submitted within 10 days of execution of the contract, and before any work begins.
Subcontractors either shall carry workers' compensation insurance or be covered by the CMR's workers' compensation insurance as
required by Texas law for public construction projects.
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 6 of 34
VI. RETAINAGE/BID BOND, PERFORMANCE AND PAYMENT BOND
Said Bonds shall be executed by a corporate surety or sureties duly authorized by the State of Texas to issue surety bonds.
Said bond(s) shall be in the form required by Texas law, and acceptable to the Owner, and shall be payable to the Owner.
Note: Performance Bond is not required if proposed amount is less than $100,000.
A. Bid Bond(s)/Retainage: The bid bond/retainage, applicable to this Contract Agreement, is five percent (5%)
of the proposed total sum (maximum amount of bid), and shall be held to the completion of the project.
A.1. Owner Representative: McLennan County, Facilities Director, TJ Jackson; 215 N 5th St. Waco, TX.
76701; (254) 757-5055. McLennan County, Facilities Director, TJ Jackson, will be responsible for the
final inspection and acceptance.
B. Performance Bond(s): Responding proposer, shall provide a performance bond in the amount of the bid
conditioned on faithful performance of the work, for this project, in accordance with the plans and contract
requirements. Note: Only if response is in excess of $100,000.
B.1. Owner Representative: McLennan County, Facilities Director, TJ Jackson; 215 N 5th St. Waco, TX.
76701; (254) 757-5055. McLennan County, Maintenance of Facilities Director, TJ Jackson
C. Payment Bond(s): Awarded Contractor, shall provide a payment bond guaranteeing payment of laborers,
contractors, subcontractors, and materialmen in the full amount of the guaranteed maximum price, GMP, for
this project work. If a GMP has not yet been agreed to, the bond shall be in the sum of the project budget.
Once a GMP has been agreed to, the payment bond may be reformed to be in that amount.
VII. INOVICES AND PAYMENTS
A. Awarded Contractor, shall submit an original invoice to McLennan County, Facilities Director, TJ Jackson, on the
completed portion of work as described in the scope of work. Invoices shall be itemized, and for various
portions of the work, prepared in such form approved by, McLennan County, Maintenance of Facilities Director.
A.1. Invoices shall include:
1. Name and address of awarded contractor.
2. Detailed breakdown of all charges for the services or products delivered stating any
applicable period of time.
A.2. Invoice shall be hand delivered or mailed to:
Attention: McLennan County, Facilities Director, TJ Jackson
BID26-004 Sliding Doors, Control Mechanism Replacement Phase Three (3) Invoice
214 N 5th St.
Waco, TX. 76701-1302
B. Payment: Payment will be made upon receipt and acceptance by the McLennan County, Director of
Maintenance, TJ Jackson, of all completed services and/or products ordered and receipt of a valid
invoice, in accordance with the Texas Government Code, Chapter 2251.
Link: https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2251.htm
B.1. Maintenance of Facilities, may refuse to approve payment and may withhold payment in whole or
in part to the extent reasonably necessary to protect McLennan County, if Maintenance of Facilities,
determines that the work has not progressed to the point indicated and/or that the work, or quality
thereof, is not in accordance with the BID, response.
1. Furthermore, Maintenance of Facilities Director may refuse to approve payment, or may nullify in
whole or in part the approval of payment of any invoice previously issued, to such extent as may be
necessary in Maintenance of Facilities Directors, opinion to protect McLennan County, from loss:
a. Defective work not remedied,
b. Third party claims,
c. Failure of awarded contractor, to make payments to subcontractors for labor, materials or
equipment,
d. Reasonable evidence that the work cannot be completed for the unpaid balance of the
proposed total sum,
e. Damage to the County or another contractor caused by the awarded contractor.
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 7 of 34
f. Reasonable evidence that the work will not be completed within the time of completion,
and that the unpaid balance would not be adequate to cover actual or liquidated damages
for the anticipated delay, or
g. Failure to carry out the work in accordance with the Bid response and agreed plans and
specifications.
C. Upon receipt of written notice that the project is ready for final inspection and acceptance, and upon receipt of the
final invoice, from the awarded contractor, Maintenance of Facilities Director, will promptly undertake an inspection
of the project. When Maintenance of Facilities Director, finds the work acceptable under the Bid, response
documents and determines that the work is fully performed, Maintenance of Facilities Director, will promptly
approve the final invoice, stating that to the best of Maintenance of Facilities Directors, knowledge, observations and
inspections, the project has been completed in accordance with the terms and conditions of the Bid response
documents and that the remaining balance of the proposed Total Sum including the retainage is due to the Awarded
Contractor.
D. Substantial or continuing non-performance of the Vendor in complying with the terms of specifications will be a basis
for the termination of the contract by McLennan County. McLennan County will not pay for work, equipment or
supplies that are unsatisfactory. Vendors will be given a reasonable opportunity before termination to correct the
deficiencies. This, however, shall in no way be construed as negating the basis for termination for non-performance.
VIII. GENERAL CONTRACT TERMS AND CONDITIONS
A. This Bid, submitted documents, and any negotiations, when properly accepted by McLennan
County, shall constitute a contract equally binding between the successful proposer and McLennan
County. No different or additional terms will become a part of this contract with the exception of a
Change Order.
B. Performance of Contract: McLennan County reserves the right to enforce the performance of this
Contract, in any manner prescribed by law or deemed to be in the best interest of the county in the
event of breach or default or resulting contract award.
IX. CONTRACT COST/PRICING WORKSHEET (shall be completed and submitted with bid response)
A. Bidder General Information:
Company Name:
Doing Business As (DBA, if applicable):
FEI/SSN: DUNS Number:
(If Applicable: Federal (SAM) Number)
B. Bidder Contact Information:
Address:
City: State: Zip Code:
Contact Name: Contact Title:
E-Mail: Phone Number:
C. Acknowledge Addenda/Amendment (if applicable): Yes No Number acknowledged:
D. In submitting a response, responding bidder(s) acknowledge the terms and conditions of BID26-004; and agree to
furnish labor, materials, equipment and services for the prices indicated below as a Firm and Fixed Price rate.
E. Firm and Fixed Price: No variation of price, nor reconciliation of costs, is permitted without the prior consent of
McLennan County, in writing.
F. All prices are to be firm for the length of the Contract.
G. McLennan County is exempt from taxes; therefore, taxes shall not be included in the bid price and cost submitted.
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 8 of 34
| I.1 Total Price (turnkey, includes labor & materials) (Not including performance and payment bond amount) | $ | ||||
|---|---|---|---|---|---|
| I.2. Performance and Payment Bond Amount (not included in turnkey price above) | $ | ||||
| I.3. Total Price + Performance And Payment Bond amount | $ | ||||
| I.4. Estimated Number of Work Days to Complete Project | |||||
| I.5. Bid is accompanied by certified Check or bid Bond | Please Check Yes or No, Below | ||||
| Yes | No |
H. In accordance with the terms and conditions of BID26-004, Sliding Doors, Control Mechanism Replacement,
Phase Three (3), with full knowledge of the terms and conditions; we agree to furnish labor, materials, equipment
and services for the price indicated below:
I. Total Price (turnkey, includes labor & materials):
I.1 Total Price (turnkey, includes labor & materials)
(Not including performance and payment bond amount) $
I.2. Performance and Payment Bond Amount
(not included in turnkey price above) $
I.3. Total Price + Performance And Payment Bond amount $
I.4. Estimated Number of Work Days to Complete Project
I.5. Bid is accompanied by certified Check or bid Bond Please Check Yes or No, Below
Yes No
J. Acknowledge Standard General Conditions of the Construction Contract? Yes No
K. Acknowledge agreement between Owner and Contractor for construction? Yes No
Notes:
X. References: Please provide three (3) similar project(s) that your company has worked on in the past five:
1. Project One (1)
Government/Company Name:
Contact Person: Title:
Address:
City: State: Zip-code:
Email: Phone:
Date(s) of Service
Scope of Work:
Vendor Notes:
2. Project Two (2)
Government/Company Name:
Contact Person: Title:
Address:
City: State: Zip-code:
Email: Phone:
Date(s) of Service
Scope of Work:
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 9 of 34
| We hereby certify that our Bid, conforms to the Bid, except as specifically detailed below: |
|---|
Vendor Notes:
3. Project Three (3)
Government/Company Name:
Contact Person: Title:
Address:
City: State: Zip-code:
Email: Phone:
Date(s) of Service
Scope of Work:
Vendor Notes:
Note: McLennan County reserves the right to utilize the above information and any referenced information as a reference to verify
work submitted. Emails are typically sent to verify vendor references. It is the responsibility of the respondent to ensure
references are aware of this process.
XI. STATEMENT OF COMPLIANCE FORM
With respect to McLennan County, the following statement shall be signed and submitted as part of your Bid, response: This
BID, shall be in accordance with Texas Government Code; Title 10. General government, Subtitle F. State and Local Contracts
and Fund Management Chapter 2269. Contracting and delivery procedures for construction projects.
Link: https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2269.htm.
Responses shall not be altered following the Bid, opening on Thursday, May 14, 2026; 2:00 P.M. CST, unless
otherwise stated in writing to McLennan County Purchasing Director or McLennan County, Contract Administrator.
In submitting a response to this BID, we demonstrate our full understanding of the requirements, prospective respondents
and offer the services of our firm as capable of meeting the specified needs of McLennan County.
We hereby acknowledge receipt of this Invitation to Bid, (BID), to provide the replacement of mechanisms for the sliding
doors, goods and services for McLennan County, Highway Six (6) Jail. Respondents to this Bid, shall comply with the Bid,
requirements. Failure to do so may result in disqualification from the Bid, l process. A complete copy of this Bid, with a
signed copy of this page shall accompany your Bid, response.
We hereby certify that our Bid, conforms to the Bid, except as specifically detailed below:
McLennan County, BID26-004- Sliding Doors, Control Mechanism Replacement Phase Three (3) Page 10 of 34
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project: PW Gate 1 Turn Lane, City Project No. 104125 Ref. #: 26-0169
City of Fort Worth
Bid Due: 7/30/2026
LOCAL LET MAINTENANCE CONTRACT, BASTROP CO, CRACK SEAL Follow Solicitation Solicitation ID: 6487-41-001_0826
State Government of Texas
Bid Due: 8/12/2026
LOCAL LET MAINTENANCE CONTRACT, BRAZOS CO, DRAINAGE IMPROVEMENT AND/OR REPAIRS Follow Solicitation Solicitation
State Government of Texas
Bid Due: 8/12/2026
Follow Z2DA--Replace Water Heater and Boilers Out Buildings Active Contract Opportunity Notice ID
VETERANS AFFAIRS, DEPARTMENT OF