SLAC Critical Utilities Infrastructure Revitalization (CUIR) – K-5B Substation and Sector 4 Switchgear
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Sep 23, 2025 |
| Due Date: | Sep 30, 2025 |
| Solicitation No: | SLAC_RFP_360342 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Sep 23, 2025 10:31 am PDT
- Original Response Date: Sep 30, 2025 05:00 pm PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Oct 15, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
- NAICS Code:
-
Place of Performance:
Menlo Park , CA 94025USA
This is a Sources Sought Notice to identify subcontractors capable of installing the K-5B Substation and Sector 4 Switchgear under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice.
SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.
BACKGROUND AND PLANNED SCOPE
Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs.
As part of CUIR Subproject 1, SLAC will install a new K5B Substation on the north side of the Klystron Gallery at Sector 9, and a new switchgear system on the south side of Sector 4. The scope includes equipment installation, site and electrical work to integrate with existing systems, and civil and utility modifications to support the new infrastructure.
Both the switchgear and substation equipment are Government Furnished Property (GFP). Certain work must be performed within pre-negotiated power outage windows, requiring careful coordination to minimize impact on ongoing operations.
This project is a project directly funded by the DOE's Office of Science.
SOURCES SOUGHT RESPONSE
Potential bidders will need to meet all necessary criteria outlined in Section L of the draft RFP, which includes:
- Offeror is at least 5 years in business and has at least one office within 200 miles of SLAC for at least 3 years.
Interested subcontractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought Notice. Please provide the following information:
- Company Name
- Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses.
- Bonding capacity
- A statement of your company’s interest in receiving the formal solicitation notice and in submitting a responsive statement of qualifications.
Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PST on September 30, 2025.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this source sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
- 2575 Sand Hill Road
- Menlo Park , CA 94025
- USA
- Quyen Weng
- quyen@slac.stanford.edu
- Sep 23, 2025 10:31 am PDTSources Sought (Original)
See Also
Project ID: 4711 Title: Kiefer Landfill- Module 5, Phase 1 Liner Construction Addenda:
Sacramento County
Due by 10/08/2026
Basic Information Title ASI Wellness Initiative, Project No: FL-2673 Agency CSU, Fullerton Department
State Government of California
Due by 10/30/2026
Project Summary Project ID: BRC0000673 Project Name: Construction Manager at Risk Pre-Construction and
La County
Due by 10/13/2026
Basic Information Title VSP and CCWF New Potable Water Wells Agency Dept of
State Government of California
Due by 10/02/2026