SL District, City of O'Fallon, Roadway reconstruction, sidewalks, storm sewers and inlets, signing and striping, and other miscellaneous work as required to complete the project

Agency: Missouri Department of Transportation(MDOT)
State: Missouri
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Jul 10, 2026
Due Date: Aug 11, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Attachment Preview

INVITATION TO BID
City of O'Fallon
Eggering Drive Reconstruction
City Bid No. 26-039
Sealed bids for project STBG-9901(672) Eggering Drive Reconstruction will be received at O’Fallon City Hall (100
North Main Street, O'Fallon, MO 63366) until 2:00 PM (prevailing local time) on August 11, 2026. At said time and
promptly thereafter, the bids will be publicly opened and read aloud. All bids shall be submitted in paper form.
The proposed work includes: Roadway reconstruction, sidewalks, storm sewers and inlets, signing and striping, and
other miscellaneous work as required to complete the project.
Contract Documents will be available on or before July 10, 2026, and are on file at the office of Drexel Technologies at
http://planroom.drexeltech.com and are open for public inspection. Copies of documents may be obtained from Drexel
Technologies for the fee listed online. Communications between the bidders and the City shall be conducted and
documented in writing through the use of email communication to ekovach@ofallonmo.gov. No oral interpretation will
be recognized.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly
rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial
Relations (Federal Wage Rate), or state wage rate, whichever is higher. The prime contractor must be on MoDOT’s
approved contractor listing. This requirement includes that the contractor has submitted to MoDOT a Contractor
Questionnaire and/or Contractor Prequalification Questionnaire with attachments no later than seven (7) days prior to
the date and hour of the bid opening (see Section 102.2 of the Missouri Standard Specifications for Highway
Construction for more details).
The City of O’Fallon, Missouri hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, disadvantaged business owned and controlled by socially and economically
disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration
for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications
for highway Construction, 2025 Edition including all revisions. The contractor questionnaire must be on file 7 days
prior to bid opening. The project will be awarded to the lowest, responsive, responsible bidder.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA
construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be
completed by their on-site employees within sixty (60) days of beginning work on the construction project.
A certified or cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The City of O’Fallon reserves the right to reject any or all bids.
The DBE goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
Page 2 of 213
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Status Bid Advertisement Post Date Revision Date Letting Date NEW City of Independence,

Missouri Department of Transportation(MDOT)

Due by 9/28/2026

Status Bid Advertisement Post Date Revision Date Letting Date NEW STL District, City

Missouri Department of Transportation(MDOT)

Due by 10/09/2026

Mission Woods Force Main Replacement Project IFB No. 2026-049 StatusAccepting Bids Prebid Date

Drexel Technologies

Due by 10/02/2026

Newton APAC Facility Hauck Avenue - Paving, Sanitary Sewer, & Water Distribution 257044-019

Drexel Technologies

Due by 10/02/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.