| Agency: | County of San Joaquin |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | Jun 29, 2026 |
| Due Date: | Jul 27, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Number | Deadline |
|
SJCDPW-RFP-26-07
Washington Street Improvements (Anteros Avenue to Walker Lane) • New curb, gutter and sidewalk on the north and south sides of the street. • Reconfigured striping to add buffered bike lanes and parking lanes in each direction. • Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections. • Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections. • Add ADA curb ramps at all intersection corners. • Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections. • Add a traffic circle at the Carroll Ave intersection. • Storm drain pipe and inlet installation, as necessary to complete the storm drainage network Del Mar Avenue Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Horner Avenue Improvements (Del Mar Avenue to Walker Lane) • New curb, gutter, and sidewalk along the north side of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Walker Lane Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Engineering services estimated duration………………………………………...Twelve (12) months " data-popup-cssclass="pre-wrap" data-popup-title="Description" style="width:400px; max-width:400px;">The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-07. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Washing Area Complete Streets Project (PROJECT). CONSULTANT will design and engineer the Washington area neighborhood roadway into a "complete streets" corridor, The PROJECT will include the construction of new sidewalks and buffered bike lanes, as well as enhanced intersections throughout the project area. Improvements will be constructed along Washington Street, Del Mar Avenue, Horner Avenue, and Walker Lane. Washington Street Improvements (Anteros Avenue to Walker Lane) • New curb, gutter and sidewalk on the north and south sides of the street. • Reconfigured striping to add buffered bike lanes and parking lanes in each direction. • Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections. • Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections. • Add ADA curb ramps at all intersection corners. • Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections. • Add a traffic circle at the Carroll Ave intersection. • Storm drain pipe and inlet installation, as necessary to complete the storm drainage network Del Mar Avenue Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Horner Avenue Improvements (Del Mar Avenue to Walker Lane) • New curb, gutter, and sidewalk along the north side of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Walker Lane Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Engineering services estimated duration………………………………………...Twelve (12) months |
07/27/2026 11:00 PM UTC |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
RFQ LADWP SIMPLIFIED PURCHASING PROGRAM (SPP) Status Stage Open Posted 6/1/2026 Bid Due
City of Los Angeles
Bid Due: 6/01/2029
RFP-HHS-2026-15 General information Department: Health and Human Services Category: Professional Services Project description:
Marin County
Bid Due: 9/01/2026
Basic Information Title RFP 26-0214801 CalTABS Agency Department of Technology Department Department of
State Government of California
Bid Due: 9/10/2026
Basic Information Title RFP 2526053 Agency State Air Resources Board Department State Air
State Government of California
Bid Due: 9/04/2026