Sheldon Road Profile Raising & Bridge Replacement

Agency: Northeast Ohio Regional Sewer District
State: Ohio
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Aug 18, 2026
Due Date: Sep 16, 2026
Solicitation No: EB-2512
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description


Project ID: EB-2512

Title: Sheldon Road Profile Raising & Bridge Replacement

Addenda: 0

Release Date: 8/18/2026

Due Date: 9/16/2026

Follow
Sheldon Road Profile Raising & Bridge Replacement
Invitation For Bid
Watershed Programs
Project ID: EB-2512
Release Date: Tuesday, August 18, 2026
ยท Due Date: Wednesday, September 16, 2026 1:00pm
Posted Tuesday, August 18, 2026 8:00am
All dates & times in Eastern Time
Draft Response Events RSVP No Bid28 days, 15 hours, 33 minutes


Post Information

Posted At:Tue, Aug 18, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The Sheldon Road Profile Raising & Bridge Replacement Project (Project) is located along Sheldon Road, on the community border of Brook Park and Middleburg Heights. The project is located within the Abram Creek watershed, a tributary to the Rocky River. Local flooding occurs as early as the 2-year storm event along a portion of Sheldon Road, between Eastland Road and Engle Road, leading to impassable flooding of Sheldon Road. A contributing factor to the flooding is the existing cast-in-place reinforced concrete rigid frame (box) structure beneath Sheldon Road, which is in a state of deterioration.

The project involves the construction of a 60' single span prestressed concrete box beam bridge to replace the existing box culvert. This design will result in a bridge structure with a profile set above the 100-year water surface elevation. The Project will also involve raising the profile of a 1,060-feet length of Sheldon Road by an average of 2.97-feet (maximum elevation change 5.53-feet). The raised roadway consists of 2 - 11 ft. lanes with 2 - 4 ft shoulders, 30 ft. total width, with a 1.25 ft wide parapet that does not extend beyond the bridge approach slab. The design includes a 10 ft wide sidewalk across the north side of the bridge/approach slabs and 5 ft. sidewalk on the north roadway approaches.

The objective of this project is to address the structural deterioration of the existing box culvert and improve the conveyance of stormwater flows up to the 100-year design storm, elimination the overtopping of Abram Creek onto Sheldon Road.



Background

The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams.

In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion.

NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.



Timeline

Bid Publish:
August 18, 2026
Pre-Bid Meeting (Non-Mandatory):
August 27, 2026, 10:00am
EMSC 4747 E. 49th St., Cuyahoga Heights, Ohio 44125 Conference Rooms A and B
Question Submission Deadline:
September 4, 2026, 1:00pm
Bid Opening:
September 16, 2026, 1:00pm
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Opening-Construction Inspection and Administration for the replacement of the Main Street Bridge

Allen County

Due by 10/30/2026

General Information Document ID ITB-282-271W906091-4 Status Amended Description Barricading Empty Buildings - Residential

City of Cincinnati

Due by 10/27/2026

Project: Little Miami Wastewater Treatment Plant High-Rate Treatment (LMWWTP HRT) Facility Progressive Design-Build

City of Cincinnati

Due by 11/04/2026

Follow Aerospace Power Systems Laboratory (APSL) Facility Active Contract Opportunity Notice ID 80GRC026R0010

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Due by 10/30/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.