Seymour No. 4 Dam Improvements
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 4, 2026 |
| Due Date: | Mar 18, 2026 |
| Solicitation No: | DEEP020526CM |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Replace the existing spillway with a concrete drop inlet strucure with 48-inch discharge pipe and energy dissipator at the downstream end. A new 16-inch outlet pipe controlled by a stainless steel slide gate will be installed in the drop inlet spillway structure. Installation of a new valve and extension stem on the existing low level outlet upstream of the dam at the bottom of the reservoir. Trees will be cleared from the embankments and the downstream slope will be filled in the vicinity of the new spillway discharge pipe and energy dissipator. Eroded areas on the crest will be repaired, the crest will be raised one foot. Riprap will be placed on the upstream slope. Construction of a 100-foot long auxiliary spillway with concrete core wall. Clear trees and stumps from left dike, topsoil and seeded with grass.
James Heaven James.Heaven@ct.gov
See Also
Number 8749 Title ADA Compliant Bathrooms at the Mattatuck Historical Society Available Date
City of Waterbury
Due by 9/23/2026
Heroes Tunnel Rehabilitation and Route 15 Interchange 46 Improvements Start Date : August
State Government of Connecticut
Due by 9/24/2026
Willow Brook Park Tennis Court Rehabilitation The scope of work generally consists of
State Government of Connecticut
Due by 9/25/2026
Invitation to Bid for Construction Services Old New-Gate: Viets Rehabilitation 106 New Gate
State Government of Connecticut
Due by 10/14/2026