2025 Sewer Lining Project
| Agency: | City of Lebanon |
|---|---|
| State: | New Hampshire |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 12, 2025 |
| Due Date: | Sep 10, 2025 |
| Solicitation No: | 2025-RFx-018 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 2025-RFx-018
Title: 2025 Sewer Lining Project
Addenda: 0
Release Date: 8/12/2025
Due Date: 9/10/2025
The sewer cleaning project in Lebanon, NH aims to improve the city's sewer system by clearing out blockages and debris, reducing the risk of sewage backups and overflows. The project involves the use of specialized equipment and techniques to clean and maintain the city's sewer lines, including highpressure water jets and vacuum trucks. The project is expected to enhance the efficiency and reliability of the sewer system and ensure the proper disposal of wastewater.
This project involves the rehabilitation of existing sanitary sewer infrastructure across six separate locations. The scope includes cured-in-place pipe (CIPP) lining of approximately 4,345 linear feet of sewer mains, broken down as follows:
-
2,600 linear feet of 12-inch diameter pipe
-
1,450 linear feet of 8-inch diameter pipe
-
295 linear feet of 10-inch diameter pipe
In addition to the sewer main lining, the project includes the epoxy coating of five (5) sanitary sewer manholes at a single location to extend the service life of the structures.
A portion of this project is located within an active construction site that is expected to reach substantial completion by the end of November 2025. Work in this area—including the lining from SM-8 to SM-13 and the epoxy coating of manholes—will need to be scheduled between December 2025 and June 1, 2026.
193 Dartmouth College Highway
Lebanon, NH 03766
603-448-3112
See Also
Follow Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Due by 11/23/2026
Laconia 41469 Scope: Address bridge carrying US 3 and NH 11 over Mile
State Government of New Hampshire
Due by 11/19/2026
Follow Interior Painting, Hopkinton-Everett Lakes, Hopkinton and Weare, NH Active Contract Opportunity Notice
DEPT OF DEFENSE
Day Camp Office Wall Repair for Town of Merrimack Parks and Recreation Department.
Town of Merrimack
Due by 11/06/2026