LEGAL NOTICE
INVITATION TO SUBMIT PROPOSALS
The City of Spring Hill will accept quotations for the furnishing and installation of a new Pre-
Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station, located at
Pickett’s Ridge. Bidders shall submit sealed quotations in the format specified in the Invitation to
Submit Quotations no later than January 13, 2026, at 2:00 p.m., at which bids will be publicly
opened and read aloud. No bid may be withdrawn after the scheduled closing time for a period
of 90 days. Bidding documents may be obtained at Spring Hill City Hall during regular business
hours or www.springhilltn.org. Quotations should be mailed or hand delivered to:
Kyle Therriault, Purchasing Agent
City of Spring Hill
Sealed Bid: Pickett’s Ridge Sewer Lift Station Improvements
Bid Due: January 13, 2026 at 2:00 p.m.
199 Town Center Parkway (for hand delivery or courier services)
P.O. Box 789 (for regular mailing services)
Spring Hill, TN 37174
The City of Spring Hill will host a non-mandatory pre-bid meeting on January 7, 2026, at 2:00 p.m. The
meeting will be held at 8060 Station Hill Drive, Spring Hill, Tennessee 37174. Attendance at the pre-
bid meeting is not required in order to submit a quotation; however, prospective bidders are encouraged
to attend.
The City of Spring Hill will not discriminate in the purchase of all goods and services based on race,
color, religion, sex, national origin, age, disability or any other lawfully protected classification.
Verbal quotations and quotations received after the closing date and time will not be accepted. The
City of Spring Hill reserves the right to reject any and all bids, to waive technicalities or informalities,
and to accept any bid deemed to be in the best interest of the City.
1
TABLE OF CONTENTS
Section I: General Information
Section II: Proposal Requirements
Section III: Specification Compliance
Required Forms
Drug-Free Workplace Affidavit
Indemnification Agreement
Certificate of Nondiscrimination Title VI
Compliance Survey
Assurance of Compliance under Title VI
Certificate of Non-Illegal Immigrant Use Certificate of
Non-Collusion
Specifications and Exhibits
• Manufacturer General Performance and Instruction
• Product Specifications
• Execution
• Exhibit – Proposed Layout Plan and Details
2
SECTION I - GENERAL INFORMATION
A. The City of Spring Hill is requesting proposals for the furnishing and installation of a new
Prefabricated Engineered Suction Lift Pump Package withing the existing sewer lift station,
including all accessories and appurtenances, for the upgrade of the existing Pickett’s Ridge
sewer lift station. This installation includes demolition of the existing pump package, site work,
bypass pumping connection installation, and installation of the new pump package.
B. Questions are to be directed to Ryan LaMunyon or Will Brasfield via E-mail:
rlamunyon@springhilltn.org and/or wbrasfield@springhilltn.org. Questions must be in
writing and not verbal. All questions and clarifications will be reviewed and answered directly
and via addendum which will be published on the City’s website prior to bid date.
C. The City of Spring Hill reserves the right to reject any, and all bids, to waive technicalities or
informalities and to accept any bid deemed to be in the best interest of the City. Bids may not
be withdrawn after scheduled closing time for a 90-day period.
D. The bidder shall abide by and comply with the true intent of the specifications and not take
advantage of any unintentional error or omission but shall fully address the full intent and
meaning of each aspect of the specifications.
E. All forms shall be completed and included as an integral part of each bidder’s proposal.
F. Freight shall be paid by the contractor and should be included in the unit price bid.
G. The City is a tax-exempt organization.
H. Mail is delivered after 4:00 p.m. Monday through Friday.
SECTION II – PROPOSAL REQUIREMENTS
Scope: Demolition of existing pumps, piping, and accessories within the station (excluding existing
wet well, gravity lines, and electrical service entrance) to install the new Prefabricated Engineered
Suction Lift Pump Package. The contractor shall provide all necessary items and appurtenances for a
complete installation. Installation of bypass pump connections per plans and specs. The replacement
shall be scheduled during a low flow period as directed and approved by Ryan LaMunyon and Will
Brasfield. Temporary bypass pumping shall be provided by the contractor to maintain sewer
operations. Bypass pumps shall be in place and sized accordingly to accommodate peak flows for the
duration of the project. All measurements shall be confirmed by the contractor by performing
scheduled site visit(s) through Ryan LaMunyon, AGM-Reclamation (931)797-6913, Monday-Friday
8:00am-2:00pm
3
SECTION III – SPECIFICATION COMPLAINCE
The lump sum price quoted shall include removal of the existing pump equipment and all its
components and accessories and installation of the new pump package and accessories, including
controls, electrical, piping, connections, bypass pumping and all necessary accessories, material and
equipment. The lump sum price quoted shall also include a complete installation and startup of all
equipment, specified herein, for the Pickett’s Ridge Sewer Lift Station Improvements by a competent
and experienced contractor. Shop drawings shall be submitted to the City’s consultant Thomas and
Hutton (Ryan Chamblee, P.E., chamblee.r@tandh.com (629) 900-4906) for review and approval prior
to installation of the equipment.
No bidder may withdraw a bid for a period of ninety (90) days after bids have been opened. The City
has the right to reject any/and all bids or to waive all technicalities. The Contractor’s Name and Address
must be placed on the envelope containing their proposal, otherwise the bid will not be opened.
ERROR IN BID - in case of error in the prices in the bid, the written price will govern. No bid shall
be altered, amended, or withdrawn after specified time for opening bids. Negligence on the part of the
bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened.
SPECIFICATIONS - it is understood that reference to specifications shall be sufficient to make the
terms of such specifications binding on the supplier/bidder. In addition to the attached technical
specifications and drawings, the contractor shall adhere to the Spring Hill Standard Specifications for
Sewage Additions, which can be found on the City’s website at
https://www.springhilltn.org/DocumentCenter/View/11057/Approved-Sewer-Specificiations-6-26-24
PROPOSAL BID ITEM:
All equipment and materials shall be installed per the manufacturer’s standards.
4
Bid Proposal
TOTAL INSTALLATION-LUMP SUM-BID COST
(Written Bid in words)
$
In compliance with the conditions stated above and attached specifications and conditions, the
undersigned offers, and agrees, if this bid is accepted within 90 days from opening date, to
furnish and deliver all items at the prices set above.
OWNER CITY OF SPRING HILL
By:
Kyle Therriault, Purchasing Agent
Attest:
City Clerk
Address for giving notices P.O. Box 789
Spring Hill, TN 37174
CONTRACTOR
By: ________________________________
Attest:
Address for giving notices
Agent for service to process:
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.