Seminole Road MSW Landfill 2026 Gas Collection and Control System (GCCS) Expansion
| Agency: | DeKalb County |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 22, 2026 |
| Due Date: | Mar 6, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Seminole Road MSW Landfill 2026 Gas Collection and Control System (GCCS) Expansion
Addenda: 3
Release Date: 1/12/2026
Due Date: 3/6/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The County of DeKalb, GA (the "County"), is soliciting sealed Bids for Seminole Road MSW Landfill 2026 Gas Collection and Control System (GCCS) Expansion . Bids are to be submitted via the County's eProcurement Portal via https://procurement.opengov.com/portal/dekalbcountyga PRIOR TO 3:00 pm on Friday, March 6, 2026 . Late Bids will not be accepted.
The project work to be performed by the Contractor consists of furnishing all labor, materials, equipment, tools, transportation, services, incidentals, and
performing all work necessary to complete the project, in place and ready for service in accordance with the plans and specifications prepared therefor and generally includes but is not limited to the following items:
1. Construction staking/system layout/surveying prior to construction.
2. Installing below grade Polyvinyl Chloride (PVC) and High-Density Polyethylene (HDPE) landfill gas (LFG) extraction wells.
3. Installing below grade HDPE horizontal collectors and rock targets on existing and proposed horizontal collectors
4. Installing below grade HDPE LFG laterals and header, air supply line, and liquid conveyance line.
5. Installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances.
6. Installing new pumps, including tubing, clamps, and related appurtenances.
7. Installing new litter fence and repairing existing litter fence.
8. Installing stationary and portable odor control system.
9. LFG well abandonments.
10. Connection of the Gas Collection and Control System (GCCS) Expansion to the existing GCCS.
11. System start-up and testing
12. Conformance surveying
13. Providing as-built documentation (record drawings)
Timeline
(Meetings are held at 10:00 a.m. and 2:00 p.m.)
Seminole Road Landfill
4203 Clevemont Rd,
Ellenwood, GA 30294
See Also
Follow Notice of Intent to Sole Source - Metrohm - i-Raman NXG 785
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Due by 9/10/2026
Follow 1232SA26Q1380 - Combination Synopsis/Solicitation 8 Channel Spectrophotometer USDA-ARS Athens GA Active Contract
AGRICULTURE, DEPARTMENT OF
Due by 9/16/2026
Follow Notice of Intent to Sole Source - Bioquell an EcoLab solution Active
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Due by 9/15/2026
Project: Abernathy Greenway Southside Improvements Ref. #: 27-004 Type: ITB Status: Open Open
City of Sandy Springs
Due by 9/25/2026