Clark County’s Public Works Department is requesting proposals from qualified firms to provide the design/engineering, real property acquisition, and environmental documentation and permitting necessary to prepare a biddable and constructible set of plans and specifications.
| United Parcel Service / FedEx or Hand Delivery Clark County ATTN: Office of Purchasing 1300 Franklin Street, 6th Floor, Suite 650 Vancouver WA 98660 564-397-2323 | United States Postal Service) Not Available |
|---|
REQUEST for PROPOSAL #958
ARCHITECTURAL AND ENGINEERING SERVICES
Clark County Washington
RELEASE DATE: WEDNESDAY, JUNE 3, 2026
DUE DATE: WEDNESDAY, JULY 8, 2026 by 11:00 am
LATE PROPOSALS WILL NOT BE ACCEPTED - NO EXCEPTIONS
Request for Proposal for:
SELECT DESIGN ENGINEERING SERVICES for NE 179TH STREET
IMPROVEMENTS from VICINITY of NE 29TH AVENUE to VICINITY of
NE 50TH AVENUE (PRJ0003763 / CRP352922)
Federal Aid Number: STBGUL-4247(005)
SUBMIT:
One (1) Original
Four (4) Complete Copies
of the Proposal to:
United Parcel Service / FedEx or Hand Delivery United States Postal Service)
Clark County Not Available
ATTN: Office of Purchasing
1300 Franklin Street, 6th Floor, Suite 650
Vancouver WA 98660
564-397-2323
Office Hours: 8:00 am - 3:00 pm, Monday - Friday, except Legal Holidays.
No electronic email submissions.
Refer Questions to Project Manager:
Clark County, WA local government agency is not affiliated with any group, business or other type of enterprise
that is not listed on our webpage at www.clark.wa.gov and emails must end in @clark.wa.gov.
John Huestis
Capital Project Manager / Public Works
John.Huestis@clark.wa.gov
Phone: 564-397-4364
General Terms and Conditions
ADMINISTRATIVE REQUIREMENTS - Contractors shall comply with all management and INDEPENDENT PRICE DETERMINATION - The prospective contractor guarantees that,
administrative requirements established by Washington Administrative Code (WAC), the in connection with this proposal, the prices and/or cost data have been arrived at
Revised Code of the State of Washington (RCW), and any subsequent amendments or independently, without consultation, communication, or agreement for the purpose of
modifications, as applicable to providers licensed in the State of Washington. restricting competition. This does not preclude or impede the formation of a consortium
of companies and/or agencies for purposes of engaging in jointly sponsored proposals.
ALL proposals submitted become the property of Clark County. It is understood and agreed
that the prospective Proposer claims no proprietary rights to the ideas and written materials INTERLOCAL AGREEMENT - Clark County has made this RFP subject to Washington
contained in or attached to the proposal submitted. Clark County has the right to reject or State statute RCW 39.34. Therefore, the proposer may, at the proposers option, extend
accept proprietary information. identical prices and services to other public agencies wishing to participate in this RFP.
Each public agency wishing to utilize this RFP will issue a purchase order (or contract)
AUTHORSHIP - Applicants must identify any assistance provided by agencies or indivi- binding only their agency. Each contract is between the proposer and the individual agency
duals outside the proposers own organization in preparing the proposal. No contingent with no liability to Clark County.
fees for such assistance will be allowed to be paid under any contract resulting from this
LIMITATION - This RFP does not commit Clark County to award a contract, to pay any
RFP.
costs incurred in the preparation of a response to this RFP, or to procure or contract for
services or supplies.
CANCELLATION OF AWARD - Clark County reserves the right to immediately cancel an
award if the contractual agreement has not been entered into by both parties or if new state LATE PROPOSALS - A proposal received after the date and time indicated above will not
regulations or policy make it necessary to change the program purpose or content, be accepted. No exceptions will be made.
discontinue such programs, or impose funding reductions. In those cases where
negotiation of contract activities are necessary, Clark County reserves the right to limit the ORAL PRESENTATIONS - An oral presentation may be required of those prospective
period of negotiation to sixty (60) days after which time funds may be unencumbered. contractors whose proposals are under consideration. Prospective contractors may be
informed that an oral presentation is desired and will be notified of the date, time and
CONFIDENTIALLY - Proposer shall comply with all applicable state and federal laws location the oral presentation is to be conducted.
governing the confidentiality of information.
OTHER AUDIT/MONITORING REQUIREMENTS - In addition, auditing or monitoring for
CONFLICT OF INTEREST - All proposals submitted must contain a statement disclosing the following purposes will be conducted at the discretion of Clark County: Fund
or denying any interest, financial or otherwise, that any employee or official of Clark County accountability; Contract compliance; and Program performance.
or the appropriate Advisory Board may have in the proposing agency or proposed project.
PRICE WARRANT - The proposer shall warrant that the costs quoted for services in
response to the RFP are not in excess of those which would be charged any other individual
CONSORTIUM OF AGENCIES - Any consortium of companies or agencies submitting a
or entity for the same services performed by the prospective contractor, in a similar
proposal must certify that each company or agency of the consortium can meet the
socioeconomic, geographical region.
requirements set forth in the RFP.
REQUEST for PROPOSALS - This solicitation is an invitation by Clark County for
COST OF PROPOSAL & AWARD - The contract award will not be final until Clark County Proposers to submit an offer, which may be subject to subsequent discussions and
and the prospective contractor have executed a contractual agreement. The contractual negotiations by the County and the Proposer. It is not a request for a competitive bid.
agreement consists of the following parts: (a) the basic provisions and general terms and A Proposal means any document, submittal, interview presentation, negotiation, and
conditions, (b) the special terms and conditions, (c) the project description and goals everything and anything provided in response to this RFP regardless of whether the
(Statement of Work), and (d) the budget and payment terms. Clark County is not submission is an oral or written submission.
responsible for any costs incurred prior to the effective date of the contract. Clark County Clark County reserves the right to accept or reject any or all proposals received as a result
reserves the right to make an award without further negotiation of the proposal submitted. of this RFP, to negotiate with any or all prospective contractors on modifications to
Therefore, the proposal should be submitted in final form from a budgetary, technical, and proposals, to waive formalities, to postpone award, or to cancel in part or in its entirety this
programmatic standpoint. RFP if it is in the best interest of Clark County to do so.
DISPUTES - Clark County encourages the use of informal resolution to address complaints PROTESTS - Must be submitted to the Purchasing Department within 3 business days of
or disputes arising over any actions in implementing the provisions of this RFP. Written receipt of Letter of Notice.
complaints should be addressed to Clark County - Purchasing, P.O. Box 5000, Vancouver, PUBLIC SAFETY - May require limiting access to public work sites, public facilities, and
Washington 98666-5000. public offices, sometimes without advance notice. The successful Proposer's employees
and agents shall carry sufficient identification to show by whom they are employed and
DIVERSITY IN EMPLOYMENT AND CONTRACTING REQUIREMENTS - It is the display it upon request to security personnel. County project managers have discretion
policy of Clark County to require equal opportunity in employment and services subject to require the successful Proposer's employees and agents to be escorted to and from
to eligibility standards that may be required for a specific program. Clark County is an any public office, facility or work site if national or local security appears to require it.
equal opportunity employer and is committed to providing equal opportunity in
employment and in access to the provision of all county services. Clark County's Equal SALES TAX - Out of State Businesses - WA State Reporting Thresholds & Nexus
Employment Opportunity Plan is available at https://dor.wa.gov/education/industry-guides/out-state-businesses-reporting-thresholds-
http://www.clark.wa.gov/hr/documents.html. This commitment applies regardless of and-nexus Businesses operating outside WA State must register to report B&O tax and
race, color, religion, creed, sex, marital status, national origin, disability, age, veteran collect/submit applicable sales tax, if the business meets any of the following thresholds in
status, on-the-job injury, or sexual orientation. Employment decisions are made without the current or prior year:
consideration of these or any other factors that are prohibited by law. In compliance with * Has physical presence nexus in Washington.
department of Labor Regulations in accordance with Section 504 of the Rehabilitation * Has more than $100,000 in combined gross receipts sourced or attributed to
Act (Section 504) and the Americans with Disabilities Act (ADA), commits to Washington.
nondiscrimination on the basis of disability, in all of its programs and activities. This * Is organized or commercially domiciled in Washington.
material can be made available in an alternate format by emailing
SUBCONTRACTING - No activities or services included as a part of this proposal may
ADA@clark.wa.gov or by calling 564-397-2322. The prospective contractor
be subcontracted to another organization, firm, or individual without the approval of
must agree to provide equal opportunity in the administration of the contract, and its
Clark County. Such intent to subcontract shall be clearly identified in the proposal. It is
subcontracts or other agreements.
understood that the contractor is held responsible for the satisfactory accomplishment
of the service or activities included in a subcontract.
MUNICIPAL RESEARCH and SERVICE CENTER - Clark County (WA) contracts with
VERBAL PROPOSALS - Verbal proposals will not be considered in making the award of
the Municipal Research and Service Center (MRSC) to maintain our Consultant, Small
any contract as a result of this RFP.
Works and Vendor rosters. To be eligible to participate in this Clark County public
WORKERS COMPENSATION INSURANCE - The contractor shall comply with R.C.W.
solicitation and the resulting contract, your business must be registered with the MRSC
Title 51- with minimum coverage limits of $500,000 for each accident, or provide
Rosters. Failure to register may result in your proposal being marked nonresponsive.
evidence that State law does not require such coverage.
Be sure to select Clark County in your application. If you have questions about the
registration process, contact the MRSC Rosters at 206-436-3798 or
FOR ALTERNATIVE FORMATS
https://mrscrosters.org/businesses/business-membership/
Clark County ADA Office: V: 564-397-2322
ADA@clark.wa.gov
Request for Proposals
Table of Contents
PART I PROPOSAL REQUIREMENTS
Section IA: General Information
1. Introduction
2. Background
3. Scope of Project
4. Project Funding
5. Title VI Statement
6. Timeline for Selection
7. Employment Verification
Section IB: Work Requirements
1. Required Services
2. County Performed Work
3. Deliverables and Schedule
4. Place of Performance
5. Period of Performance
6. Debarred / Suspended
7. Americans with Disabilities Act (ADA) Information
8. Public Disclosure
9. Insurance/Bond
10. Plan Holders List
PART II PROPOSAL PREPARATION AND SUBMITTAL
Section IIA: Pre-Submittal Meeting/Clarification
1. Pre-Submittal Meeting
2. Proposal Clarification
Section IIB: Proposal Submission
1. Proposals Due
2. Proposal
Section IIC: Proposal Content
1. Cover Sheet
2. Project Team
3. Management Approach
4. Respondent's Capabilities
5. Project Approach and Understanding
6. Proposed Cost
PART III PROPOSAL EVALUATION & CONTRACT AWARD
Section IIIA: Proposal Review and Selection
1. Evaluation and Selection
2. Evaluation Criteria Scoring
Section IIIB: Contract Award
1. Consultant Selection
2. Contract Development
3. Award Review
4. Orientation/Kick-off Meeting
ATTACHMENTS A: Proposal Cover Sheet
B: Letter of Interest
C: Certification Regarding Debarment, Suspension and Other Responsibility Matters Form
EXHIBITS A. Conceptual Aerial Exhibit (30%)
B. Preliminary Stormwater Memo (30%)
C. 179th Street Circulation and Access Management Plan
Request for Proposal # 958
Select Design Eng Svcs for NE 179th St Improv from NE 29th Ave To NE 50th Ave (PRJ0003763/CRP352922) Fed Aid # STBGUL-424(005)
D. Draft Hart Crowser Geotechnical Report (November 25, 2002)
E. Draft CH2MHill Geologic Hazards Assessment (September 22, 2003)
F. WSDOT Local Agency Negotiated Hourly Rate Consultant Agreement
| Section IA | General Information |
|---|---|
| 1. Introduction | The purpose of this Request for Proposals (RFP) is to obtain, in a full and open competition, proposals for required engineering services for the roadway improvements described herein. The required services are generally described below in Section 1B. This is a federally funded contract and therefore proposers must be actively registered in the System for Award Management (SAM) at the time of proposal submission and again at contract award, per FAR 52.204-7 and must maintain registration in SAM during contract performance, per FAR 52.204-13. The consultant must provide evidence of SAM registration under federal funding guidelines. Selected candidates based on proposal review may be asked to interview to determine the final consultant selection. This segment of NE 179th Street begins approximately 1.1 miles east of Interstate 5. The project will widen NE 179th Street between NE 29th Avenue and NE 50th Avenue and includes a creek crossing and the development of retaining walls. The roadway is classified as a principal arterial (Pr-4cb), with four travel lanes as well as bike and pedestrian facilities. This is a qualifications-based selection process, do not submit costs with proposal. Clark County, (WA) contracts with the Municipal Research and Service Center (MRSC) to maintain our Consultant Rosters. To be eligible to participate in this public solicitation and the resulting contract your business must be registered with the MRSC Rosters. Failure to register may result in your proposal being marked non-responsive. Be sure to select Clark County in your application. If you have questions about the registration process, contact the MRSC Rosters at 206-436-3798 or https://mrscrosters.org/businesses/business- membership/ If your company contact details are not on the Plan Holder List at https://clark.wa.gov/internal- services/request-proposal-1 Attachment B, Letter of Interest must be submitted to participate in this RFP. Proposers shall respond to all sections to be considered. Clark County has made this Request for Proposal subject to Washington State statute 39.34 RCW Interlocal Cooperation Act. The proposer may opt to extend identical services and prices to qualified public agencies. Each contract is between the proposer and individual agency binding only their agency, with no liability to Clark County. 39.80 RCW Contracts for Architectural and Engineering Services requires qualifications-based selection, do not submit costs with proposal. |
| 2. Background | The NE/NW 179th Street corridor in Clark County serves as a primary east-west facility providing access to I-5, rural neighborhoods, planned urban neighborhoods, and the Clark County Amphitheater and Fairgrounds. 179th Street is classified as a principal arterial from Northwest 11th Avenue to Northeast 72nd Avenue, intended to function to carry large volumes of traffic over long distances. When fully built, this roadway is planned to have two travel lanes in each direction with a center turn lane or median and bicycle and pedestrian facilities. The corridor is facing many challenges. The existing topography creates significant hills and valleys that will need to be adjusted to provide a modern arterial design. The 2,200-acre area surrounding the corridor was recently released from urban holding, which restricted urban density development due to a lack of |
Request for Proposal # 958
Select Design Eng Svcs for NE 179th St Improv from NE 29th Ave To NE 50th Ave (PRJ0003763/CRP352922) Fed Aid # STBGUL-424(005)
Part I Proposal Requirements
Section IA General Information
1. Introduction The purpose of this Request for Proposals (RFP) is to obtain, in a full and open competition,
proposals for required engineering services for the roadway improvements described herein. The
required services are generally described below in Section 1B.
This is a federally funded contract and therefore proposers must be actively registered in the
System for Award Management (SAM) at the time of proposal submission and again at contract
award, per FAR 52.204-7 and must maintain registration in SAM during contract performance,
per FAR 52.204-13. The consultant must provide evidence of SAM registration under federal
funding guidelines.
Selected candidates based on proposal review may be asked to interview to determine the final
consultant selection.
This segment of NE 179th Street begins approximately 1.1 miles east of Interstate 5. The project
will widen NE 179th Street between NE 29th Avenue and NE 50th Avenue and includes a creek
crossing and the development of retaining walls. The roadway is classified as a principal arterial
(Pr-4cb), with four travel lanes as well as bike and pedestrian facilities.
This is a qualifications-based selection process, do not submit costs with proposal.
Clark County, (WA) contracts with the Municipal Research and Service Center (MRSC) to
maintain our Consultant Rosters. To be eligible to participate in this public solicitation and the
resulting contract your business must be registered with the MRSC Rosters.
Failure to register may result in your proposal being marked non-responsive. Be sure to select
Clark County in your application. If you have questions about the registration process, contact
the MRSC Rosters at 206-436-3798 or https://mrscrosters.org/businesses/business-
membership/
If your company contact details are not on the Plan Holder List at https://clark.wa.gov/internal-
services/request-proposal-1
Attachment B, Letter of Interest must be submitted to participate in this RFP.
Proposers shall respond to all sections to be considered.
Clark County has made this Request for Proposal subject to Washington State statute 39.34 RCW
Interlocal Cooperation Act. The proposer may opt to extend identical services and prices to
qualified public agencies. Each contract is between the proposer and individual agency binding
only their agency, with no liability to Clark County. 39.80 RCW Contracts for Architectural and
Engineering Services requires qualifications-based selection, do not submit costs with proposal.
2. Background The NE/NW 179th Street corridor in Clark County serves as a primary east-west facility providing
access to I-5, rural neighborhoods, planned urban neighborhoods, and the Clark County
Amphitheater and Fairgrounds. 179th Street is classified as a principal arterial from Northwest 11th
Avenue to Northeast 72nd Avenue, intended to function to carry large volumes of traffic over long
distances. When fully built, this roadway is planned to have two travel lanes in each direction with
a center turn lane or median and bicycle and pedestrian facilities. The corridor is facing many
challenges. The existing topography creates significant hills and valleys that will need to be
adjusted to provide a modern arterial design. The 2,200-acre area surrounding the corridor was
recently released from urban holding, which restricted urban density development due to a lack of
| supporting infrastructure. In the future, this area is expected to experience significant development, creating a large amount of commercial and residential uses that must use 179th Street to access I- 5. This project proposes to continue road improvements to the NE 179th Street Corridor by connecting to the east end of the roundabout currently being constructed at the intersection of NE 179th Street and NE 29th Avenue and building out a full principal arterial roadway section with multiuse pathways on both sides of the road up to the vicinity of the recently improved intersection at 179th Street and NE 50th Avenue. There are currently multiple projects either in construction or advanced design between Delfel Road to the west of the I-5/179th Street Interchange and 50th Avenue. This project will complete the planned corridor improvements up to the vicinity of 50th Avenue. The reconstruction of the intersection at NE 179th Street and 50th Avenue is not part of this proposed project since a recent interim intersection improvement project was recently completed at that location. Current plans have this intersection being reconstructed in the future when it reaches capacity and funding can be obtained. | |
|---|---|
| 3. Scope of Project | Clark County is seeking select engineering services to support the on-time and on-budget delivery of this project, which involves in its entirety the design/engineering, real property acquisition, and environmental documentation and permitting necessary to prepare a biddable and constructible set of plans and specifications, followed by the bidding and construction of the project by the county and its contractor. The required consultant engineering services are generally described below in Section 1B. The scope of the full project is the re-construction of a county principal arterial roadway, which will widen and improve NE 179th Street between NE 29th Avenue and NE 50th Avenue. The project will not include the intersections at NE 29th Avenue and NE 50th Avenue, which are being completed under other county projects, but will tie into the work on either end. As noted, the roadway is classified as a principal arterial (Pr-4cb), with four travel lanes, center left-turn lane or median, and bike and pedestrian facilities. Consultants shall ensure that all proposed design concepts, traffic engineering analyses, and access configurations are consistent with the adopted 179th Street Circulation and Access Management Plan (July 2023). The plan establishes corridor-wide access management strategies including restricted access intersections, roundabout-based U turn circulation, driveway spacing, median treatments, and use of collector/local streets to limit direct driveway access to the principal arterial. Proposals must clearly describe how these requirements will be evaluated, incorporated, and documented during design, including identification of any anticipated constraints, necessary interim access strategies, or potential conflicts with the future roadway profile and circulation network described in the plan. Traffic engineering and analysis work will ensure conformance to the 179th Street Circulation and Access Management Plan and may include such work as signing, striping, pedestrian crossings with RRFB's / HAWK beacons and street lighting. The project will include one crossing (structure and walls) of a tributary of Mill Creek; the contract scope will include an alternatives analysis of the crossing to determine structure type (preference is a fish passage structure that will allow for NE 35th to connect to the new 179th profile). Wetlands and riparian area impacts are likely near this crossing; environmental work will be included in the consultant provided services. The profile of the roadway will be raised at the creek crossing and elsewhere to meet a 40-mph design standard. Multiple stormwater facilities will also be designed and constructed as part of this project. One will be adjacent to the creek crossing and a second stormwater facility has been proposed in the vicinity of the NE 179th Street/NE 50th Avenue intersection. This project involves complex environmental permitting and documentation, including coordination under NEPA with FHWA, preparation of a Biological Assessment (BA), and consultation with National Marine Fisheries Service (NMFS). Recent updates to road runoff regulations-especially the incorporation of stormwater pollution from tire preservatives like 6PPD quinone-require |
Request for Proposal # 958
Select Design Eng Svcs for NE 179th St Improv from NE 29th Ave To NE 50th Ave (PRJ0003763/CRP352922) Fed Aid # STBGUL-424(005)
supporting infrastructure. In the future, this area is expected to experience significant development,
creating a large amount of commercial and residential uses that must use 179th Street to access I-
5.
This project proposes to continue road improvements to the NE 179th Street Corridor by connecting
to the east end of the roundabout currently being constructed at the intersection of NE 179th Street
and NE 29th Avenue and building out a full principal arterial roadway section with multiuse pathways
on both sides of the road up to the vicinity of the recently improved intersection at 179th Street and
NE 50th Avenue. There are currently multiple projects either in construction or advanced design
between Delfel Road to the west of the I-5/179th Street Interchange and 50th Avenue. This project
will complete the planned corridor improvements up to the vicinity of 50th Avenue. The
reconstruction of the intersection at NE 179th Street and 50th Avenue is not part of this proposed
project since a recent interim intersection improvement project was recently completed at that
location. Current plans have this intersection being reconstructed in the future when it reaches
capacity and funding can be obtained.
3. Scope of Project Clark County is seeking select engineering services to support the on-time and on-budget delivery
of this project, which involves in its entirety the design/engineering, real property acquisition, and
environmental documentation and permitting necessary to prepare a biddable and constructible
set of plans and specifications, followed by the bidding and construction of the project by the county
and its contractor.
The required consultant engineering services are generally described below in Section 1B.
The scope of the full project is the re-construction of a county principal arterial roadway, which will
widen and improve NE 179th Street between NE 29th Avenue and NE 50th Avenue. The project
will not include the intersections at NE 29th Avenue and NE 50th Avenue, which are being
completed under other county projects, but will tie into the work on either end. As noted, the
roadway is classified as a principal arterial (Pr-4cb), with four travel lanes, center left-turn lane or
median, and bike and pedestrian facilities.
Consultants shall ensure that all proposed design concepts, traffic engineering analyses, and
access configurations are consistent with the adopted 179th Street Circulation and Access
Management Plan (July 2023). The plan establishes corridor-wide access management strategies
including restricted access intersections, roundabout-based U turn circulation, driveway spacing,
median treatments, and use of collector/local streets to limit direct driveway access to the principal
arterial. Proposals must clearly describe how these requirements will be evaluated, incorporated,
and documented during design, including identification of any anticipated constraints, necessary
interim access strategies, or potential conflicts with the future roadway profile and circulation
network described in the plan. Traffic engineering and analysis work will ensure conformance to
the 179th Street Circulation and Access Management Plan and may include such work as signing,
striping, pedestrian crossings with RRFB's / HAWK beacons and street lighting.
The project will include one crossing (structure and walls) of a tributary of Mill Creek; the contract
scope will include an alternatives analysis of the crossing to determine structure type (preference
is a fish passage structure that will allow for NE 35th to connect to the new 179th profile). Wetlands
and riparian area impacts are likely near this crossing; environmental work will be included in the
consultant provided services. The profile of the roadway will be raised at the creek crossing and
elsewhere to meet a 40-mph design standard. Multiple stormwater facilities will also be designed
and constructed as part of this project. One will be adjacent to the creek crossing and a second
stormwater facility has been proposed in the vicinity of the NE 179th Street/NE 50th Avenue
intersection.
This project involves complex environmental permitting and documentation, including coordination
under NEPA with FHWA, preparation of a Biological Assessment (BA), and consultation with
National Marine Fisheries Service (NMFS). Recent updates to road runoff regulations-especially
the incorporation of stormwater pollution from tire preservatives like 6PPD quinone-require
| additional review and specialized technical expertise. WSDOT and Ecology now require advanced stormwater BMPs to address 6PPD quinone impacts on aquatic life, particularly coho salmon. | |
|---|---|
| 4. Project Funding | The project is funded with local County Road Funds, Traffic Impact Fees, Federal Funds (FHWA), and Real Estate Excise Tax funds. The project has a 0% FSBE goal set. In the absence of a mandatory goal, this project is subject to a voluntary ten percent (10%) Small Business Enterprise (SBE) requirement. As part of this RFP, the consultant's System for Award Management (SAM) registration is required. This is a qualifications-based selection process. Do not submit costs with the proposal. |
| 5. Title VI Statement | Title VI Statement Clark County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. El Condado de Clark, de acuerdo con las disposiciones del Titulo VI de la Ley de Derechos Civiles de 1964 (78 Stat. 252, 42 U.S.C. 2000d a 2000d 4) y el Reglamento, por la presente notifica a todos los postores que se asegurara afirmativamente de que cualquier contrato celebrado de conformidad con este anuncio, las empresas comerciales desfavorecidas tendran la oportunidad plena y justa de presentar ofertas en respuesta a esta invitacion y no seran discriminadas por motivos de raza, color u origen nacional en consideracion a un laudo. For questions regarding Clark County Public Works' Title VI Program, or for interpretation or translation services for non-English speakers, or otherwise making materials available in an alternate format, contact Clark County Public Works' Title VI Coordinator via email at CCPW- TitleVI@clark.wa.gov or phone at 564-397-4944. Hearing/speech impaired may call the Washington Relay Center at 711. La poliza del condado de Clark es garantizar que ninguna persona por motivos de raza, color, origen nacional o sexo segun lo dispuesto en el Title VI of the Civil Rights Act de 1964, segun enmendada, sea excluida por participar en, ser negado los beneficios de, o ser discriminado por cualquier programa o actividad patrocinada por el condado. Para preguntas relacionadas con el programa de Title VI de Obras Publicas del condado de Clark, o para servicios de interpretacion o traduccion para personas que no hablan ingles. O para que los materiales esten disponibles en un formato alternativo, comuniquese con el coordinador del Title VI de Obras Publicas del condado de Clark por correo electronico a CCPW-TitleVI@clark.wa.gov o por telefono a 564- 397-4944. Las personas con problemas de audicion / habla pueden llamar a Washington Relay Center al 711. , , , , VI 1964 . . , , . , . , , , . |
Request for Proposal # 958
Select Design Eng Svcs for NE 179th St Improv from NE 29th Ave To NE 50th Ave (PRJ0003763/CRP352922) Fed Aid # STBGUL-424(005)
additional review and specialized technical expertise. WSDOT and Ecology now require advanced
stormwater BMPs to address 6PPD quinone impacts on aquatic life, particularly coho salmon.
4. Project Funding The project is funded with local County Road Funds, Traffic Impact Fees, Federal Funds (FHWA),
and Real Estate Excise Tax funds.
The project has a 0% FSBE goal set. In the absence of a mandatory goal, this project is subject to
a voluntary ten percent (10%) Small Business Enterprise (SBE) requirement.
As part of this RFP, the consultant's System for Award Management (SAM) registration is required.
This is a qualifications-based selection process. Do not submit costs with the proposal.
5. Title VI Title VI Statement
Statement Clark County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat.
252, 42 U.S.C. 2000d to 2000d 4) and the Regulations, hereby notifies all bidders that
it will affirmatively ensure that any contract entered into pursuant to this advertisement,
disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in
response to this invitation and will not be discriminated against on the grounds of race, color, or
national origin in consideration for an award.
El Condado de Clark, de acuerdo con las disposiciones del Titulo VI de la Ley de Derechos Civiles
de 1964 (78 Stat. 252, 42 U.S.C. 2000d a 2000d 4) y el Reglamento, por la presente notifica a
todos los postores que se asegurara afirmativamente de que cualquier contrato celebrado de
conformidad con este anuncio, las empresas comerciales desfavorecidas tendran la oportunidad
plena y justa de presentar ofertas en respuesta a esta invitacion y no seran discriminadas por
motivos de raza, color u origen nacional en consideracion a un laudo.
For questions regarding Clark County Public Works' Title VI Program, or for interpretation or
translation services for non-English speakers, or otherwise making materials available in an
alternate format, contact Clark County Public Works' Title VI Coordinator via email at CCPW-
TitleVI@clark.wa.gov or phone at 564-397-4944. Hearing/speech impaired may call the
Washington Relay Center at 711.
La poliza del condado de Clark es garantizar que ninguna persona por motivos de raza, color,
origen nacional o sexo segun lo dispuesto en el Title VI of the Civil Rights Act de 1964, segun
enmendada, sea excluida por participar en, ser negado los beneficios de, o ser discriminado por
cualquier programa o actividad patrocinada por el condado. Para preguntas relacionadas con el
programa de Title VI de Obras Publicas del condado de Clark, o para servicios de interpretacion
o traduccion para personas que no hablan ingles. O para que los materiales esten disponibles
en un formato alternativo, comuniquese con el coordinador del Title VI de Obras Publicas del
condado de Clark por correo electronico a CCPW-TitleVI@clark.wa.gov o por telefono a 564-
397-4944. Las personas con problemas de audicion / habla pueden llamar a Washington Relay
Center al 711.
, ,
,
,
VI 1964 .
. ,
, .
,
.
, , ,
.
| , , , , - VI 1964 - , , , . , VI , , , , VI CCPW-TitileVI@clark.wa.gov 564.397.4944. 711. | |
|---|---|
| 6. Timeline for Selection | The following dates are the intended timeline: Deadline for Questions and Answers June 25, 2026 Final date for Addendum, if needed June 27, 2026 Proposals Due July 8, 2026 Proposal Review/Evaluation Period July 13 - July 24, 2026 Interviews/Demonstration July 27 -July 31, 2026 Selection Committee Recommendation July 31, 2026 Contract Negotiation/Execution August 3 - August 31, 2026 Contract Intended to Begin September 1, 2026 |
| 7. Employment Verification | The Proposer, if awarded the Contract, shall register and enter into a Memorandum of Understanding (MOU) with the Department of Homeland Security E-Verify program before execution of the Contract. The Contractor shall ensure all Contractor employees and any sub- contractor(s) assigned to perform work under this Agreement are eligible to work in the United States. The Contractor shall provide verification of compliance upon County request. Failure by Contractor to comply with this subsection shall be considered a material breach. (Sole Proprietors must submit a letter stating such.) |
| Section IB | Work Requirements |
| 1. Required Services | Clark County is requesting engineering professional services to join the in-house project team. The consultants will work closely with designated County personnel. Separate firms may provide the types of services listed below; however, the firms must be presented as a joint team for the proposal. Subcontracting amongst firms is acceptable; however, a single firm must be identified as the "prime" and subcontracts must include the necessary clauses required by the Clark County contract (WSDOT Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement). The required services (anticipated but not necessarily limited to) are described below: |
| Deadline for Questions and Answers | June 25, 2026 |
|---|---|
| Final date for Addendum, if needed | June 27, 2026 |
| Proposals Due | July 8, 2026 |
| Proposal Review/Evaluation Period | July 13 - July 24, 2026 |
| Interviews/Demonstration | July 27 -July 31, 2026 |
| Selection Committee Recommendation | July 31, 2026 |
| Contract Negotiation/Execution | August 3 - August 31, 2026 |
| Contract Intended to Begin | September 1, 2026 |
Request for Proposal # 958
Select Design Eng Svcs for NE 179th St Improv from NE 29th Ave To NE 50th Ave (PRJ0003763/CRP352922) Fed Aid # STBGUL-424(005)
, ,
, , -
VI 1964 -
, ,
, . ,
VI ,
, ,
, VI
CCPW-TitileVI@clark.wa.gov
564.397.4944.
711.
6. Timeline for The following dates are the intended timeline:
Selection
Deadline for Questions and Answers June 25, 2026
Final date for Addendum, if needed June 27, 2026
Proposals Due July 8, 2026
Proposal Review/Evaluation Period July 13 - July 24, 2026
Interviews/Demonstration July 27 -July 31, 2026
Selection Committee Recommendation July 31, 2026
Contract Negotiation/Execution August 3 - August 31, 2026
Contract Intended to Begin September 1, 2026
7. Employment The Proposer, if awarded the Contract, shall register and enter into a Memorandum of
Verification Understanding (MOU) with the Department of Homeland Security E-Verify program before
execution of the Contract. The Contractor shall ensure all Contractor employees and any sub-
contractor(s) assigned to perform work under this Agreement are eligible to work in the United
States. The Contractor shall provide verification of compliance upon County request. Failure by
Contractor to comply with this subsection shall be considered a material breach.
(Sole Proprietors must submit a letter stating such.)
Section IB Work Requirements
1. Required Services Clark County is requesting engineering professional services to join the in-house project team.
The consultants will work closely with designated County personnel. Separate firms may provide
the types of services listed below; however, the firms must be presented as a joint team for the
proposal.
Subcontracting amongst firms is acceptable; however, a single firm must be identified as the
"prime" and subcontracts must include the necessary clauses required by the Clark County
contract (WSDOT Local Agency A&E Professional Services Negotiated Hourly Rate Consultant
Agreement).
The required services (anticipated but not necessarily limited to) are described below:
| Initiation, Coordination and Meetings: Provide on-going consultant project management, coordination, and communication with the project design team and county staff throughout the project. Includes all coordination and communication necessary to successfully accomplish the project work. Initial kick-off meeting with Clark County o Preapplication meeting with Regulatory Agencies o Up to 24 project team/ progress meetings through end of project term. o Up to 10 coordination meetings with the County QA/QC Design Engineer o Design review meetings at 50%, 65%, 90%, and 99% preliminary plan submittals o Public Outreach and Access Hearings: Participate in public involvement activities managed by Clark County, throughout the project design phase, including: Attend up to 2 open houses o Provide up to four (4) display boards, including photo displays and conceptual graphics o depicting permits processed or items of interest Hydraulic Engineering: Provide support, data and engineering as needed for creek crossing alternatives analysis o Provide fish passage compliant culvert design, if culvert is selected o Possess knowledge of HEC-13 and HEC-23 o Evaluate streamed and bank protection needs, shear stresses and scour, streambed o Stone gradations and stream corridor design in accordance with FHWA Hydraulic Engineering Circulars If stream realignment is necessary, stream channel restoration design will be required o Analyze the associated floodplain permit application with supporting documentation Submit plan sheets, specifications and cost estimates at 50%, 65%, 90%, 99% and final PS&E. Documents shall be biddable and constructible, taken through a QA/QC process and prepared and stamped by a professional engineer licensed in the State of Washington Support Environmental Process with necessary documentation including fish passage and o WDFW's stream design Geotechnical Engineering: Conduct geotechnical investigations and analysis to evaluate subsurface conditions, slope o stability hazards, walls and structures; groundwater evaluation; stream bed material analysis; evaluate subsurface conditions for stormwater treatment facilities. Determine roadway pavement section requirements o Provide support, data and engineering as needed for creek crossing alternatives analysis o Provide design parameters and make recommendations for bridge/culvert and retaining o walls foundation design. Provide necessary information for environmental documentation. o Provide support during construction with design clarifications, submittal reviews, change o order drawings, etc. During construction, design lead team members must be available either in person, by phone, or by email. It is anticipated that the design lead team member may be required to attend up to five (5) on-site construction meetings in person. Structural Engineering: Perform creek crossing alternatives analysis o Provide design of structures including bridge (or culvert) and retaining walls. o Coordinate with Geotech regarding soil parameters. o Submit plan sheets, specifications and cost estimates at 50%, 65%, 90%, 99% and final o PS&E. Documents shall be biddable and constructible, taken through a QA/QC process |
|---|
Request for Proposal # 958
Select Design Eng Svcs for NE 179th St Improv from NE 29th Ave To NE 50th Ave (PRJ0003763/CRP352922) Fed Aid # STBGUL-424(005)
Initiation, Coordination and Meetings:
Provide on-going consultant project management, coordination, and communication with
the project design team and county staff throughout the project. Includes all coordination
and communication necessary to successfully accomplish the project work.
Initial kick-off meeting with Clark County
o
Preapplication meeting with Regulatory Agencies
o
Up to 24 project team/ progress meetings through end of project term.
o
Up to 10 coordination meetings with the County QA/QC Design Engineer
o
Design review meetings at 50%, 65%, 90%, and 99% preliminary plan submittals
o
Public Outreach and Access Hearings:
Participate in public involvement activities managed by Clark County, throughout the project design
phase, including:
Attend up to 2 open houses
o
Provide up to four (4) display boards, including photo displays and conceptual graphics
o
depicting permits processed or items of interest
Hydraulic Engineering:
Provide support, data and engineering as needed for creek crossing alternatives analysis
o
Provide fish passage compliant culvert design, if culvert is selected
o
Possess knowledge of HEC-13 and HEC-23
o
Evaluate streamed and bank protection needs, shear stresses and scour, streambed
o
Stone gradations and stream corridor design in accordance with FHWA Hydraulic
Engineering Circulars
If stream realignment is necessary, stream channel restoration design will be required
o
Analyze the associated floodplain permit application with supporting documentation
Submit plan sheets, specifications and cost estimates at 50%, 65%, 90%, 99% and final
PS&E. Documents shall be biddable and constructible, taken through a QA/QC process
and prepared and stamped by a professional engineer licensed in the State of Washington
Support Environmental Process with necessary documentation including fish passage and
o
WDFW's stream design
Geotechnical Engineering:
Conduct geotechnical investigations and analysis to evaluate subsurface conditions, slope
o
stability hazards, walls and structures; groundwater evaluation; stream bed material
analysis; evaluate subsurface conditions for stormwater treatment facilities.
Determine roadway pavement section requirements
o
Provide support, data and engineering as needed for creek crossing alternatives analysis
o
Provide design parameters and make recommendations for bridge/culvert and retaining
o
walls foundation design.
Provide necessary information for environmental documentation.
o
Provide support during construction with design clarifications, submittal reviews, change
o
order drawings, etc. During construction, design lead team members must be available
either in person, by phone, or by email. It is anticipated that the design lead team member
may be required to attend up to five (5) on-site construction meetings in person.
Structural Engineering:
Perform creek crossing alternatives analysis
o
Provide design of structures including bridge (or culvert) and retaining walls.
o
Coordinate with Geotech regarding soil parameters.
o
Submit plan sheets, specifications and cost estimates at 50%, 65%, 90%, 99% and final
o
PS&E. Documents shall be biddable and constructible, taken through a QA/QC process
| and prepared and stamped by a professional engineer licensed in the State of Washington. Support Environmental Process with necessary documentation. o Provide support during the bid period with response to inquiries, preparation of o addendums, etc. Provide support during construction with design clarifications, submittal reviews, change o order drawings, etc. During construction, design lead team members must be available either in person, by phone, or by email. It is anticipated that the design lead team member may be required to attend up to five (5) on-site construction meetings in person. Traffic Engineering: Traffic engineering tasks shall be performed in accordance with the 179th Street o Circulation and Access Management Plan (July 2023). Consultants shall evaluate and apply the plan's access management requirements, including: Driveway and side-street placement outside intersection influence zones, with use o of right-in/right-out control where required. Application of median treatments and corridor roundabouts to manage U-turns o and circulation patterns along the arterial. Analyze driveway and intersection access, medians, left-turn pockets per plan. o Provide recommendations for driveway spacing, shared access, and conflict point reductions (e.g., consolidated driveways, displaced/raised medians). Model corridor operations with Synchro or similar tools to evaluate proposed o configurations. Integration of future local street connections as shown in the supplemental plan o layers, ensuring adequate parcel connectivity and shared access provisions. Consideration of planned pedestrian and bicycle crossing expectations, including o enhanced crossings where warranted by speed and corridor width. Model vehicular and pedestrian interactions to support performance criteria like crossing distance/time, vehicular delay, and flashing beacon visibility. Identify and evaluate potential crossing locations for RRFBs or HAWK beacons. Prepare detailed signing and striping layout in accordance with Clark County Traffic o Manual and MUTCD. Identify sign types (regulatory, warning, guide) including street name signage and o barricades. Dimension pavement markings (arrows, lane lines, bike lanes, speed bumps, pedestrian o refuge islands, symbols). Address removal of existing markings and installation of temporary/planned pavement o markings during construction. Develop Temporary Traffic Control (TTC) plans: lane closures, detours, signs, barriers, o and sequenced work zones per WSDOT standards. Coordinate TTC with utility work, stormwater construction, and retaining wall installation. o Inventory any existing lighting and propose new fixtures to meet minimum roadway and pedestrian standards. Detail pole locations, mountings, luminaire specs, conduit layouts, power supply, and o photometric analysis. Compile available traffic counts and perform supplemental field data collection (preliminary o turning movements, pedestrian/bicycle volumes). Model existing and future Year-of-Opening operations, focusing on corridor capacity and o level-of-service impacts. Evaluate signal warranting at new or modified pedestrian crossings. o Ensure design compliance with MUTCD, ADA (ramps, crosswalks), and relevant o state/county policies. Submit draft and final signing/striping and crossing plans at standard design milestones o (50%, 65%, 90%, 99%, PS&E). Provide exhibits in CAD and PDF format supporting permitting and public outreach. o Attend progress/design review meetings, support responses to inquiries, revisions, and o addendums. |
|---|
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow NUWC Division Keyport Industry Engagement - Wednesday with the Deputy for Small
DEPT OF DEFENSE
Bid Due: 12/16/2026
Follow NUWC Division Keyport Industry Engagement - Wednesday with the Deputy for Small
DEPT OF DEFENSE
Bid Due: 12/16/2026
Project ID: CTY-CR-2025-07 Title: CITYWIDE CONSULTANT ROSTER: Architectural and Planning Consulting Addenda: 0
City of Seattle
Bid Due: 12/30/2030
Follow NUWC Division Keyport Industry Engagement - Wednesday with the Deputy for Small
DEPT OF DEFENSE
Bid Due: 12/16/2026