Security CCTV Design and Installation Project Request for Proposals - Released 08/18/2026 Exhibit A - Sample Agreement Exhibit B - Insurance Headquarters Facility Maps District Yard Facility Maps Pre-Proposal Meeting Sign In - Released 09/15/2026
| Agency: | Costa Mesa Sanitary District |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 24, 2026 |
| Due Date: | Oct 8, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Notice Inviting Bids/Request For Proposal | Bid Status | Bid Tabulation | Awardee |
|
Security CCTV Design and Installation Project
Request for Proposals - Released 08/18/2026 Exhibit A - Sample Agreement Exhibit B - Insurance Headquarters Facility Maps District Yard Facility Maps Pre-Proposal Meeting Sign In - Released 09/15/2026 |
Status: Open
|
Attachment Preview
REQUEST FOR PROPOSALS
By
Costa Mesa Sanitary District
For
Security CCTV Design and Installation Project
Release Date: August 18, 2026
Proposals Due: 2:00 PM (PST), October 8, 2026
Deliver Hard Copy Proposals and Thumb Drive with Electronic files to CMSD
Headquarters,
Attn: District Clerk
Engineers Estimate: $225,000
Costa Mesa Sanitary District
(Headquarters Office)
290 Paularino Avenue
Costa Mesa, CA 92626
(949) 645-8400
P age | 2
Page Intentionally Left Blank
P age | 3
TABLE OF CONTENTS
I. Introduction pg. 5
II. Announcement pg. 5
A. Project Goal & Objective pg. 5
B. Solicitation Schedule pg. 6
III. Scope of Service pg. 7
A. Proposer Requirements pg. 7
B. Gather Information and Data pg. 7
C. Best Practices and Alternative Tech Memo pg. 7
D. Design and Plan Development pg. 8
E. Technical Overview and Needs pg. 9
F. Meeting(s) pg. 11
G. Licensing and Annual Subscriptions pg. 12
IV. Instructions to Proposers pg. 13
A. Examination of Proposed Documents pg. 13
B. Addenda/Clarification pg. 13
C. Withdrawal of Proposal pg. 13
D. Rights of the District pg. 13
E. Deadline for Submittal of Proposals pg. 13
V. Proposal Requirements pg. 14
A. General Information pg. 14
B. Technical Proposal pg. 15-16
C. Cost Proposal pg. 17-18
VI. Selection Criteria pg. 19
A. Review of Proposals pg. 19
B. Evaluation Criteria pg. 19
VII. District Agreement & Insurance Requirements pg. 20
PROPOSAL COVER SHEET pg. 21
PROPOSAL COST FORM pg. 22
EXHIBIT A - SAMPLE AGREEMENT FOR SERVICES
P age | 4
Page Intentionally Left Blank
P age | 5
I. INTRODUCTION
The Costa Mesa Sanitary District (District) is an independent special district, governed by an
elected five-member Board of Directors, formed in 1944 under the Sanitary District Act of 1923.
District boundaries encompass the City of Costa Mesa and small portions of Newport Beach and
unincorporated Orange County, serving a population of approximately 120,000 and close to
4,000 businesses.
As a sanitary district, the District is responsible for residential solid waste (trash) collection and
wastewater (sewer) collection throughout its service area. The District provides liquid waste
collection and transmission (sewer system) to Orange County Sanitation District facilities for
treatment and disposal. The District's sewer system consists of approximately 225 miles of
sewer mains, approximately 5,000 manholes, and 20 pump stations. Visit www.cmsdca.gov for
more information about the District.
The District accomplishes these core responsibilities through a combination of public and
private services, which include an in-house administrative and wastewater staff and privately
contracted trash hauler, attorney, treasurer, IT, and engineering firm.
II. ANNOUNCEMENT
The District is seeking proposals from qualified firms, teams, and/or contractors (Proposers) for
a Project consisting of the design and installation of a security closed circuit television camera
system for the District's two administrative facilities: District Headquarters and District Yard.
The system must be expandable to remote locations through the District sewer system; the
District may expand the system to each pump station in the future. This Request for Proposal
(RFP) outlines the various Project and RFP requirements and selection process.
A. PROJECT GOAL & OBJECTIVE
The overall objective of the Project is to install an advanced security CCTV system that
utilizes hardware and software in combination with artificial intelligence technology to
develop a smart system that monitors each District facility, understands actual threats or
concerns, then notifies District staff of the threat situation.
| DATE | ACTION | ||||
|---|---|---|---|---|---|
| 8/18/2026 | RFP Issuance and First Advertisement | ||||
| 08/27/2026 | Second Advertisement | ||||
| 09/10/2026 | Mandatory Pre-proposal Meeting at 10:00 a.m. | ||||
| at District Headquarters | |||||
| 09/22/2026 | RFP Question Deadline | ||||
| 09/24/2026 | Addendum/RFP Answers Released | ||||
| 10/08/2026 | Proposals Due by 2:00 P.M. (Hard copies and | ||||
| thumb drive delivered to District Headquarters | |||||
| 10/12/2026 - 10/15/2026 | Evaluation of Proposals | ||||
| 10/19/2026 | Notice of Proposers to be Interviewed (if necessary) | ||||
| 11/03/2026 | Proposer Interviews (if necessary) | ||||
| 11/05/2026 - 11/09/2026 | Evaluation of Interviewed Proposers (if necessary) | ||||
| 11/10/2026 | Notice of Selected Proposer/Notice of Award | ||||
| 12/21/2026 | Board Award (if necessary) 1 |
P age | 6
B. SOLICITATION SCHEDULE
To be considered, Proposals must be delivered to the District HQ at 290 Paularino Ave,
Costa Mesa CA 92626, by no later than the Submittal Date indicated, below. The RFP
submission timeline is as follows:
DATE ACTION
8/18/2026 RFP Issuance and First Advertisement
08/27/2026 Second Advertisement
09/10/2026 Mandatory Pre-proposal Meeting at 10:00 a.m.
at District Headquarters
09/22/2026 RFP Question Deadline
09/24/2026 Addendum/RFP Answers Released
10/08/2026 Proposals Due by 2:00 P.M. (Hard copies and
thumb drive delivered to District Headquarters
10/12/2026 - 10/15/2026 Evaluation of Proposals
10/19/2026 Notice of Proposers to be Interviewed (if
necessary)
11/03/2026 Proposer Interviews (if necessary)
11/05/2026 - 11/09/2026 Evaluation of Interviewed Proposers (if necessary)
11/10/2026 Notice of Selected Proposer/Notice of Award
12/21/2026 Board Award (if necessary) 1
Notes:
1. If Fee Proposal is less than $125k, the District General Manager may award sooner
P age | 7
III. SCOPE OF SERVICE
A. Proposer Requirements: The Proposer shall possess the following qualifications:
1. State of California Contractor license
a. A-general Engineering Contractor; or
b. C-7 Low Voltage Systems, C-10 Electrical, and C-28 Security
Equipment.
2. City of Costa Mesa Business License.
3. Maintain current and in-good standing, contactor and Business
License.
B. Gather Information and Data
1. Walk the existing facilities and gather any information required to
determine alternatives for the proposed work.
2. Kick-off Meeting: Schedule and conduct an initial or "kick-off"
meeting with the District team after the Notice to Proceed. The
meeting may be conducted on the same day as the facility walk. Be
prepared to discuss possible alternatives and/or delivery options for
the system. Provide an overview of the Project work, Project
schedule, and list of activities required to complete the design and
design reviews.
C. Best Practices and Alternative Hardware, Software, and Installation Practices
Technical Memorandum
1. Review best industry practice within the security and CCTV industry.
Prepare a technical memorandum outlining the best industry
practices and those recommended for the District to consider. Include
a review and description of the various cameras, remote devices,
storage methods, computers, and/or interface devices associated
with smart security CCTV systems.
2. Discuss the benefits and trade-offs between the various equipment
and installation options. Examples include the benefits and
drawbacks of various camera/video device types.
P age | 8
3. The best practices should include a list of public agencies and/or
private companies that employ these practices and their use cases.
Submit a 90% complete (draft) Technical Memorandum for the
District to review. After the District review, the Proposer shall
incorporate comments and submit the final Tech Memo.
4. The Technical Memorandum shall discuss and provide costs for the
various options and overall installation recommendations.
D. Design and Plan Development
Note: In addition to requirements and scope items within this Scope of Work and
RFP, at a minimum, CCTV System design and requirements shall comply with
Department of Homeland Security (DHS) CCTV Technology Handbook, Latest Edition.
1. Prepare the design and layout documents along with technical
specifications for the selected system.
a. Include shop draws, catalog cuts, and other technical information.
The selected system must be based on the selected alternative
and options (Work Item B), including District feedback and
comments regarding the technical memorandum.
b. Conduct two (2) design meetings: one to review the draft (at 85%
design completion) and a final design meeting. Submit a set of
final design documents, plans, specifications, catalog cuts, and
related technical documentation.
c. On or before 85% design completion, include a comprehensive
Logical Network Topology map. This map, along with proposed IP
addressing, VLAN requirements, bandwidth calculations, and
firewall port requirements, must be submitted to and formally
approved by the District's IT Managed Service Provider (MSP)
prior to any hardware procurement or installation.
d. Submit a final set of construction documents after incorporating
the District's comments at 85% completion.
P age | 9
E. Technical Overview and Needs
1. Hybrid-cloud storage architecture, ensuring footage is saved directly to
local edge storage (onsite NVR preferred) and proxied to the cloud
2. Battery backup for on-site equipment (4-hour minimum)
3. Centralized Video Management Software (VMS) platform or cloud-native
management dashboard
4. Camera Quality & Features
a. Exterior
i. Quality and features
ii. Minimum Exterior Video Camera Quality 4K (8MP)
iii. Pan, Tilt, PZT
iv. Zoom
v. Motion Detection & Tracking
vi. AI/Facial Recognition
vii. AI Threat Recognition
viii. Night vision
b. Interior
i. Quality and feature extensions
ii. Minimum Interior Video Camera Quality 5MP
iii. Pan/Tilt
iv. Zoom
v. Motion Detection & Tracking
vi. AI/Facial Recognition
vii. AI Threat Recognition
viii. Night vision
5. District Headquarters Cameras
a. Exterior Building Camera(s)
i. Required to eliminate blind spots and provide redundancy
views
ii. Driveway/License Plate Reader Camera(s)
iii. Front Porch Camera
b. Interior Cameras
i. Lobby Camera(s)
ii. Board Room Camera(s)
iii. North Entrance Camera South Entrance Camera
6. Yard Camera
a. Exterior Building Cameras
P age | 10
i. Required to eliminate blind spots and provide redundancy views
ii. Driveway(s) License Plate Reader Cameras
b. Interior Building Camera
i. Shop Area entrance(s)
ii. Office area/Kitchen entrances
7. Pump Station (Future: Not part of this project/contract)
a. Twenty (20) District Pump Stations are located throughout Costa
Mesa and Newport Beach. None of the pump stations currently
have communication capability for video feed. Provide a
description of security CCTV and communications system
recommendations for future consideration.
8. System Capabilities
a. Electronic boundary
b. Human versus animal recognition
c. Provides video and still pictures
d. 30-day storage (minimum and recall)
e. Remote access via computer (PC/Windows) and/or cell phones
(possible app-based)
f. Artificial Intelligence capable
g. System fault or issue, power loss, power restored, and/or problem
notification (email, text, phone call)
h. Combination of CAT 6 and Wireless capabilities depending on
location and Consultant recommendations
i. Required power source to video camera, drives, and/or control
panel
j. Live feed accessible via Internet (cloud)
k. Equipment location must be accessible for maintenance at ground
level or by ladder (District does not own a boom-lift)
Note: The District may not initially choose to take advantage of the full technology,
depending on annual and/or subscription costs, service needs, and/or other
(operational) considerations.
9. Regulatory and Compliance Requirements
See Also
Project ID: 4711 Title: Kiefer Landfill- Module 5, Phase 1 Liner Construction Addenda:
Sacramento County
Due by 10/08/2026
Basic Information Title ASI Wellness Initiative, Project No: FL-2673 Agency CSU, Fullerton Department
State Government of California
Due by 10/30/2026
Project Summary Project ID: BRC0000673 Project Name: Construction Manager at Risk Pre-Construction and
La County
Due by 10/13/2026
Bid Solicitation # ANE127-AE-6504 Bid Solicitation # ANE127-AE-6504 Organization Name Architecture and Engineering
County of San Bernardino
Due by 10/01/2026