Addendum No. 2
IFB No. 26-22-SD
Spotsylvania County Fire Station 12
January 28, 2026
This Addendum is issued in accordance with the IFB Terms & Conditions and is intended to provide
additional information and clarification to Respondents.
This Addendum consists of three (3) items which are listed below and is an integral part of the IFB to
which it is attached and is incorporated therein and made part thereof by this reference.
Item 1 – Changes to IFB
1.01 The Bid Due Date has been extended to February 17th, 2026 at 1:00 PM.
1.02 REVISE IFB No.26-22-SD, § III, C. Bid Security, 2
Said Bid security is given as a guarantee that the Bidder will enter into a Contract if awarded the
Work and, in the case of refusal or failure to so enter into said Contract, the security shall be
declared forfeited to the County. If no Contract has been awarded or the Bidder has not been
notified of the acceptance of their Bid, within ninety (90) days of the Bid opening, the Bidder
may withdraw their Bid and request the return of their Bid security. If, at the County's request,
the Bidder agrees to extend and maintain their Bid beyond the specified ninety (90) days, their
Bid security will not be returned.
1.03 REMOVE Attachment F to IFB 26-22-SD – Bid Form and
REPLACE with Attachment F – Bid Form – REVISED, attached hereto as Attachment A.
1.04 REMOVE Attachment B to IFB 26-22-SD – Owner-Contractor-Agreement Draft and
REPLACE with Revised Owner-Contractor-Agreement, attached hereto as Attachment B.
1.05 SPECIFICATIONS
a. REPLACE specification section 01 10 00 SUMMARY in its entirety with the revised section
included with this addendum (Attachment C).
b. REPLACE specification section 01 21 00 ALLOWANCES in its entirety with the revised
section included with this addendum (Attachment D).
1.06 DRAWINGS (Attachment E)
a. REPLACE sheet A101 with the revised sheet included with this addendum
a. Corrected Master Equipment errors
Addendum 2
IFB 26-22-SD | Page 1 of 4
b. REPLACE sheet A601 with the revised sheet included with this addendum
a. Added Mockup Wall details
c. REPLACE sheet A821 with the revised sheet included with this addendum
a. Switched passthrough locker door swing
d. REPLACE sheet A900 with the revised sheet included with this addendum
a. Added new door frame type
e. REPLACE sheet CE124 with the revised sheet included with this addendum.
a. Part of RFI response
f. REPLACE sheet CU101 with the revised sheet included with this addendum.
a. Part of RFI response
g. REPLACE sheet ES302 with the revised sheet included with this addendum.
a. General Notes updated – Matched with rest of set and project manual
h. REPLACE sheet ET302 with the revised sheet included with this addendum.
a. General Notes updated – Matched with rest of set and project manual
i. REPLACE sheet E521 with the revised sheet included with this addendum
a. Added Missing ATS-LS breaker
j. REPLACE sheet M101B with the revised sheet included with this addendum
a. Restroom transfer air changed to supply air
k. REPLACE sheet ME801 with the revised sheet included with this addendum
a. Updated VAV Box Schedule due to new restroom air supply
l. REPLACE sheet P801 with the revised sheet included with this addendum
a. Plumbing Fixture Schedule updated for faucet to meet LEED requirements
Item 2 – Clarifications
2.01 An Owner’s Trailer will not be required; Contractor shall provide and maintain a temporary
trailer per specification 01 50 00.
2.02 The generator and two (2) ATSs will be provided by the Owner. One (1) ATS related to the fire
pump controller is included in the Contract scope and shall be furnished and installed by the
Contractor.
2.03 Quantities shown on the drawings are approximate and are provided for reference only. The
Owner makes no representation as to their accuracy. Bidders shall review the drawings and verify
quantities as necessary to prepare their bids.
2.04 Fees assessed by Rappahannock Electric Cooperative for utility coordination or service
connections related to this project shall be paid directly by the Owner.
Item 3 – Q&A
3.01 Regarding IFB No.26-22-SD, § III, C. Bid Security, 2 - We are requesting that the 180-day Bid
Bond Guarantee requirement be revised to the industry standard 30-60 calendar days. Holding
pricing firm for six months is challenging in the current construction market due to material
volatility and subcontractor/supplier quote limitations of 30-days or less. Maintaining a 180-day
requirement will increase the cost across all trades and decrease competition.
ANSWER: Please refer to Item 1, 1.01 of this Addendum.
3.02 a) Has there been an asbestos study performed on the existing dwelling to be removed?
ANSWER: No.
Addendum 2
IFB 26-22-SD | Page 2 of 4
b) If not, is the County planning to conduct this study and have any asbestos removed prior to the
contract demo of the building?
ANSWER: An asbestos study has not been completed. The owner has included an allowance
for testing and abatement of materials if required.
3.03 Can the engineer provide the intended limits along the dam of the Clay core that is shown on the
pipe profile?
ANSWER: See the attached CE124 with the clay core boundary in red.
3.04 Sheets CU 101 differs from sheets CU203 regarding hydrants, tees and other waterline items.
Which sheet should be used for bidding purposes.
ANSWER: The design team has reviewed Sheets CU-101 and CU-203 and did not identify any
conflicts or discrepancies related to hydrants, tees, or other waterline appurtenances. All fittings
appear to be shown in the correct locations and sizes.
If the bidder believes a specific contradiction exists between the sheets, please identify the exact
item(s) and location(s) for further review.
3.05 Should the contract use the structure heights for Sanitary Structures shown on the profile versus
those listed on sheet CU 101?
ANSWER: The sanitary structure heights shown on Sheet CU-101 shall be used for bidding
purposes. The table previously referenced contained outdated information and has been revised.
A revised Sheet CU-101 is attached hereto and supersedes the prior version. All bids shall be
based on the revised Sheet CU-101.
3.06 What is the duration of this project?
ANSWER: Please refer to the revised Owner-Contractor-Agreement, attached hereto as
Attachment B.
3.07 Are there liquidated damages associated with this project?
ANSWER: Yes. Liquidated damages apply to this project. Please refer to the revised Owner-
Contractor-Agreement, attached hereto as Attachment B.
3.08 Contractors receive pricing from subcontractors up until the bid submission deadline; therefore,
can Attachment G | Subcontractor Identification Form be submitted 48 business hours after bid
submission?
ANSWER: Attachment G of the Invitation for Bid shall be removed in its entirety. See
attachment A Section 4.18 Subcontractors and Supplies for contractual requirements.
ATTACHMENTS:
a. Addendum Attachment A – IFB Attachment F – Bid Form – REVISED
b. Addendum Attachment B – IFB Attachment B – Owner-Contractor-Agreement Draft - REVISED
c. Addendum Attachment C – Revised Section 01 10 00 SUMMARY
d. Addendum Attachment D – Revised Section 01 21 00 ALLOWANCE
e. Addendum Attachment E – Revised Drawings
f. Addendum Attachment F – Pre-Bid Attendance Log
Addendum 2
IFB 26-22-SD | Page 3 of 4
Respondents shall acknowledge receipt of this Addendum with Bid submission.
Vendor Name
Date
Signature
Title
Addendum 2
IFB 26-22-SD | Page 4 of 4
Addendum 2 – Attachment A
Finance | Procurement Division
8800 Courthouse Road | Spotsylvania, VA 22553
Phone: 540-507-7599
Attachment F
Bid Form - REVISED
PROJECT NAME: Spotsylvania County Fire Station 12
IFB NUMBER: 26-22-SD
FROM:
TOTAL BID PRICE
The Bidder agrees, if awarded the Contract, to execute the Construction of Spotsylvania County Fire
Station 12 as shown in the construction documents and plans titled “Spotsylvania County Fire Station
12” for the lump sum amount of:
A. Base Bid
$
B. Asbestos Study Allowance
$
C. Direct Capture Vehicle Exhaust System Allowance $
30,000.00
150,000.00
Total Lump Sum Amount (A&B)
$
Attachment F-revised