SCOR Stream Restoration and Riparian Area Reclamation Projects

Agency: County of Greenville
State: South Carolina
Type of Government: State & Local
NAICS Category:
  • 115310 - Support Activities for Forestry
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238910 - Site Preparation Contractors
  • 541330 - Engineering Services
  • 541620 - Environmental Consulting Services
  • 541690 - Other Scientific and Technical Consulting Services
Posted Date: Oct 9, 2024
Due Date: Oct 29, 2024
Solicitation No: IFB #25030
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID: IFB #25030

Title: SCOR Stream Restoration and Riparian Area Reclamation Projects

Addenda: 3

Release Date: 9/20/2024

Due Date: 10/29/2024

Post Information
Posted At:Fri, Sep 20, 2024 8:30 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

Greenville County has been awarded an ARPA-Funded Stormwater Infrastructure Program (ASIP) grant through the South Carolina Office of Resilience (SCOR) to establish a riparian forest and perform a restoration along the Reedy River watershed.

*This bid includes two separate projects at separate locations*

The Little Creek Stream Improvement and Riparian Area Reclamation project is intended to establish a riparian forest and perform a restoration along previously acquired floodplain buyout properties within the Reedy River watershed. It is a tributary in the upper Reedy River watershed. Near the confluence of Little Creek with the Reedy River, a group of multiple properties were acquired as part of Greenville County’s floodplain buyout program in 2010 to reduce flood risks near the intersection of Plano Drive and Vinson Drive. The proposed project consists of a 6.5-acre reforestation effort, and a one-sided (1,000-ft) and two-sided (400-ft) Priority 2 and 3 stream restoration.

The North Chastain Stream Restoration and Riparian Area Reclamation project is intended to establish a riparian forest and perform a restoration along previously acquired floodplain buyout properties within the Reedy River watershed. The proposed project is contained on County-owned property and consists of a 5.5-acre reforestation effort, a 600-ft Priority 2/3 (as categorized by the USACE) stream restoration of an unnamed tributary, and single-sided 600-ft Priority 3/4 stream restoration of Langston Creek.

The stream restoration work may include bank grading with the help of soil lifts, coir matting, turf reinforcement matting, boulder walls and bank toe treatments (toe rock, toe wood, and boulder toes(s)). They will also include the installation of instream features such as cross vane(s), boulder/constructed riffle(s), stream drop(s), j-hook vane(s), and single arm vane(s). Additionally, these projects may include re-routing or daylighting of streams.

** Notice to Proceed (NTP) contingent on all pending permit approvals **

Background

Much of the property around these projects was acquired as part of Greenville County’s floodplain buyout program in 2010, when the County acquired properties to reduce flood risks in the area. The proposed projects include a mix of instream improvements and other stormwater BMPs designed to improve water quality, reduce nutrients, improve ecological function in the watershed that is part of a larger, multi-organizational effort to improve water quality and facilitates future expansion of the trail system in the Reedy River Watershed.

By stabilizing streams and restoring it’s surrounding vegetation, streams become much less likely to erode, and by reducing velocity and sediment loading, reduce the risk of downstream problems. Additionally, reforesting the areas along streams help to further bolster a stream’s resistance to erosion. In general, reforesting also reduces stormwater volume, reduces pollutant loadings, and increases ecological diversity. The County believes the combination of these practices will help to protect and restore its waterways, reduce flooding and risk to infrastructure, and increase its resiliency well into the future.

Timeline
Release Project Date:
September 20, 2024
Pre-Proposal Meeting (Mandatory):
October 9, 2024, 10:00am
301 University Ridge
Suite N-2400
Greenville, SC 29601

A site visit to each location will follow.
Question Submission Deadline:
October 15, 2024, 5:00pm
Proposal Submission Deadline:
October 29, 2024, 3:00pm
Review of Bids:
October 29 - November 8, 2024
Tentative Date of Intent to Award:
November 8, 2024
Contract Negotiations:
November 8 - 22, 2024
Notice to Proceed:
November 22, 2024
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Number Deadline 2026070 RFP#2026070 SPARTANBURG COUNTY TIER 2 PENNY ROADWAY RECLAMATION- PROJECT BLUE

County of Spartanburg

Bid Due: 6/18/2026

Ad Title: Clock Tower Restoration Project Purchasing Agent/Entity: City of Camden Ad Publish

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/29/2026

System Campus Classification Method Solicitation Name Solicitation ID Status Round/Version Ends In Start

University of South Carolina

Bid Due: 6/22/2026

Ad Title: Furnish and Install New Canvas Covered Walkway Purchasing Agent/Entity: University of

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/22/2026