| Agency: | UCLA Capital Programs |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| Posted Date: | May 22, 2025 |
| Due Date: | Jun 10, 2025 |
| Solicitation No: | 944674.01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Project Name | School of Dentistry A0-121 & A2-122 Remodel | ||
| Project Number | 944674.01 | ||
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a lump sum contract are sought from prospective prime contractor bidders (hereafter “bidders”) for the following project:
The Department of Orthodontics at the School of Dentistry (SOD) proposes to renovate and reconfigure Offices A0-121, A0-121A, A0-121B, and A2-122; Storage Rooms A0-117B and A2-122A; Restrooms A0-119A, A0-119B, and A0-119C; Vestibule A2-130; Atrium A0-119UE; Corridor A0-119 and a portion of Corridor A0-115, all located on Level A of the SOD building, to meet current operational needs. The renovation area, totaling approximately 2,505 gsf (1,223 asf), would accommodate a new dental clinic, including a reception area, open clinic space, calming and quiet treatment rooms, a sterilization room, storage, and a mechanical support room for dental equipment. A new all-gender restroom would also be provided. The SOD is a 210,189 gsf (122,243 asf) eight-story building, plus two basement levels, constructed in 1966. The project scope includes the interior demolition of existing partitions, ceilings, and floorings; installation of new partitions, ceilings, and flooring; new interior finishes; installation and anchorage of equipment; upgrades and modifications to the exterior atrium landscaping; and upgrades and modifications to the mechanical, electrical, plumbing, lighting, fire sprinkler, and fire alarm systems to support the new program. New dental equipment would be procured separately. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS; ADDENDA, IF ANY; PQ CONFERENCE SIGN-IN SHEET; ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
||
| Estimated Construction Cost | $2,467,000.00 | ||
| Ad for PQ Sub | |||
| 908736.01 | |||
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
146222 - 146222 KIT, HYDRANT GUARD Status Stage Open Posted 6/11/2026 Bid Due
City of Los Angeles
Bid Due: 6/25/2026
Follow Y1JZ--Roof Repairs At PAD 36C261-26-AP-2499 | 640-26-2-5241-0017 | 640-26-114 | (VA-26-00042084) Active
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/01/2026
Project ID: 2026-RFP-0123 Title: Design-Build Services for a Hydrogen Fueling Station Addenda: 4
City of Pasadena
Bid Due: 6/18/2026
New Project for Bidding - Wastewater Shop Space Optimization Project Department: Public Works
City of Glendale
Bid Due: 6/17/2026