Shelby County
Tennessee
Lee Harris., Mayor
Questions and Answers IV
Issued: December 12, 2023
SB-I000844
Purchase & Installation of High-Density Mobile Shelving Unit
Shelby County Emergency
Criminal Court Clerk
TO ALL PROSPECTIVE BIDDERS:
The following questions were submitted by a potential vendor. Our answer is listed
in red below:
General
1. Due to the timing and nature of this project, we respectfully request a due date
extension to allow sufficient time to properly respond. We have extended the
due date to December 19, 2023.
2. Please confirm deadline for submitting requests for clarification. December 19th,
2023.
3. Please confirm when the final addendum will be issued prior to bid date. N/A
4. Please specify the labor requirement (union, non-union, prevailing wage) for this
project. N/A
5. Please confirm bid bonds and/or payment and performance bonds are/are not
required. N/A
6. Are there any seismic or floor loading concerns, or seismic or structural
calculations required? N/A
7. Please confirm if there will be any issuing anchoring mobile system rails into the
slab (post-tension cable, conduit, etc.) a. If so, please confirm who is responsible
for floor scanning and marking of obstructions. N/A
8. Are there any overhead obstructions to be concerned with? In addition, please
clarify the sprinkler system used and required clearance. Do any specific local or
national codes need to be taken into consideration? No overhead obstructions.
Portable Sprinklers are being used. No specific codes need to be taken into
consideration.
Specifications and Existing Conditions
1. Please confirm you will be supplying a complete specification for the mobile
system. We will supply the minimum specifications. Refer to the
scope/specification section of the bid and all current addendums.
2. There is a significant difference between rail type and installation method. To aid
in the apples-to-apples comparison effort, please confirm whether recessed or
surface mount rail is required. a. If recessed, will there be a 2nd pour, or troughs
in the concrete. Surface Mount.
b. If surface, is a floor and ramp desired. YES
3. Please confirm the type of control to be used on the system (mechanical assist,
powered). Mechanical Assist
4. Please confirm what safety is required. Common/Center stops.
5. Please provide below descriptions per carriage, if carriages are different from
each other: Carriages are the same.
a. Please confirm the type of shelving unit to be used on the carriages (4-Post,
Cantilever). i. Please confirm if we are to provide open or closed uprights. 4-
Post, open.
b. Please provide dimensions of carriage/shelving.
Minimum requirement specifications for each shelving unit.
Install a minimum of 32 shelving units to fill the square footage of the
space.
Must be a minimum of 120” of fixed height with Deck Panels.
Back-to-Back – Double rows
42"W x 18"D SF Letter/Legal Slotted Shelves
42"W x 30"D Slotted Shelf/unslotted shelves
42"W x 15"D Unslotted Shelf/Slotted Shelf
15”D adjustable file dividers (3 per shelf)
c. Please provide type of shelves (standard, slotted, or heavy-duty shelves)
Slotted/heavy duty.
d. Please provide quantity of shelving levels. A minimum of 120” of
fixed/moveable height (10 lateral shelves) per unit
e. Please provide accessories wanted. Adjustable file dividers for each unit and
index cardholders.
f. Please provide media weight per storage type. 1 lb files/5 Ib boxes
Drawings:
1. Please provide layout of mobile shelving system. Vendors are required to
provide their own layout of the system they will be installing.
2. Please provide an elevation view of mobile shelving system Vendors are
required to provide their own layout of the system they will be installing.
3. Please provide a CAD file of layout Vendors are required to provide their own
layout of the system they will be installing.
⚫ Page 2
Logistics
1. Please confirm the material handling conditions for the job site:
a. Will there be a loading dock available for our use during the entire project? If
so, will it accept a 53’ Truck/trailer? There is a parking lot on-site that can
accept a 53’ Truck/Trailer-Answered in previous questions. Access does
not require a loading dock.
b. What is the preferred path of travel from the loading dock to installation areas?
Parking Lot next to site.
c. Is a forklift permission to use on the jobsite? We will not provide a forklift.
Vendors will provide their own if needed.
1. I wanted to quickly ask about your existing mobile system in place. Is it a
Spacesaver High Density Mobile System? The tag on the unit has
spacesaver.
2. Upon a service visit, Spacesaver’s local area contractor _____________ can
determine what might need to be replaced or reused in the existing system.
This could be a cost/time friendly alternate from the current RFQ. The
reason we are replacing the existing shelving is because they are outdated,
worn and inoperable. We do not want any reused parts on the replaced
units. We want a new High-Density Mobile Shelving System.
Sincerely,
Signed Original on File
Carla J. Hayes, Buyer
Purchasing Department
Shelby County Government