SB018-26 Gwinnett Drive Widening Project
| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| Posted Date: | Feb 2, 2026 |
| Due Date: | Mar 3, 2026 |
| Solicitation No: | PE-66751-NONST-2026-000000079 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66751-NONST-2026-000000079 | SB018-26 Gwinnett Drive Widening Project | Lawrenceville, City Of |
Feb 02, 2026 @ 02:30 PM
|
Mar 03, 2026 @ 02:00 PM
|
Start Date: Feb 02, 2026 @ 02:30 PM ET
End Date:
Mar 03, 2026 @ 02:00 PM ET
Description
The work to be performed by the General Contractor consist of but is not limited to the following major items:
¿ EROSION CONTROL BMP¿s including mulch, tree save fence, temporary grassing, inlet sediment trap, silt fence, and sodding.
¿ TRAFFIC CONTROL during all stages, allowing traffic thru at all times.
¿ DEMOLITION including tree removal, clearing and grubbing.
¿ SITE WORK, EARTH WORK including grading and excavation.
¿ CONCRETE PAVING including remove and replace concrete curb & gutter, sidewalks, and driveways.
¿ STORM DRAIN STRUCTURES including storm sewer structures.
¿ STORM DRAIN PIPE including RCP (type 3), exacavation, bedding, compaction, and dewatering.
¿ PAVING, PAVEMENT STRIPING, SIGNAGE, TRAFFIC LOOPS.
¿ PEDESTRIAN LIGHT POLES; HANDRAILS; FIRE HYDRANT.
¿ Re-grout all exist. structures & site clearing.
¿ The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications.
¿ All work shall comply with all Federal, State, and local requirements and specifications.
¿ The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project.
¿ Work to be completed during night time. Operations to start 9 PM and finish by 5 AM during bussiness days.
| Code | Description |
| 91327 | Construction, Highway and Road |
Chris Duncan
chris.duncan@lawrencevillega.org
6784076421
See Also
Project: Public Safety Complex and Fire Station #12 Roof Improvements Ref. #: 26-79-1620
Forsyth County
Due by 10/01/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-65800-NONST-2026-000000113
State Government of Georgia
Due by 10/01/2026
27-003-LH Bondsview Road Maintenance - RFB (10/15/26) September 2, 2026 Published by ntharpe
Macon Bibb County
Due by 10/15/2026
Project: Twin Forks Facility Improvements Ref. #: 2026.TwinForks.01 Type: RFP Status: Open Open
Cherokee County School District
Due by 9/24/2026